Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.9 LAccepted-AOC | ₹5.9 L | 1 | Accepted-AOC AOC |
| 2 | 2₹5.9 LRejected-Finance | ₹5.9 L | 2 | Rejected-Finance SECOND LOWEST |
Tender Value
₹5.9 L
EMD Value
₹12,000
Closing Date
7 May 2026, 12:00 pmClosed
EE RED DIV Ballia
EE RED DIV Ballia
lot29 vikash khand bansdih ke gram sabha chotki seriya me sampark marg par amar sahid praveen singh ismriti dawar ka nirman kary
2026_REDUP_1144459_1
69/EE/RED/2025-26/08-04-2026
Open Tender
Civil Works
90 days
ballia
Please refer Tender documents.
3 documents required · 3 mandatory
₹856
₹12,000
Yes
12 Jun 2026
2 May 2026
8 May 2026
2 May 2026
7 May 2026
2 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. DSR 2.6.1 (2023) | 1 | cum. | 0.2 | ₹0.2 |
| 2 | 1:4:8 (1 Cement : 4 coarse sand (zone-Ill) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) DSR 4.1.8 (2023) | - | cum. | 0.6 | - |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-lll) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) DSR 5.1.3 (2023) | - | cum. | 0.4 | - |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers DSR 5.9.5 | - | sqm | 0.2 | - |
| 5 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) DSR 6.1.1 (2023) | 1 | cum. | 5,098.46 | ₹5,093.36 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-Ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). DSR 5.3 (2023) | - | cum. | - | - |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform DSR 5.9.3 | - | sqm | 0.2 | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform DSR 5.9.3 | 1 | sqm | 0.8 | ₹0.8 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars DSR 5.1.3 (2023) DSR 5.22.1 (2023) | - | Kg. | 0.4 | - |
| 10 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:4 (1 cement : 4 coarse sand) DSR 6.4.1 (2023) | 1 | cum. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
BOQ_2138380.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid