Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.5 LAccepted-AOC | ₹41.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹42.0 LRejected-AOC ELAVUMKUDY ALLEPRA P O PERUMBAVOOR 683556 | ERNAKULAM | KERALA | 683556 | ₹42.0 L | L2 | Rejected-AOC L2 |
| 3 | L3₹42.8 LRejected-AOC | ₹42.8 L | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | RINIL JAMES GEORGE L2 | ELIAS SUNNY L1 | AKHILNATH TV L3 |
|---|---|---|---|---|---|---|
| 1.00compound wall | ||||||
| 1.00 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 16.8 | cum | 1,500 ₹25,200 | 2,200 ₹36,960 | 2,249.4 ₹37,789.92 |
| 1.00 | OD119962/2023-2024:Engaging coolies | 14 | each | 900 ₹12,600 | 1,000 ₹14,000 | 957.6 ₹13,406.40 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 445.51 | cum | 300 ₹1.3 L | 280 ₹1.2 L | 318.3 ₹1.4 L |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 165.75 | cum | 110 ₹18,232.50 | 450 ₹74,587.50 | 115.9 ₹19,210.43 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 30.67 | cum | 6,500 ₹2.0 L | 6,800 ₹2.1 L | 7,019.8 ₹2.2 L |
| 1.01 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 33.21 | cum | 7,000 ₹2.3 L | 7,000 ₹2.3 L | 7,383.1 ₹2.5 L |
| 1.01 | OD180866/2025-2026:Dry stone masonry for retaining wall using with departmental rubble as per drawing and technical specifications including cost and coveyance of all materials and labour charges etc .complete | 10.08 | cum | 1,520 ₹15,321.60 | 1,700 ₹17,136 | 1,518.3 ₹15,304.46 |
| 1.01 | OD180867/2025-2026:Dry Rubble masonry with hard stone in foundation and plinth including cost of bonding stone etc | 243.72 | cum | 4,165 ₹10.2 L | 4,300 ₹10.5 L | 4,257.2 ₹10.4 L |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 46.9 | cum | 8,600 ₹4.0 L | 9,000 ₹4.2 L | 9,281.5 ₹4.4 L |
Tender Value
₹48.4 L
EMD Value
₹50,000
Closing Date
25 Oct 2025, 2:00 pmClosed
The Executive Engineer
O/o of Executive Engineer,PWD Buildings Division Ernakulam
Construction of compound wall construction with DR masonry,RR masonry and solid block masonry
2025_PWD_812143_1
PWD/BLDG/TR/16329/2023_5_1_1/1
Open Tender
Civil Works - Buildings
180 days
Marampally
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
20 Jan 2026
18 Oct 2025
27 Oct 2025
18 Oct 2025
25 Oct 2025
18 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1356850.xls
BOQ • 0.32 MB
viewsbd.pdf
Tender Documents • 1.69 MB
Download all tender documents and submit your bid