| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.0 LAccepted-AOC | L1 | Accepted-AOC L1 approved | |
| 2 | L2₹11.2 L+₹24,495.08 (2.23%)Rejected-AOC | L2 | Rejected-AOC L2 rejected | |
| 3 | Rejected-Technical | - | Rejected-Technical valid registration certificate not submutted | |
| 4 | Rejected-Technical | - | Rejected-Technical L6 | |
| 5 | Rejected-Technical N M 3 638 VP BUILDING | - | Rejected-Technical L5 |
| Sl No | Description | Qty | Unit | C SHOWKATHALI L6 | Rajeshkumar L2 | Jyothish L3 | SAJEEV A L4 | Nilambur Taluk Labour Contract Co-operative Society Limited L5 | AMARAMBALAM LABOUR CONTRACT COOPERATIVE SOCIETY LTD L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Building construction | |||||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 17.82 | cum | 298.84 ₹5,325.33 | 258.62 ₹4,608.61 | 264.38 ₹4,711.25 | 268.96 ₹4,792.87 | 298.84 ₹5,325.33 | 252.19 ₹4,494.03 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 1.19 | cum | 6,857.6 ₹8,146.83 | 5,934.57 ₹7,050.27 | 6,066.92 ₹7,207.5 | 6,171.84 ₹7,332.15 | 6,657.61 ₹7,909.24 | 5,786.99 ₹6,874.94 Lowest |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 5.44 | sqm | 337.42 ₹1,835.56 | 292 ₹1,588.48 | 298.52 ₹1,623.95 | 303.68 ₹1,652.02 | 337.42 ₹1,835.56 | 284.74 ₹1,548.99 Lowest |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 3.31 | cum | 8,040.94 ₹26,631.59 | 6,958.63 ₹23,046.98 | 7,113.82 ₹23,560.97 | 7,236.85 ₹23,968.45 | 8,040.95 ₹26,631.63 | 6,785.59 ₹22,473.87 Lowest |
| 1.00 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 118.46 | sqm | 869.03 ₹1,02,941.82 | 752.06 ₹89,086.02 | 768.83 ₹91,072.53 | 782.13 ₹92,647.99 | 869.05 ₹1,02,944.19 | 733.36 ₹86,870.89 Lowest |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 142.29 | sqm | 653.88 ₹93,040.59 | 565.87 ₹80,517.64 | 578.49 ₹82,313.34 | 588.49 ₹83,736.24 | 653.89 ₹93,042.01 | 551.8 ₹78,515.62 Lowest |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 159 | sqm | 820.86 ₹1,30,516.74 | 710.37 ₹1,12,948.83 | 726.21 ₹1,15,467.39 | 738.77 ₹1,17,464.43 | 820.89 ₹1,30,521.51 | 692.71 ₹1,10,140.89 Lowest |
| 1.01 | 5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases) | 22.7 | sqm | 737.13 ₹16,735.06 | 637.91 ₹14,482.47 | 652.14 ₹14,805.53 | 663.42 ₹15,061.62 | 737.12 ₹16,734.84 | 622.05 ₹14,122.4 Lowest |
| 1.01 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 94.8 | metre | 205.21 ₹19,453.91 | 177.59 ₹16,835.53 | 181.55 ₹17,210.94 | 184.69 ₹17,508.61 | 205.21 ₹19,453.91 | 173.17 ₹16,416.52 Lowest |
Tender Value
₹12.7 L
EMD Value
₹31,776
Closing Date
27 May 2025, 6:00 pmClosed
DEEPTHY SATHEESH
LID EW SECTION AMARAMBALAM GRAMA PANCHAYATH
Amarambalam GP project no 149 25 Construction of building for Kudumbasree Construction of building for Kudumbasree General Civil Work
2025_LSGD_765158_14
01/2026/AE/LID EW/AMR
Open Tender
Civil Works - Buildings
Item Rate
180 days
POOKKOTTUMPADAM
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹31,776
Yes
25 Aug 2025
19 May 2025
30 May 2025
19 May 2025
27 May 2025
19 May 2025
Amount
Building construction
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases)
5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for: Edges of slabs and breaks in floors and wallsUnder 20 cm wide
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
Rajeshkumar (BID ID -2215954)
Jyothish (BID ID -2216466)
SAJEEV A (BID ID -2216568)
Nilambur Taluk Labour Contract Co-operative Society Limited (BID ID -2216784)
C SHOWKATHALI (BID ID -2215943)
Bidder Name
Jyothish
Rajeshkumar
C SHOWKATHALI
SAJEEV A
AMARAMBALAM LABOUR CONTRACT COOPERATIVE SOCIETY LTD
Nilambur Taluk Labour Contract Co-operative Society Limited
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1246584.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .