Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance 19 TILAK BAZAR HISAR HARYANA 125001 | HISAR | HISAR | HARYANA | 125001 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance B 201 204 THE QUBE MV ROAD ANDRHERI EAST MUMBAI MUMBAI MAHARASHTRA 400059 | MUMBAI SUBURBAN | MAHARASHTRA | 400059 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
3 Sept 2021, 11:00 amClosed
GGM/EXPOTECH
RITES Limited, RITES Bhawan-I, 2nd Floor, Plot No.1, Sector 29 Gurgaon - 122001, Haryana
Engagement of freight forwarder for transportation of export project cargo consisting of 34 nos. Passenger Coaches ex. MCF, Raebareli, UP and approx. 200 CBM of spares ex. MCF, Raebareli, UP, RITES Warehouse, Delhi via Mumbai Port to Maputo Moz
2021_RITES_86318_1
2021/RITES/EXPO/MOZ/COACH/0821
Open Tender
Shipping Services
Works
90 days
Modern Coach Factory (MCF)
Please refer Tender documents.
3 documents required · 3 mandatory
₹18,000
Yes
RITES LTD
Exempted
3 Sept 2021
27 Aug 2021
3 Sept 2021
27 Aug 2021
3 Sept 2021
29 Aug 2021
27 Aug 2021 - 29 Aug 2021
Amount
All-inclusive cost for receiving, handling, lashing and securing of Passenger Coaches (without Bogies) on Trestles at MCF, Raebareli, U.P. and transportation to Mumbai sea port. List of activity including but need not limited to the following: i. Placement of Suitable trailers for loading and movement of coaches as per latest Government norms/ MORTH guidelines including permission /clearance from State RTOs/permission from all essential authorities from point of loading to destination. ii. Loading shall be the responsibility of the freight forwarder. iii. Lashing and Securing of Passenger Coaches onto suitable trailers for safe transportation to port of shipment. (The lashing, securing, handling, dunnage, wooden cut over, wooden wedges to be arranged by freight forwarder). iv. Transportation of Passenger Coaches to Mumbai sea port (Suitable trailers should be arranged by Freight Forwarder at the time of loading of Passenger Coaches. The overall height of the consignment with trailer height should not exceed Government norms)
Suitable trailers for Coach Uppers (without Bogies)
Suitable mechnical trailers for bogies for Coaches - each bogie weighs about 5 tonnes and are non-stackable (3 bogies per trailer)
All inclusive charges towards arranging 2 Nos. road mobile cranes of suitable capacity for being able to lift and load Coach Uppers on to the suitable trailers and Bogies of coaches on separate mechnical trailers, including lifting arrangement for Loading of 34 Passenger Coaches. (Other necessary items like rope, wire rope with sleeve, Nylon Belt, Cushions, D-Shackles etc shall be included)
Suitable Trestles for resting of Coach Uppers (2 nos per Coach Uppers) on the suitable trailers (Shall be exported along with the Coach Uppers) .
Suitable Lifting Arrangement for loading of Coach Uppers, including any longitudinal beams, tackles, wire rope, slings and transverse spreaders etc. (One set at MCF, One set at Mumbai Sea port and one set to be exported along with coaches to Maputo, Mozambique)
All-inclusive cost for transportation of spares including receiving / handling/Loading from MCF, Raebareli to Mumbai sea port.
Rate per 9 tonnes truck from MCF to Mumbai Port
Rate per 16 tonnes truck from MCF to Mumbai Port
All-inclusive cost for transportation of spares including receiving / handling/Loading from RITES warehouse, Delhi to Mumbai sea port
Rate per 9 tonnes truck from Delhi to Mumbai Port
Rate per 16 tonnes truck from Delhi to Mumbai Port
All-inclusive cost towards custom clearance of the Passenger Coaches at Mumbai sea port i.e. filing of shipping bill, custom examination etc. All activities related to Customs.
lot of 12 Coaches including bogies
Spares for coaches (Rate per CBM)
Packing charges for covering Complete Coach including bogies, so as to prevent any damage. Special attention would be required to protect the glasses of windows /doors etc. so as to prevent any damage during transit and water.
All – Inclusive cost towards covering of Complete Coach including bogies by good quality tarpaulin and its proper lashing with nylon rope.
All-inclusive Ocean Freight Charges for complete Lot of Passenger Coaches upper, bogies and spares Ex- Mumbai sea port to Maputo sea port, Mozambique. (Rates include loading of Lot on vessel at Mumbai Port and unloading at Maputo sea port, Mozambique by vessel own crane(s) / derricks/stevedoring/lashing/securing/dunnage/cut wood/ chains/saddle /clamps /labour / gang / equipment for welding/other required equipment etc. , berthing of vessel including delays at loading / unloading shipping ports etc complete) Rate US$
Coaches (including bogies) in about 2 to 3 Lots
Spares for Coaches (Rate per CBM)
CJ Darcl Logistics Limited
Total Movements Pvt Ltd
Kodan Solutions Pvt Ltd
LIFT AND SHIFT INDIA PVT LTD
DSV AIR & SEA PVT LTD
ALLCARGO LOGISTICS LIMITED
EXPRESS GLOBAL LOGISTICS PVT LTD
Boxco Logistics Infratrans Pvt Ltd
ASIATIC LOGISTICS PVT LTD
US Dollar
Portion of Quoted Rate in Currency
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
stage.html
html • 0.03 MB
finance_93516.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .