| 1 | L1₹34.7 LAccepted-AOC | L1 | Accepted-AOC LOWEST BIDDER, HENCE ACCEPTED | |
| 2 | L2₹46.0 L+₹8.0 L (21.1%)Rejected-Finance CIVIL LINE MATATILA ROAD TALBEHAT DISTT LALITPUR U P | TALBEHAT | LALITPUR | U P | L2 | Rejected-Finance Other than Lowest Bidder | |
| 3 | L3₹47.6 L+₹9.6 L (25.3%)Rejected-Finance | L3 | Rejected-Finance Other than Lowest Bidder | |
| 4 | L4₹47.8 L+₹9.8 L (25.9%)Rejected-Finance 00 VILL RATI KA NAGLA SIKANDRA RAO ROAD INDUSTRIAL HATHRAS UTTAR PRADESH 204212 | HATHRAS | UTTAR PRADESH | 204212 | L4 | Rejected-Finance Other than Lowest Bidder | |
| 5 | L5₹48.2 L+₹10.2 L (26.9%)Rejected-Finance 11 82 GROUND FLOOR BLOCK 11 KALYANPURI EAST DELHI DELHI 110091 | EAST DELHI | DELHI | 110091 | L5 | Rejected-Finance Other than Lowest Bidder |
| Sl No | Description | Qty | Unit | M/s Prem Associates L1 | M/S VIJAY SINGH L4 | M/s M R MAHANA L3 | A S ENTERPRISES L7 | Avion Industries L6 | Bharat Sales Corporation L5 | HARNAM SINGH ANIL SINGH L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches, n exc 1.5 m wide and n exc 1.5 m in depth or n exc 10 Sqm on plan and n exc 1.5 m in depth & getting out, for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes or for laying underground cable, pipe lines etc. in soft/ loose soil, complete all as specified & directed. | 88.4 | Cum | 140 ₹12,376 | 128 ₹11,315.2 | 111 ₹9,812.4 | 125 ₹11,050 | 150 ₹13,260 | 140 ₹12,376 | 100 ₹8,840 Lowest |
| 2.00 | Returning, filling in soil, including spreading, levelling, watering and well ramming in layers not exc 25 cm. complete all as specified and directed. | 64.4 | Cum | 40 ₹2,576 | 86 ₹5,538.4 | 44 ₹2,833.6 | 85 ₹5,474 | 100 ₹6,440 | 60 ₹3,864 | 20 ₹1,288 Lowest |
| 3.00 | Removing excavated material (soil) n exc. 50m distance and depositing where directed at a level n exc. 1.5 m above the starting point, complete all as specified and directed. | 24 | Cum | 40 ₹960 | 128 ₹3,072 | 55 ₹1,320 | 125 ₹3,000 | 60 ₹1,440 | 100 ₹2,400 | 20 ₹480 Lowest |
| 4.00 | M&L dry river clean Sand filling in trenches around underground cables for earth cushion, complete all as specified and directed. (Depth of sand shall be measured after punning). | 5.4 | Cum | 450 ₹2,430 | 1,230 ₹6,642 | 455 ₹2,457 | 1,250 ₹6,750 | 650 ₹3,510 | 700 ₹3,780 | 350 ₹1,890 Lowest |
| 5.00 | Supplying and laying in renewal of un-reinforced precast concrete cable cover, class HVP, type 1 with peak, size 300mm x 180mm x 40mm laid dry and flat adjoining each other over sand cushion in trenches as protection to UG cable, complete all as specified and directed. | 889 | Each | 35 ₹31,115 | 59 ₹52,451 | 44 ₹39,116 | 55 ₹48,895 | 75 ₹66,675 | 45 ₹40,005 | 30 ₹26,670 Lowest |
| 6.00 | Dismantling old existing ACSR conductor of any type/size complete all as specified and directed. | 2 | Qtl | 200 ₹400 | 520 ₹1,040 | 909 ₹1,818 | 550 ₹1,100 | 800 ₹1,600 | 800 ₹1,600 | 110 ₹220 Lowest |
| 7.00 | M & L for hardcore broken stone or boulders crushed aggregate of size 25 to 40 mm, deposited, spread and levelled in layers n exc. 15 cm thick, watered and rammed to a true surface at 4 Pole, 2 Pole strucutres and other E&M Installations complete all as specified and directed. | 198 | Cum | 801 ₹1,58,598 | 1,560 ₹3,08,880 | 1,212 ₹2,39,976 | 1,550 ₹3,06,900 | 1,650 ₹3,26,700 | 1,700 ₹3,36,600 | 450 ₹89,100 Lowest |
| 8.00 | Demolition of old u/s existing transformer foundation and M & L for construction of plateform of size 2500 x 2500 x 1200mm with brick construction in cement mortar 1:4 PCC (M-10 nominal mix) in foundation, 100mm thick RCC M-25 grade slab, with & including 8mm MS TMT bars 120mm c/c on bothway, brick masonary steps on one side XPM Jali fixed on angle iron 40x 40x6 mm post upto height of 8 feet above ground level and openable gate with locking arrangment including making provision for entry and exit of HT/LT cables and steps made to access to the top of plateform including plastering to bricks masonary complete including painting with 2 coats of whitewash on plastered surface and painting steel surface with 2 coats of red oxide primer complete all as specified and as diredted. | 3 | Each Job | 1,15,000 ₹3,45,000 | 2,20,900 ₹6,62,700 | 2,00,000 ₹6,00,000 | 2,50,000 ₹7,50,000 | 2,30,000 ₹6,90,000 | 55,000 ₹1,65,000 Lowest | 2,10,000 ₹6,30,000 |
| 9.00 | M&L for cross arms, bracings, supports, clamps and back plates fabricated from structural steel sections including nuts, bolts, washers welding, bending cold or hot, drilling holes for bolts, in any hape or size as indicated or directed and inclusive of one primer coat, one under coat and one finishing coat of paint & including dismantling of old unserviceable cross arms of MS channel or angle sections etc complete all as specified and directed. | 1.78 | Qtl | 14,000 ₹24,920 | 14,210 ₹25,293.8 | 15,000 ₹26,700 | 14,500 ₹25,810 | 14,500 ₹25,810 | 12,000 ₹21,360 Lowest | 13,000 ₹23,140 |
| 10.00 | S& F in renewal of rolled mild steel as in plates (plain or chequered) channels, square cut or notched (ordinary and counter sunk) forming holes, with rivetted /bolted .welded attachment used to cover ducts in HT installations complete all as specified and directed. | 200 | Kg | 140 ₹28,000 | 149 ₹29,800 | 133 ₹26,600 | 150 ₹30,000 | 150 ₹30,000 | 160 ₹32,000 | 100 ₹20,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹80,000
Closing Date
3 Mar 2026, 6:00 pmClosed
GARRISON ENGINEER
DADWARA KOTA RAJASTHAN 324002
REPAIR/ MAINTENANCE OF TRANSFORMER AND HT EXTERNAL ELECTRIFICATION AND CONNECTED WORKS IN NORTHERN AND CENTRAL SECTOR AT MIL STN KOTA
2026_MES_752394_1
9025E8
Open Tender
Electrical and Maintenance Works
Item Rate
183 days
MIL STN KOTA
AS PER TENDER DETAILS
8 documents required · 8 mandatory
₹500
Yes
GE KOTA
₹80,000
Yes
27 Mar 2026
12 Feb 2026
10 Mar 2026
12 Feb 2026
3 Mar 2026
26 Feb 2026
Each Job
Each Set
Each Set
Each Job
Each Job
Each Job
Each Job
Each Job
Each Job
Each Job
Each Job
Each Job
Each Job
Each Set
Each Job
Each Job
Each Job
Each Job
Each Job
Each Job
Each Job
Each Job
Each Job
Each Set
Each Set
Each Set
Each Set
Each Job
Per Ltrs
Per Ltrs
Each Job
Each Job
Each Job
Each Job
Each Job
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
9025Tenderdoc.pdf
Tender Documents • 1.15 MB
BOQ_842718.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .