| 1 | 1₹4.0 LAccepted-AOC | ₹4.0 L | 1 | Accepted-AOC Less than estimate |
| 2 | 2₹4.0 L+₹613 (0.15%)Rejected-AOC | ₹4.0 L+₹613 (0.15%) | 2 | Rejected-AOC Above estimate |
| Sl No | Description | Qty | Unit | G BALAJI L2 | C AZHAGESAN L1 |
|---|---|---|---|---|---|
| 1.00 | Dismandling the plain cement concrete road including all cost machinary all labour charges etc., complete asper department specification | 25 | m3 | 514.8 ₹12,870 | 514.02 ₹12,850.5 Lowest |
| 2.00 | Earth work open excavation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications.SS 20 A | 24 | m3 | 195.03 ₹4,680.72 | 194.73 ₹4,673.52 Lowest |
| 3.00 | Collection supply and filling Stone Dust from approved quarry including cost and Conveyance of all materials to site and all labor charges for filling etc., Complete. | 3 | m3 | 409.86 ₹1,229.58 | 409.23 ₹1,227.69 Lowest |
| 4.00 | Cement Concrete 1:4:8 Mix (one part cement, four part sand and Eight part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc. complete. Complying with std. specifications. | 11.1 | m3 | 5,763.78 ₹63,977.96 | 5,755.04 ₹63,880.94 Lowest |
| 5.00 | Supplying and erecting centering to sides and soffits including supports and strutting with necessary cross bracing for plain surface such as RCC slabs rectangular beams all beams lintels etc., centering for soffits upto 3 meter height using mild steel sheet of size 90 cm x 60 cm x 10 mm gauge with MS angles of size 25mm x 25mm x 3mm laid over silver oak (CW) joists of size 10cm x 6cm spaced upto 90cm c/c and casurina props or 10 cm to 13 cm dia spaced at 0.750 cm c/c complying with standard specifications as per TNDSS NO : 30 & 86. | 180 | m2 | 484.11 ₹87,139.8 | 483.37 ₹87,006.6 Lowest |
| 6.00 | Plain Cement concrete 1:2:4 (one cement, Two M.sand, four aggregate) using 20mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted,etc., complete complying with standard specfication. | 34 | M3 | 7,144.83 ₹2,42,924.22 | 7,134 ₹2,42,556 Lowest |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
28 Jul 2026, 3:00 pmClosed
Executive Officer
S.Kannanur Town Panchayat, Samayapuram, Tiruchirappalli District.
Construction of Storm Water Drain at Ward No.9 Teachers Colony in S.Kannanur Town Panchayat
2026_DTP_685614_1
General Fund 91-3/2026 A1
Open Tender
Civil Works - Others
Item Rate
60 days
S.Kannanur Town Panchayat
Please refer Tender documents.
1 document required · 1 mandatory
₹1,770
₹25,000
25 Aug 2026
14 Jul 2026
28 Jul 2026
14 Jul 2026
28 Jul 2026
14 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismandling the plain cement concrete road including all cost machinary all labour charges etc., complete asper department specification | 25 | m3 | 1.25 | ₹31.25 |
| 2 | Earth work open excavation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications.SS 20 A | 24 | m3 | - | - |
| 3 | Collection supply and filling Stone Dust from approved quarry including cost and Conveyance of all materials to site and all labor charges for filling etc., Complete. | 3 | m3 | - | - |
| 4 | Cement Concrete 1:4:8 Mix (one part cement, four part sand and Eight part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc. complete. Complying with std. specifications. | 11.1 | m3 | - | - |
| 5 | Supplying and erecting centering to sides and soffits including supports and strutting with necessary cross bracing for plain surface such as RCC slabs rectangular beams all beams lintels etc., centering for soffits upto 3 meter height using mild steel sheet of size 90 cm x 60 cm x 10 mm gauge with MS angles of size 25mm x 25mm x 3mm laid over silver oak (CW) joists of size 10cm x 6cm spaced upto 90cm c/c and casurina props or 10 cm to 13 cm dia spaced at 0.750 cm c/c complying with standard specifications as per TNDSS NO : 30 & 86. | 180 | m2 | - | - |
| 6 | Plain Cement concrete 1:2:4 (one cement, Two M.sand, four aggregate) using 20mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted,etc., complete complying with standard specfication. | 34 | M3 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_824132.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
BOQ_824132.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .