Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2,012.32Admitted-Finance | +60.60% | ₹2,012.32 | L1 | Admitted-Finance |
| 2 | L2₹2,130.10Admitted-Finance | +70.00% | ₹2,130.10 | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical Non-Responsive (due to registration certificate expired and EMD not deposited as per bid requirement) |
Tender Value
₹37.5 L
EMD Value
₹75,000
Closing Date
23 Mar 2026, 6:00 pmClosed
SE PHED City Circle Jodhpur
SE PHED City Circle Jodhpur
Rate Contract for the work of transportation of water through tankers under the jurisdiction of City Circle, PHED, Jodhpur
2026_PHCJO_545548_1
47/2025-26
Open Tender
Civil Works
180 days
SE PHED City Circle Jodhpur
As per TD
2 documents required · 2 mandatory
₹500
32133 EE City Div. IV Jodhpur
₹75,000
Yes
27 Mar 2026
12 Mar 2026
24 Mar 2026
12 Mar 2026
23 Mar 2026
12 Mar 2026
PHED O&M BSR 2020 8.1 Transportation of drinking water by road through tractor with tanker of capacity 4000 LTR. The payment of TOW work shall be done on the basis of tanker trip reports received from GSM and GPS based real time water tanker tracking management information system. To access this Application contractor has to provide one android mobile phone with internet connection to each tanker driver and each tanker need to be fitted with 40mm" dia good quality transparent uPVC/PVC pipe with floating PVC ball & level scale and connected to bottom of tanker as per direction of EIC. No extra payment shall be done to contractor for such items. Water is to be arranged by contractor as per directions of EIC and the transportation is to be carried as per scope of work and directions issued by department time to time.
PHED O&M BSR 2020 8.1.1 Total Travel distance from filling point to supply point and back to filling point up to 5 KM.
PHED O&M BSR 2020 8.1.2 Total Travel distance from filling point to supply point and back to filling point up to 5 KM to 10 KM.
PHED O&M BSR 2020 8.1.3 Total Travel distance from filling point to supply point and back to filling point up to 10 KM to 15 KM.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
TD47SPPP.pdf
Tender Documents • 3.31 MB
BOQ_972954.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid