Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.6 CrAccepted-AOC VIII 240 THERUVATH BUILDING UZHAVOOR P O KOTTAYAM KERALA 686634 | KOTTAYAM | KOTTAYAM | KERALA | 686634 | L1 | Accepted-AOC First Lowest | |
| 2 | L2₹37.0 Cr+₹42.6 L (1.17%)Rejected-AOC | L2 | Rejected-AOC Second Lowest | |
| 3 | L3₹40.4 Cr+₹3.8 Cr (10.4%)Rejected-AOC EDAYATH AYAVANA P O MUVATTUPUZHA | MUVATTUPUZHA | ERNAKULAM | KERALA | 686668 | L3 | Rejected-AOC Third Lowest |
Tender Value
₹34.1 Cr
EMD Value
₹5 L
Closing Date
2 Mar 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director
SreeBala Building, TC 11/339, 5th Floor, Keston Road, Nanthancode,Kowdiar P.O., Trivandrum-695003
Construction
2021_KRFB_413352_1
PWD/PQ-2020-2021/18497/PD KRFB
Open Tender
Civil Works - Roads
Item Rate
545 days
Thiruvananthapuram
Please refer Tender documents.
7 documents required · 7 mandatory
₹19,518
Yes
₹5 L
Yes
PMU KRFB
15 Nov 2021
9 Feb 2021
5 Mar 2021
9 Feb 2021
2 Mar 2021
9 Feb 2021
17 Feb 2021
120 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1APPENDIX :1 - SITE CLEARANCE AND DISMANTLING | |||||
| 1.01 | 2.1.1 : Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit.<br>
Girth from 300 mm to 600 mmCutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 300 mm to 600 mm | 20 | each | - | - |
| 1.02 | 2.1.2 : Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. <br>
Girth from 600 mm to 900 mmCutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 600 mm to 900 mm | 15 | each | - | - |
| 1.03 | 2.1.3 : Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. <br> Girth from 900 mm to 1800 mmCutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 900 mm to 1800 mm | 10 | each | - | - |
| 1.04 | 2.1.4 : Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit <br>Girth above 1800 mmCutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit Girth above 1800 mm | 5 | each | - | - |
| 1.05 | 2.3.2.A : Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness <br> In area of light jungle - By Mechanical Means<br>Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means | 2.11 | Hecter | - | - |
| 1.06 | 2.4.2.A : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres <br>
Cement Concrete Grade M-15 & M-20 - By Mechanical Means <br>Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement Concrete Grade M-15 & M-20 - By Mechanical Means | 329.8 | cum | - | - |
| 1.07 | 2.4.2.B : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres <br> Prestressed / reinforced cement concrete grade M-20 & above - By Mechanical Means<br>Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Prestressed / reinforced cement concrete grade M-20 & above - By Mechanical Means | 240.35 | cum | - | - |
| 1.08 | 2.4.4.B : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres <br> Dismantling Stone Masonry - Rubble stone masonry in cement mortar.<br>Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Rubble stone masonry in cement mortar. | 764.7 | cum | - | - |
| 1.09 | 3.15 : Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means <br>Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means | 42,011.9 | sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_587360.xls
BOQ Document • 0.32 MB
73013899.pdf
Tender Document • 0.04 MB
epaymentform.pdf
Tender Document • 0.05 MB
SBD.pdf
Tender Document • 2.09 MB
73013902.html
Tender Document • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .