| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.0 LAccepted-AOC | ₹15.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹18.7 LRejected-AOC | ₹18.7 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | KOTTAYAM LABOUR CONTRACT CO OPERATIVE SOCIETY LTD K1235 L2 | SACHU SONY L1 |
|---|---|---|---|---|---|
| 1.00Construction and maintenance of retaining wall | |||||
| 1.00 | 60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 6.6 | cum | 696 ₹4,593.60 | 560 ₹3,696 |
| 1.00 | 60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 4.62 | cum | 1,577 ₹7,285.74 | 1,270 ₹5,867.40 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 126 | cum | 236 ₹29,736 | 190 ₹23,940 |
| 1.00 | OD41486/2025-2026:Common Approved OD-1.4 : Dry stone packing under foundation with good quality blasted
rubble including conveyance o
material and labour charges etc. complete as per direction of departmental officers at site. | 126 | cum | 3,254 ₹4.1 L | 2,618 ₹3.3 L |
| 1.00 | OD41487/2025-2026:Common Approved OD-1.2: Dry rubble masonry (without concrete levelling course) with good
quality blasted rubble and packing to compactness to lines and levels cost and conveyance of
all materials labour charges etc. complete as per direction of Departmental officers at site | 213.74 | cum | 4,702 ₹10.0 L | 3,784 ₹8.1 L |
| 1.01 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 43.71 | cum | 7,675 ₹3.4 L | 6,176 ₹2.7 L |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 26.4 | sqm | 355 ₹9,372 | 285 ₹7,524 |
| 1.01 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 6.56 | cum | 7,883 ₹51,744.01 | 6,343 ₹41,635.45 |
| 1.01 | OD47975/2025-2026:Removing water hyacinth and other vegitation and floating bodies from waterway cutting
collecting, conveying and disposing at places pointed out by the deprtmental officer at site with
all leads and lifts and other incidental charges such as hire charges for country boats and other
necessary equipments required for the work etc. complete as per the direction of depatrmental
officers at site | 1,215 | sqm | 13.24 ₹16,086.60 | 10 ₹12,150 |
Tender Value
₹20.3 L
EMD Value
₹50,000
Closing Date
26 Feb 2026, 6:00 pmClosed
Executive Engineer
Executive Engineer, K.D.Division, Thanneermukkom
GENERAL-NADAPPURAM THODUprotection work to nadappuram thodu leading to pithalassery padasekharam in ward no 20 in kurichy panchayath in changanassery LACGeneral Civil Work
2026_Irrig_837823_1
38/EE/KD/2025-26
Open Tender
Civil Works - Others
270 days
Kurichy
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
13 May 2026
19 Feb 2026
28 Feb 2026
19 Feb 2026
26 Feb 2026
19 Feb 2026
Construction and maintenance of retaining wall
60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
OD41486/2025-2026:Common Approved OD-1.4 : Dry stone packing under foundation with good quality blasted rubble including conveyance o material and labour charges etc. complete as per direction of departmental officers at site.
OD41487/2025-2026:Common Approved OD-1.2: Dry rubble masonry (without concrete levelling course) with good quality blasted rubble and packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
OD47975/2025-2026:Removing water hyacinth and other vegitation and floating bodies from waterway cutting collecting, conveying and disposing at places pointed out by the deprtmental officer at site with all leads and lifts and other incidental charges such as hire charges for country boats and other necessary equipments required for the work etc. complete as per the direction of depatrmental officers at site
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1411258.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
viewsbd.pdf
Tender Documents • 2.07 MB
BOQ_1411258.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid