Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹93.9 LAccepted-Finance | L1 | Accepted-Finance Quoted Lowest amount. | |
| 2 | L2₹94.5 L+₹61,673.48 (0.66%)Accepted-Finance B 3 KRISHNA PARK SOCIETY SAI CHOKDI MANJALPUR VADODARA 390011 | VADODARA | GUJARAT | 390011 | L2 | Accepted-Finance Quoted higher amount than L1. | |
| 3 | L3₹97.6 L+₹3.7 L (3.99%)Accepted-Finance 307 AGGARWAL PLAZA L S C CU BLOCK PITAMPURA DELHI 110088 | NORTH | DELHI | 110088 | L3 | Accepted-Finance Quoted higher amount than L1. | |
| 4 | Rejected-Technical | - | Rejected-Technical Technically Disqualified because experience and site visit undertaking not as per ATC | |
| 5 | Rejected-Technical 1103 ARUNAACHAL BUILDING 19 BARAKHAMBA ROAD NEW DELHI 110001 | NEW DELHI | DELHI | 110001 | - | Rejected-Technical Technically Disqualified because turnover not self attested |
| Sl No | Description | Qty | Unit | ABHUJI PANAJI VANZARA L1 | P A SALES CORPORATION L3 | OM SAI INFRASTRUCTURE L2 |
|---|---|---|---|---|---|---|
| 1.00Execution of work under following items | ||||||
| 1.01 | Towards the demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer - in- charge. (Including all the materials & labour charges etc. complete as direction by site in charge) | 34.91 | Cum | 3,590 ₹1,25,326.9 Lowest | 4,350 ₹1,51,858.5 | 3,600 ₹1,25,676 |
| 1.02 | Towards dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meters lead. (Including all the materials & labour charges etc. complete as direction by site in charge) | 1,017.46 | Sqm | 60 ₹61,047.6 Lowest | 115 ₹1,17,007.9 | 70 ₹71,222.2 |
| 1.03 | Towards demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar. (Including all the materials & labour charges etc. complete as direction by site in charge) | 10.75 | Cum | 2,085 ₹22,413.75 Lowest | 2,185 ₹23,488.75 | 2,100 ₹22,575 |
| 1.04 | Towards dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. For thickness of tiles above 25 mm and up to 40 mm. (Including all the materials & labour charges etc. complete as direction by site in charge) | 161.38 | Sqm | 75 ₹12,103.5 Lowest | 115 ₹18,558.7 | 90 ₹14,524.2 |
| 1.05 | Earth work in excavation by manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. (Including all the materials & labour charges etc. complete as direction by site in charge) | 2.3 | Cum | 260 ₹598 Lowest | 385 ₹885.5 | 2,200 ₹5,060 |
| 1.06 | Towards the supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. (Including all the materials & labour charges etc. complete as direction by site in charge) | 3.45 | Cum | 2,165 ₹7,469.25 Lowest | 2,464 ₹8,500.8 | 2,205 ₹7,607.25 |
| 1.07 | Towards providing and laying in position cement concrete (pcc) of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1 Cement: 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) (Including all the materials & labour charges etc. complete as direction by site in charge) | 2.3 | Cum | 302 ₹694.6 Lowest | 7,846 ₹18,045.8 | 310 ₹713 |
| 1.08 | Towards the centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platform. (Including all the materials & labour charges etc. complete as direction by site in charge) | 2.3 | Sqm | 935 ₹2,150.5 Lowest | 1,185 ₹2,725.5 | 940 ₹2,162 |
| 1.09 | Towards the centering and shuttering including strutting, propping etc. and removal of form for: Lintels, beams, plinth beams, girders, bressummers and cantilevers. (Including all the materials & labour charges etc. complete as direction by site in charge) | 116.32 | Sqm | 741 ₹86,193.12 Lowest | 950 ₹1,10,504 | 750 ₹87,240 |
Tender Value
₹93.0 L
EMD Value
₹2.3 L
Closing Date
25 Feb 2026, 2:00 pmClosed
Superintending Archaeologist
Purrattatva Bhawan, Nr Central Library Vadodara
Civil work, electrical work , plumbing work, sanitary work and other miscellaneous work etc
2026_ASI_896879_1
53/12/EST/ST-M/2025-26- 10949
Open Tender
Civil Works
Works
120 days
Modhera
please refer tender documents
8 documents required · 8 mandatory
₹0
₹2.3 L
Yes
3 Mar 2026
4 Feb 2026
26 Feb 2026
4 Feb 2026
25 Feb 2026
4 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Execution of work under following items | |||||
| 1.01 | Towards the demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer - in- charge. (Including all the materials & labour charges etc. complete as direction by site in charge) | 34.91 | Cum | 3,551.25 | ₹1,23,974.14 |
| 1.02 | Towards dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meters lead. (Including all the materials & labour charges etc. complete as direction by site in charge) | 1,017.46 | Sqm | 54.65 | ₹55,604.19 |
| 1.03 | Towards demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar. (Including all the materials & labour charges etc. complete as direction by site in charge) | 10.75 | Cum | 2,060.2 | ₹22,147.15 |
| 1.04 | Towards dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. For thickness of tiles above 25 mm and up to 40 mm. (Including all the materials & labour charges etc. complete as direction by site in charge) | 161.38 | Sqm | 73.4 | ₹11,845.29 |
| 1.05 | Earth work in excavation by manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. (Including all the materials & labour charges etc. complete as direction by site in charge) | 2.3 | Cum | 260.3 | ₹598.69 |
| 1.06 | Towards the supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. (Including all the materials & labour charges etc. complete as direction by site in charge) | 3.45 | Cum | 2,123.75 | ₹7,326.94 |
| 1.07 | Towards providing and laying in position cement concrete (pcc) of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1 Cement: 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) (Including all the materials & labour charges etc. complete as direction by site in charge) | 2.3 | Cum | 7,294.7 | ₹16,777.81 |
| 1.08 | Towards the centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platform. (Including all the materials & labour charges etc. complete as direction by site in charge) | 2.3 | Sqm | 927.25 | ₹2,132.67 |
| 1.09 | Towards the centering and shuttering including strutting, propping etc. and removal of form for: Lintels, beams, plinth beams, girders, bressummers and cantilevers. (Including all the materials & labour charges etc. complete as direction by site in charge) | 116.32 | Sqm | 736.4 | ₹85,658.05 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.40 MB
suntemple.pdf
Tender Documents • 4.39 MB
BOQ_942716.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .