Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-Finance | ₹2.1 Cr | L1 | Accepted-Finance Ist Lowest Bidder |
| 2 | L2₹2.2 Cr+₹6.6 L (3.14%)Rejected-Finance BHAGWATI COMPLEX UNCHAPUL KALA DHUNGI ROAD HALDWANI NAINITAL | NAINITAL | UTTARAKHAND | 244713 | ₹2.2 Cr+₹6.6 L (3.14%) | L2 | Rejected-Finance IInd Lowest Bidder |
| 3 | Not Admitted-Fee/PreQual/Technical 11 RAJPUR ROAD DEHRADUN UTTARAKHAND | DEHRADUN | UTTARAKHAND | 248001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2.1 Cr
EMD Value
₹4.2 L
Closing Date
6 Aug 2020, 3:00 pmClosed
Superintending Engineer
office of Superintending Engineer 4th Circle P.W.D. Rudrapur (U.S. Nagar)
Construction of motor roads from MPDG road to banskhera via village banskheri in Kashipur constituency, District Udham Singh Nagar, under State Sector.
2020_pwd_24876_1
1450/23M-04/2020 Date 04.07.2020
Open Tender
Civil Works - Roads
Item Rate
365 days
Kashipur
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
Executive Engineer C. D. P.W.D. Kashipur
₹4.2 L
Rudrapur
5 Sept 2020
9 Jul 2020
6 Aug 2020
9 Jul 2020
6 Aug 2020
10 Jul 2020
10 Jul 2020
Amount
Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. By Manual Means. In area of non-thorny jungle.
Construction of Subgrade and Earthen Shoulders.Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. Using naturally occuring gravel
By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401
Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.
Tack coat using VG-10 grade bitumen Over granular surfaces treated with primer @ 0.40 kg/sqm
20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.Case II By Mechnical Means Bitunim (VG-30)
Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 - case II type B using Bitumen (VG-30)
Brick on edge pavement with straight overburnt bricks laid on edge including preparation of subgrade to prescribed camber and including supply of bricks, filling joints with local sand and spreading blinding coat 1cm (3/8") depth of local sand over the entire surface and including supply of all materials, labour and T&P etc. required for proper completion of the work.
Interlocking Concrete Block Pavement Providing and Laying of Interlocking Concrete Block Pavements having thickness 80 mm as per drawings and Technical Specification Clause 1504.
Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out,construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.Ordinary soil
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:3:6
Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 Brick masonry in 1:4 cement mortar
Providing concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix (1:2:4)
Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 R.C.C grade M 20
Supplying, fitting, and placing TMT bar reinforcement in superstructure complete as perdrawing and technical specifications Clauses 1002, 1010 and 1202. (The reinforcement steel shall be procured from original (primary) steel producers as per clause no. 2011.3.1 of MORD specifications (First Revision'2014) and IS 1786:2008 clause no. 1.6)
Maintenance of Road for 3 Year
1st year Maintenance as per GCC and specifed in PCC (0.50% of total Civil Work)
2nd year Maintenance as per GCC and specifed in PCC (1.00% of total Civil Work)
3rd year Maintenance as per GCC and specifed in PCC (1.50% of total Civil Work)
ganda construction company
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .