Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 CrAccepted-AOC | ₹3.0 Cr Quoted ₹3.2 Cr | L1 | Accepted-AOC LI |
| 2 | L2₹3.8 Cr+₹59.8 L (18.9%)Rejected-AOC | ₹3.8 Cr+₹59.8 L (18.9%) | L2 | Rejected-AOC L2 |
| 3 | L 3₹3.8 Cr+₹62.2 L (19.7%)Rejected-AOC SHERLYBHAVAN KOONANVENGA PANAVOOR THIRUVANANTHAPURAM 695568 | THIRUVANANTHAPURAM | KERALA | 695568 | ₹3.8 Cr+₹62.2 L (19.7%) | L 3 | Rejected-AOC L3 |
| 4 | L4₹3.8 Cr+₹65.8 L (20.8%)Rejected-AOC | ₹3.8 Cr+₹65.8 L (20.8%) | L4 | Rejected-AOC L4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical Invalid licence |
Tender Value
₹3.5 Cr
EMD Value
₹1 L
Closing Date
26 Oct 2022, 5:00 pmClosed
Director
Inland Navigation Directorate, Asramam, Kollam-2
Travancore Heritage Circuit Kadinamkulam Anchuthengu back water tourism corridor project Construction of Boat terminal at Murukkumpuzha-Construction of Boat terminal at Murukkumpuzha
2022_Irrig_515572_1
IRR/IA/TR/2271/2022_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
365 days
murukkumpuzha
Please refer Tender documents.
7 documents required · 7 mandatory
₹8,270
Yes
₹1 L
Yes
31 Dec 2022
12 Oct 2022
29 Oct 2022
12 Oct 2022
26 Oct 2022
12 Oct 2022
Amount
Appendix - A Construction of Boat Jetty
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
60.2.5:BAILING OUT WATER USING PUMP ABOVE 20HP AND UP TO 30HP -Bailing out water with engine and pump set above 25HP and up to 30HP, including conveyance to site and errection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
OD4830/2022-2023:Ring bund Type-1 Putting up ring bund as per approved shape 3m bottom width, 1.5m top width using emptygunny/polythene bags filled with earth placed in 2 rows at 1.2m apart and filled in between with puddle clay to form bund for an average height 3m including labour dismantling the bund after completion of the work etc. complete.( base OD 60.1.1)<br>volume of bund (1.5+3)/2*3.00*20=135.00m3<br>volume of core 1.2*2.00*20=48.00m3<br>vol. of earth=13548=87.00m3<br>No. of bags 87/0.027=3223nos
OD4036/2022-2023::Providing floating plat form of size 12m x 7m on pontoon (as per drawing ) in steel work riveted or bolted in built up section etc., trusses and framed work M.S angle, iron plates, tees etc. straightening cutting, fabricating and hosting including applying one coat iron primer for pontoon including cost of materials, labour charges, mobilisation charges, current charges for welding etc. hire for winch, chain, hook etc.and launching in to the river and all other incidental charges including lighting etc. complete for piling in river portion. Total weight of Floating platform = 22055.70 Kg This platform can be used for 200 working days and cost is taken as 1/4th of its value for calculating the daily rent there fore, the weight of platform proportional to 1 day = 22055.70 x 1/200 x 1/4 = 27.569 Kg Out turn of pilling work 0.60 hrs for concreting as per DAR data for 600 mm pile + 0.15 hr for anchoring and shifting, total time = 0.75 hr for 20 m piling, time required = 20 x 0.75 = 15 hrs. ie, for 20 m piling work, the proportional weight of platform = 27.569/ * 15 = 51.692 Kg Chain block cost of chain block = 15000 cost of chain block per day = 1500 x 1/200 x 33/100 = 24.75 cost of chain block for 20 m piling = 204.75/8 * 15 = 46.41 Anchoring cost of anchoring = 36000 cost of anchoring per day = 36000 x 1/200 x 33/100 = 59.40 cost for 20 m piling = 59.40/8 *15 = 111.38 Mobilisation cost for 1 day 4 operator, 4 Mate & 1 boat is required for 1 day of operation. ie, for 20 m piling work, Operator = 4/8*15 = 7.50 nos, Mate = 4/8*15 = 7.50 nos & Boat = 1/8*15 = 1.875 days are needed
OD4843/2022-2023:12.23.3 Bored cast-in-situ M35 grade R.C.C. Pile Using Batching Plant, Transit Mixer and Concrete Pump excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. Pile diameter-600 mm Unit = meter Taking output = 20 m a) Materials
OD4857/2022-2023:Providing Steel Liner 10mm thick for Curbs and 6 mm thick for Steining of Wells including Fabricating and Setting out as per Detailed Drawing. Unit= 1 MT Taking out put = 1 MT a) Materia
OD4039/2022-2023:Chipping and removing extra length of RCC piles- Demolishing R.C.C work manually /by mechanical means including stacking of steel bars and disposal of UN serviceable material with in 50 m lead as pr direction of engineer-in -charge (as per 15.30 of DSR 2018)
OD4040/2022-2023::Providing Cast iron Bollards with approved drawings and design including cost of all materials, molding charges, cost of fixtures and all labour charges etc.complete(OBSERVED DATA) Rate for 13 nos 1) C i Bollards - Drawing,Pattern charges,Bolt hole making charges- 4 nos each,& Grinding charges-73013 2) C i Bollards- rough casting -49856 Total - 122869 rate for 1 no 9451.50 This rate is inclusive of 18% GST
20.6.1.2:Vertical load testing of piles in accordance with IS 2911( Part IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of engineer -in-Charge. Single pile upto 50 tonne capacityRoutine test
OD4041/2022-2023:Providing and laying in position machine batched and machine mixed design mix M-35 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in -charge. Note:- Cement content considered in this item is @330 kg/cum. Excess /less cement used as per design mix is payable/recoverable separately.All work up to plinth level
OD4042/2022-2023:Cement concrete for Reinforced concrete in pile cap complete as per drawing and Technical Specification in R C C Grade M 35- Using Batching plant, Transit Mixer and Concrete Pump (Morth 12.38.D.2) Unit=cum Taking out put=15 cum Material
OD4043/2022-2023:Providing and laying in position ready mixed M-30 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in -charge. Note:- Cement content considered in this item is @330 kg/cum. Excess /less cement used as per design mix is payable/recoverable separately.All work above plinth level upto floor V level
OD4044/2022-2023:Providing and laying in position machine batched and machine mixed design mix M?35 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve work-ability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.<br>All work up to plinth level Details of cost for 1. 00 cum MATERIAL:
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
5.23:Smooth finishing of the exposed surface of RCC work with 6mm thick cement mortar 1:3 ( cement : 3 fine sand).
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1/2:3 (cement : 11/2 coarse sand : 3 graded stone aggregate 20 mm nominal size)
6.3.2:Brick work with common burnt clay machine moulded perforated bricks of classdesignation 12.5 conforming to IS: 2222 in superstructure above plinth level up tofloor five level in cement mortar 1:6 (1 cement : 6 coarse sand):With Modular bricks
11.20.3:Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand).Dark shade pigment using ordinary cement
11.37:Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), including pointing the joints with white cement and matching pigment etc., complete.
21.1.1.2:Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate Z sections and other sections of approved make conforming to IS : 733 and IS: 1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminnium snap beading for glazing /paneling, C.P. brass/ stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-charge.(Glazing, paneling and dash fasteners to be paid for separately): For fixed portionPowder coated aluminium (minimum thickness of powder coating 50 micron)
21.1.2.2:For shutters of doors, windows & ventilators including providing and fixing hinges / pivots and making provision for fixing of fittings wherever required including the cost of EPDM rubber/ neoprene gasket required (Fittings shall be paid for separately)Powder coated aluminium (minimum thickness of powder coating 50 micron)
21.3.2:Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of Engineer - in -Charge. ( Cost of aluminium snap beading shall be paid in basic item):With float glass panes of 5.50 mm thickness
21.3.1:Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of Engineer - in -Charge. ( Cost of aluminium snap beading shall be paid in basic item):With float glass panes of 4.0 mm thickness
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
10.16.1:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes
10.26.3:Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer.G.I. pipes
10.28:Providing and fixing stainless steel (Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.)
12.48:Providing & fixing on roof pressed clay tile (Mangalore tile) of 20 mm nominal thickness and of approved size and as per approved pattern on steel frame work complete (steel frame work to be paid separately)
12.49:Providing & laying on roof pressed clay tile ridge (Mangalore tile) of 20 mm thickness and of approved pattern on steel frame work complete (steel frame work to be paid separately ).
OD4045/2022-2023:Supplying and fixing old tyre on the fender post to resist the impact of stopping boat (OBSERVED DATA)
60.64.1:Coconut Pile - Supplying and stacking well matured straight coconut post for driving down throug various strata bellow bed level including cost coveyance labour charges etc complete.
13.50.3:Applying priming coat:With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron /steel works
13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work
12.5.1:Providing valleys of 90 cm wide overall in plain G.S. sheet fixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limper and bitumen washers complete:1.60 mm thick with zinc coating not less than 350 gm/ m2
OD4047/2022-2023:Supplying and paving 50 mm thick rough granite slab hand cut and chisel dressed well on top for paving in floor of walkway laid over 20 mm thick cement mortar 1:4 with cement slurry as per the design of Architect <br> (as per 11.23 of DSR 2016)<br><br>Details of cost for 10 sqm
15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
9.124.2:Providing and fixing factory made 30 mm thick door shutter made of solid PVC foam profile. The styles & rails shall be of size 75 mm x 30 mm having wall thickness 5 mm. The styles, top & bottom rails shall have one side wall thickness of 15 mm integrally extruded on the hinge side of the profile for better screw holding power. The styles and rails shall be reinforced with M.S. tubes of size 33 mm x 17 mm x 1 mm, painted with primer, all four corners of reinforcement to be welded or sealed. Solid PVC extruded bidding (Push fit type) will be set inside the styles and the rails with a cavity, to receive single piece extruded 5 mm PVC sheet as panel. The styles and rails will be mitred cut and joint with the help of PVC solvent cement & self driven self tapping screws. Single piece extruded solid PVC lock rails of sixe 100mm x 30 mm with wall thickness 5 mm & 15 mm integrally extruded in the middle of the lock rail & fixed with styles with the help of PVC solvent cement & self driven self tapping screws of size 100 mm x 8 mm complete as per manufacturer's specifications and direction of Engineer -in-charge.Decorative finish (both side wood grained finish)
13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
16.68:Providing and laying 60 mm thick factory made cement concrete interlocking paver block of M - 30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge.
Appendix -B SIDE PROTECTION WORKS
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.23:Smooth finishing of the exposed surface of RCC work with 6mm thick cement mortar 1:3 ( cement : 3 fine sand).
KUNNATH CONSTRUCTIONS
C.S Abraham Piletech
Shibukumar S S
sunilkumar s
Bidder Name
Shibukumar S S
sunilkumar s
KUNNATH CONSTRUCTIONS
C.S Abraham Piletech
MRSCO BUILDERS PRIVATE LIMITED
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_739324.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .