Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹87,933.60Accepted-AOC SHANKAR MARKET JAYANT POST JAYANT DISTT SINGRAULI M P 486890 | SINGRAULI | SINGRAULI | MADHYA PRADESH | 486890 | ₹87,933.60 | L-1 | Accepted-AOC Techno-commercially Accepted L-1 Bidder |
| 2 | Rejected-Technical 01 KACHNI MOD KACHANI PO KACHANI DISTT SINGRAULI M P 486886 | SINGRAULI | SINGRAULI | MADHYA PRADESH | 486886 | - | - | Rejected-Technical L-2 Bidder |
| 3 | Rejected-Technical DUDHICHUA FOREST NURSARY KHADIA P O SHAKTINAGAR DISTT SONEBHADRA U P 231222 | KHADIA | SONEBHADRA | UTTAR PRADESH | 231222 | - | - | Rejected-Technical L-4 Bidder |
| 4 | Rejected-Technical | - | - | Rejected-Technical L-3 Bidder |
| Sl No | Description | Qty | Unit | M/s Ram Das L4 | SANTOSH ASSOCIATES L3 | BIMLA ASSOCIATES L2 | S A CONSTRUCTION L1 |
|---|---|---|---|---|---|---|---|
| 1.00Fabrication of rail trolley system for loading & unloading of various engine models in paint booth (Model - JPBM 700- used for painting of overhauled engines) installed in engine shop | |||||||
| 1.01 | Cost of material for fabrication of manual trolley (9 feet × 5 feet) using 100 mm MS channel, 16 mm MS Plate, MS wheels, handle etc and and cost of primer for applying steel primer coat to trolley | 450 | Kg | 155 ₹69,750 | 106 ₹47,700 | 85 ₹38,250 | 86 ₹38,700 |
| 1.02 | Manpower cost for cutting holes in iron mesh of paint booth, holes digging for foundation of pillars (12 nos), fitment of pillar bars in holes, filling cement in holes, installation of rails on pillars etc. (including alignment, cutting, welding)
Manpower requirement/day
Skilled - 1 no
Semi-skilled -1 no
Unskilled - 2 no
Note- Rails (17mm ×15mm) 36 feet length & pillars (19mm dia ×420mm height) for rail mounting will be under scope of ncl. | 10 | DAYS | 2,474 ₹24,740 | 2,561 ₹25,610 | 2,300 ₹23,000 | 2,561 ₹25,610 |
| 1.03 | Charges for tools and tackles | 10 | DAYS | 500 ₹5,000 | 950 ₹9,500 | 1,000 ₹10,000 | 500 ₹5,000 |
| 1.04 | PAINTING COST (2 ltr red oxide & 6 ltr enamel paint )
Red oxide for Sl. no 1.02 and two coats of oil paint for Sl. no. 1.01 & 1.02 of BoQ | 1 | Job | 2,100 ₹2,100 | 3,500 ₹3,500 | 3,500 ₹3,500 | 3,000 ₹3,000 |
| 1.05 | PAINTING CHARGES
including Skilled manpower- 1 manday for 02
days | 1 | Job | 1,520 ₹1,520 | 1,610 ₹1,610 | 1,500 ₹1,500 | 1,610 ₹1,610 |
| 1.06 | Contractor Profit on labor cost | 1 | LS | 2,626 ₹2,626 | 7,000 ₹7,000 | 4,000 ₹4,000 | 600 ₹600 |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - | - |
Tender Value
₹1.1 L
EMD Value
₹1,500
Closing Date
9 Feb 2026, 11:00 amClosed
GM (WORKS)
OFFICE OF GENERAL MANAGER WORKS, CWS JAYANT, NCL SINGRAULI MP 48690
Fabrication of rail trolley system for loading and unloading of various engine models in paint booth (Model JPBM 700 used for painting of overhauled engines) installed in engine shop
2026_NCL_351863_1
NCL/CWS/GM(W)/ENG/25-26/24 dated 27.01.2026
Open Tender
Miscellaneous Works
45 days
NCL CWS JAYANT
AS PER NIT
3 documents required · 3 mandatory
₹1,500
11 Apr 2026
27 Jan 2026
10 Feb 2026
27 Jan 2026
9 Feb 2026
28 Jan 2026
27 Jan 2026 - 2 Feb 2026
Fabrication of rail trolley system for loading & unloading of various engine models in paint booth (Model - JPBM 700- used for painting of overhauled engines) installed in engine shop
Cost of material for fabrication of manual trolley (9 feet × 5 feet) using 100 mm MS channel, 16 mm MS Plate, MS wheels, handle etc and and cost of primer for applying steel primer coat to trolley
Manpower cost for cutting holes in iron mesh of paint booth, holes digging for foundation of pillars (12 nos), fitment of pillar bars in holes, filling cement in holes, installation of rails on pillars etc. (including alignment, cutting, welding) Manpower requirement/day Skilled - 1 no Semi-skilled -1 no Unskilled - 2 no Note- Rails (17mm ×15mm) 36 feet length & pillars (19mm dia ×420mm height) for rail mounting will be under scope of ncl.
Charges for tools and tackles
PAINTING COST (2 ltr red oxide & 6 ltr enamel paint ) Red oxide for Sl. no 1.02 and two coats of oil paint for Sl. no. 1.01 & 1.02 of BoQ
PAINTING CHARGES including Skilled manpower- 1 manday for 02 days
Contractor Profit on labor cost
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_364682.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.60 MB
Annexures.pdf
Tender Documents • 0.26 MB
BOQ_364682.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid