Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others-Single_Bidder_eligible_hence_Rejected |
Tender Value
₹2.3 L
EMD Value
₹4,680
Closing Date
11 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW BARAMULLA
EXECUTIVE ENGINEER REW BARAMULLA
C/o sanitary complex near imambargah at tunjiharan Kangumdara ,Pyt Kungamdara,Block Khore Sherabad, Scheme ADP-PRI,year 2026-2027
2026_RDPR_317429_16
148/Xen/Rew/Bla/2026-27 Dated 23/07/2026
Open Tender
Civil Works
Percentage
30 days
BARAMULLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Rural Development and Panchayati Raj
₹4,680
26 Aug 2026
23 Jul 2026
12 Aug 2026
23 Jul 2026
11 Aug 2026
23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains incl disposal of soil, for all soils. | 9.63 | cum | - | - |
| 2 | Providing & Laying of Dry stone soling hand packed and plum in concrete | 2.36 | cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: in 1:4:8 using 40mm nominal size aggregate | 0.58 | cum | - | - |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 3.21 | cum | - | - |
| 5 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :Cement mortar 1:4 ( 1 cement : 4 coarse sand) upto plinth lvl | 7.26 | cum | - | - |
| 6 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 4.55 | cum | - | - |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 5.3.1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 0.76 | cum | - | - |
| 8 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement-all work upto plinth level in 1:1.5:3(1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size) complete. (Soakage pit/septic tank) | 0.51 | cum | 1 | ₹0.51 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level | 120.58 | kg | 1 | ₹120.46 |
| 10 | P/l of Pre Cast Concrete Rings with lids all include readto use complete job | 8 | no | - | - |
stage.html
html • 0.02 MB
finance_1040302.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.13 MB
BOQ_1040302.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].