Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 01 AGNI AUTOMATION AND SECURITY 01 KUNDAN BHAWAN SHIVAM VIHAR COLONY OPP KIET ENGG COLLEGE MURADNAGAR GHAZIABAD 201206 U P INDIA MURADNAGAR | GHAZIABAD | UTTAR PRADESH | 201206 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
18 Feb 2021, 12:00 pmClosed
E.E.E-400 KV S/S DIVISION-II MURADNAGAR
E.E.E-400 KV S/S DIVISION-II RAWALI ROAD MURADNAGAR GHAZIABAD
ANNUAL MAINTENANCE WORK OF INDUSTRIAL TYPE WITH 4 TON DOUBLE COMPRESSOR AND RESIDENTIAL TYPE SPLIT AC WITH 1.5 TON AT E-400 KV S/S DIV-II MURADNAGAR
2021_UPTCL_548322_1
T-10/E-400KVSSD-II/M/2020-21
Open Tender
Repair and Maintenance Services
Fixed-rate
365 days
E.E.E-400 KV S/S DIVISION-II MURADNAGAR
AS PER DOCUMENT WITH TENDERFORM
2 documents required · 2 mandatory
₹590
AS PER NIT
₹2,000
24 Feb 2021
25 Jan 2021
19 Feb 2021
25 Jan 2021
18 Feb 2021
25 Jan 2021
Amount
Industrial Air Conditioner
Cleaning Checking and repairing of outdoor and indoor unit cleaning of air filter of 8 Ton capacity plant AC Hitachi make with nylon brush soap and water and repairing of deterorated filtor if required with skilled technician at 400 KV S/S-II Muradnagar.
Checking of leakage for Mafron-22 gas and brazing of any leakage joint perfectly of 4 Ton plant AC and all other associated work including cost of material and skilled labour.
Recharging of Mafron-22 Gas in sufficeint quantity in compressor of 8 Ton plant AC including cost of material and skilled labour.
Split Type Air Conditioner
Cleaning Checking and repairing of outdoor and indoor unit cleaning of air filter of 1.5 Ton capacity Voltas make split air Condition with nylon brush soap and water and repairing of deterorated filtor if required with skilled technician at 400 KV S/S-II Muradnagar.
Checking of leakage for Mafron-22 gas and brazing of any leakage joint perfectly of 4 Ton plant AC and all other associated work including cost of material and skilled labour.
Recharging of Mafron-22 Gas in sufficeint quantity in compressor of 2 Ton Split AC including cost of material and skilled labour. Note-Above charges includes guarantee of one year from the date of agreementand responsibility of contractor to put in running condition of 12 Nos.4 Ton AC plants and 19 Nos.2 Ton AC plants at own cost.All defective parts will be provided by department excluding Mafron-22 Gas or equivalent Gas.
KAP ENTERPRISES
Agni Automation and Security
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .