Tender Value
₹5.7 L
EMD Value
₹5,700
Closing Date
6 Feb 2020, 5:00 pmClosed
Superintending Engineer
33/11 KV S/S Hospital Chauraha, Bahraich
Shifting of HT/LT Line and 100/250 KVA T/F Near Medical College Gate Mohalla Akbarpura for Unit Parbhari Govt. Allopathic Collage Unit, Bahraich against Deposit Scheme under Electricity Distribution Division-I, Bahraich
2020_MVVNL_430238_1
66/EDC(B)/2019-20
Open Tender
Electrical Works
Item Rate
90 days
Bahraich
Please Refer Tender Form
3 documents required · 3 mandatory
₹1,180
Superintending Engineer, EDC
₹5,700
3 Jun 2020
1 Feb 2020
7 Feb 2020
1 Feb 2020
6 Feb 2020
1 Feb 2020
Amount
Loading, Unloading and safe cartage of the following materials from Electricity Store Centre, Bahraich to the work site/dump site. All the material at Sl No. 1 shall be given by department and rest all the material including civil material will be arranged by the contractor itself. Any other material if required for completion of work which might not have been mentioned in bid document, shall be arranged by the contractor.
Carriage of ST Pole 11 Mtr. Long
Carriage of 11 KV XLPE cable 3x185mm sq.
Carriage of other line material
Carriage of Cable jointing kit
Carriage of LT PVC Cable 1x240mm sq.
Carriage of 11 KV Straight Through
Erection of Double ST Pole (11 Mtr Long) for 11 KV/HT line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site.
Erection of Stay Sets alongwith complete fittings. Cement, Sand & Brick ballast provided by the contractor at his own cost.
Earthing of ST Pole as per RESSPO Norms.
Pipe Earthing for T/F as per Respo Norms.
Grouting of ST Poles with 1:4:8 CC ratio of cement, sand & brick ballast, backfilling of pits with mud completely. All required materials shall be provided by the contractor at his own cost.
Dismantling of 100 KVA & 250 KVA T/F
Mounting & Installation of 100 KVA & 250 KVA T/F
Fixing of 11 KV Straight Through
Fixing of Cable jointing kit
Fixing of LT Cable
Laying & Commissioning of 11 KV XLPE Cable 3x185mm2 and its hoisting with C.I. Pipe by HDD method (Double Curcuit) (C.I. Pipe Provided by the Contractor).
Fitting of Three Phase Distribution Box
Laying of LT PVC Cable 1x240 sqmm
Construction of masonary Plinth & Fencing Suitable for 100 KVA & 250 KVA T/F as per Respo Norms.
M/s S S Associates
M/S J AND V INFRATECH PRIVATE LIMITED
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .