| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.3 LAccepted-AOC | ₹45.3 L | L1 | Accepted-AOC Accept |
| 2 | L2₹45.4 LRejected-Finance | ₹45.4 L | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | G K Guna Bhala Sekar L1 | Rajakrishnan L2 |
|---|---|---|---|---|---|
| 1.00Name of the Work: Providing Drainage from Vangal Girls Hr.sec School to EVR Street H/O Vangal kuppuchipalayam | |||||
| 2.00 | Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification | 639.36 | M3 | 263.38 ₹1.7 L | 264.68 ₹1.7 L |
| 3.00 | Cement concrete 1:4:8 mix ( one cement four sand and eight aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication | 71.04 | M3 | 5,543.32 ₹3.9 L | 5,544.62 ₹3.9 L |
| 4.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical | 2,135.26 | M2 | 547.1 ₹11.7 L | 548.4 ₹11.7 L |
| 5.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.12 | M2 | 91,956.9 ₹11,034.83 | 91,958.2 ₹11,034.98 |
| 6.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 0.97 | M3 | 9,291.58 ₹9,012.83 | 9,292.88 ₹9,014.09 |
| 7.00 | Plain Cement Concrete 1:3:6 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 319.68 | M3 | 6,299.7 ₹20.1 L | 6,301 ₹20.1 L |
| 8.00 | Plastering walls with CM 1:5 12mm thick etc., complete | 266.4 | M3 | 284.32 ₹75,742.85 | 285.62 ₹76,089.17 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 6,91,213 ₹6.9 L | 6,92,016 ₹6.9 L |
Tender Value
Refer Docs
EMD Value
₹46,000
Closing Date
17 Feb 2026, 3:00 pmClosed
BDO(B.Pt), Karur
BDO(B.Pt), Karur
Providing Drainage from Vangal Girls Hr.sec School to EVR Street in Vangal kuppuchipalayam
2026_RDTN_654013_1
Providing Drainage from Vangal Girls Hr.sec School to EVR Street in Vangal kuppuchipalayam
Open Tender
Civil Works - Others
90 days
Karur Union Office
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹46,000
Yes
7 Mar 2026
10 Feb 2026
17 Feb 2026
10 Feb 2026
17 Feb 2026
10 Feb 2026
Name of the Work: Providing Drainage from Vangal Girls Hr.sec School to EVR Street H/O Vangal kuppuchipalayam
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 mix ( one cement four sand and eight aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Plain Cement Concrete 1:3:6 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Plastering walls with CM 1:5 12mm thick etc., complete
GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.57 MB
BOQ_784242.xls
BOQ • 0.53 MB
Download all tender documents and submit your bid