Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical B 1 E 27 MOHAN COOPERATIVE INDUSTRIAL ESTATE MATHURA ROAD NEW DELHI 110044 INDIA SOUTH DELHI DELHI 110044 | SOUTH EAST DELHI | DELHI | 110044 | Accepted-Technical Elgible |
| 2 | Rejected-Technical F F PLOT NO 29 SECTOR 11 DWARKA NEW DELHI 110078 | NEW DELHI | NEW DELHI | DELHI | 110078 | Rejected-Technical Not Eligible, Plz. see Technical Bid Evaluation Report |
| 3 | Rejected-Technical UNIT NO 10 BANKING COMPLEX NO II SEC 19A PLOT NO 9 AND 10 VASHI NAVI MUMBAI 400705 | NAVI MUMBAI | THANE | MAHARASHTRA | 400705 | Rejected-Technical Not Eligible, Plz. see Technical Bid Evaluation Report |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
10 Dec 2025, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Sr. Superintending Engineer
Office of the Superintending Engineer, P.W.D., Western Circle No.-I, Court Compound, Bardhaman, Purba Bardhaman
Consultancy services for Authoritys Engineer for Supervision of Construction of Shilpa Setu over river Damodar at 2_950 Km. and Construction of Bridge over Eden Canal at 2_415 Km of Burdwan Arambagh Road through Engineering, Procurement
2025_PWD_937697_1
WBPWD/SE/WC-I/RFP-01/25-26
Open Tender
Consultancy
Item Rate
913 days
Burdwan
Please refer Tender documents.
7 documents required · 7 mandatory
₹2 L
Yes
Burdwan
30 Jan 2026
3 Nov 2025
12 Dec 2025
4 Nov 2025
10 Dec 2025
28 Nov 2025
18 Nov 2025
REMUNERATION FOR LOCAL PROFESSIONAL STAFF
A: Key Personnel Team Leader cum Senior Bridge Engineer, Full Time (Maximum age limit 65 years on Bid due date) For Construction Period = 30.00 month
A: Key Personnel Resident Engineer cum Bridge / Structural Engineer Full Time (Maximum age limit 65 years on Bid due date) For Construction Period = 30.00 month For DLP or Mtc. Period (intermittent) =60.00 month Total =90.00 month
A: Key Personnel Senior Bridge Design Engineer (Maximum age limit 65 years on Bid due date) For Construction Period =06.00 month
A: Key Personnel Sr. Contract Specialist (Maximum age limit 65 years on Bid due date) For Construction Period = 6.00 month
A: Key Personnel Senior Quality cum Material Expert Full Time (Maximum age limit 65 years on Bid due date) For Construction Period= 30.00 month
A: Key Personnel Road Safety Expert, (Maximum age limit 65 years on Bid due date) For Construction Period=04.00 month
Office Furniture(Rental/Hire) Executive Chairs (Godrej make, model No.PCH-701or equivalent) (1 for each Key Personnel) For Construction Period=7X30=210.00 month For DLP or Mtc.Period =1 X60=60.00 month Total = 270.00 month
B: Sub Professional Staff Assistant Highway Engineer For Construction Period = 06.00 month
B: Sub Professional Staff Survey Engineer (1 No.) Full Time For Construction Period=1X30.00=30.00 month For DLP or Mtc. Period =00.00 month Total = 30.00 month
B: Sub Professional Staff Assistant Bridge / Structural Engineer (2 Nos.) Full Time For Construction Period=2X30.00=60.00 month For DLP or Mtc.Period =60.00 month Total =120.00 month
B: Sub Professional Staff Assistant Quality cum Material Engineer (1 Nos.) Full Time For Construction Period=1X30.00=30.00 month For DLP or Mtc.Period = 0.00 month Total =30.00 month
B: Sub Professional Staff Quantity Surveyor (1 No.) Full Time For Construction Period=1X30.00=30.00 month For DLP or Mtc.Period =1X12.00=12.00 month Total = 42.00 month
B: Sub Professional Staff CAD Expert Full Time (1 no) For Construction Period =30.00 month For DLP or Mtc. Period =0.00 month Total = 30.00 month
Support Staff
Support Staff Office Manager(1no) For Construction Period =30.00 month For DLP or Mtc. Period =0.00 month Total = 30.00 month
Support Staff Accountant cum cashier (1no) For Construction Period =30.00 month For DLP or Mtc. Period =60.00 month Total = 90.00 month
Support Staff Steno cum Computer Operator (2nos) For Construction Period (30X2)=60.00 month
Support Staff Office Boy (2nos) For Construction Period=2noX30=60.00 month For DLP or Mtc.Period 1 no X 60=60.00 month Total = 120.00 month
Transportation (Fixed rate on rental basis) The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx.3000km/month run
4 wheeler Air conditioned with acceptable emission standard (not more than 3 years old) (3 nos for Agency) For Construction Period=3nosX30=90.00 month For DLP or Mtc. Period =1noX60 =60.00 month Total = 150.00 month
Office Rent (Fixed Costs)– Minimum 100 sqm. area of office shall be rented. (for Single project) The rent cost includes electricity and water charges, maintenance, Cleaning, repairs, etc. complete. For Construction Period =0.00 month For DLP or Mtc. Period =60.00 month Total = 60.00 month
Office Supplies, Utilities and Communication (Fixed Costs) (for Single project)
Office Supplies For Construction Period =30.00 month For DLP or Mtc.Period =60.00 month Total = 90.00 month
Drafting Supplies For Construction Period =30.00 month For DLP or Mtc.Period =60.00 month Total = 90.00 month
Computer Running Costs For Construction Period =30.00 month For DLP or Mtc.Period =60.00 month Total = 90.00 month
Domestic Communication For Construction Period =30.00 month For DLP or Mtc.Period =60.00 month Total = 90.00 month
Office Furniture and Equipment (Rental) [Fixed monthly cost] (for Single project) (Brand new Furniture and Equipment shall be mandatory at the time of commencement of services as per the list given below. The rental rate per month shall be quoted for the total list of Office Furniture and Equipment)
Office Furniture (Rental/Hire) Executive Table (Godrej make, model No.T-108 or equivalent) (1 for each Key Personnel) For Construction Period=7X30=210.00 month For DLP or Mtc.Period =1 X60=60.00 month Total = 270.00 month
Contingencies A fixed amount of Indian Rupees TEN Lakh (Rs.10,00,000.00) shall be included in the Financial Proposal. The provisions of Contingency shall be operated with the specific approval from the Authority.
Office Furniture(Rental/Hire) Tables (Godrej make, model No.T-104 Or equivalent) For Construction Period=7X30=210.00 month For DLP or Mtc.Period =1 X60=60.00 month For DLP or Mtc.Period =1 X12=12.00 month Total = 282.00 month
Office Furniture(Rental/Hire) Ordinary ChairsType-1(Godrej make, Model NoT-CHR–6 or equivalent) For Construction Period=7X30=210.00 month For DLP or Mtc.Period =1 X60=60.00 month For DLP or Mtc.Period =1 X12=12.00 month Total = 282.00 month
Office Furniture(Rental/Hire) Tables (for all other staff)(Godrej make, model No.T-101or equivalent) For Construction Period=6 X30=180.00 month For DLP or Mtc. Period =00.00 month Total = 180.00 month
Office Furniture(Rental/Hire) Ordinary Chairs–Type II (for all other staff) (Godrej make, model No.CHR-6 or equivalent) For Construction Period=6 X30=180.00 month For DLP or Mtc. Period =00.00 month Total = 180.00 month
Office Furniture(Rental/Hire) Steel Almirah 1270mm x765mm x440mm (Godrej make, model minor plain or equivalent) For Construction Period=5 X30=150.00 month For DLP or Mtc. Period =1X60=60.00 month Total = 210.00 month
Office Furniture(Rental/Hire) Visitors chairs/Conference room chairs (Godrej make, model No.DCH7004or equivalent) For Construction Period=7 X30=210.00 month For DLP or Mtc. Period =2 X60=120.00 month Total = 330.00 month
Office Furniture(Rental/Hire) Tables for computers with 3 drawers, keyboard /mouse pull out trays size 1664mmx900(Godrej make Or equivalent as per Engineer’s design) For Construction Period=3 X30=90.00 month For DLP or Mtc. Period =1 X60=60.00 month Total = 150.00 month
Office Furniture(Rental/Hire) Printer desks (Godrej make or equivalent) For Construction Period=2X30=60.00 month For DLP or Mtc. Period =1 X60=60.00 month Total = 12
Office Furniture(Rental/Hire) Side tables (Godrej make or equivalent) For Construction Period=1 X30=30.00 month For DLP or Mtc. Period =0.00 month Total = 30.00 month
Office Furniture(Rental/Hire) Conference Table (Godrej make, model No.T-12 or equivalent) For Construction Period=1 X30=30.00 month For DLP or Mtc. Period =0.00 month Total = 30.00 month
0.00 month
Office Equipment(Rental/Hire) Telephone with PABX facilities (1 External lines) For Construction Period=1 X30 =30.00 month For DLP or Mtc. Period =0.00 month Total = 30.00 month
Office Equipment(Rental/Hire) Photocopier For Construction Period=1 X30=30.00 month For DLP or Mtc. Period =0.00 month Total = 30.00 month
Office Furniture(Rental/Hire) Revolving Chairs for Computer Room/Drawing room For Construction Period=3 X30=90.00 month For DLP or Mtc. Period =1 X60=60.00 month Total = 150.00 month
Office Equipment(Rental/Hire) Air-Conditioner(1.5Ton) For Construction Period=4 X30=120.00 month For DLP or Mtc. Period =1 X60=60.00 month Total = 180.00 month
Office Equipment(Rental/Hire) LaserJet Printers For Construction Period=2 X30=60.00 month For DLP or Mtc. Period =0.00 month Total = 60.00 month
Office Equipment(Rental/Hire) Engineering Plan Printers For Construction Period=1 X30=30.00 month For DLP or Mtc. Period =0.00 month Total = 30.00 month
Office Equipment(Rental/Hire) Diesel Generator (20KVA)with running cost For Construction Period=1 X30=30.00 month For DLP or Mtc. Period =0.00 month Total = 30.00 month
Office Equipment(Rental/Hire) Binding Machine For Construction Period=1 X30=30.00 month For DLP or Mtc. Period =0.00 month Total = 30.00 month
Office Equipment(Rental/Hire) Software (LS) For Construction Period=30.00 month For DLP or Mtc. Period =0.00 month Total = 30.00 month
Reports and Document Printing (for Single project)
Monthly reports For Construction Period No.of Reports=30, No.of Copies per Report =6 For DLP or Mtc. Period =0 Copy Total=30X6=180 Copies
Quarterly Reports For Construction Period No.of Reports=10, No.of Copies per Report =6 For DLP or Mtc. Period No.of Reports=1, No.of Copies per Report =6 Total=(10+1)X6=66 Copies
Various others reports as Provided in the EPC Agreement such as Completion Report For Construction Period No.of Reports=30, No.of Copies per Report =6 For DLP or Mtc. Period =0 Copy Total=30X6=180 Copies
Road survey (The cost shall include carrying out survey using equipment, manpower, software and report processing.)
Surface defects detection and roughness measurement using Network Survey Vehicle. Length = 2.00 Km., No of times survey to be conducted =11 Total = 2.00 Km.X11 Nos. = 22.000 Km.
Pavement strength measurement using FWD. Length = 2.00 Km., No of times survey to be conducted =11 Total = 2.00 Km.X11 Nos. = 22.00 Km.
Bridge inspection using Mobile Bridge Inspection Unit. Length =0.80 Km., No of times survey to be conducted =11 Total = 0.80 Km.X11 Nos. = 8.80 Km.
Road signs inspection using Retro Reflectometer Length = 2.00 Km., No of times survey to be conducted =11 Total = 2.00 Km.X11 Nos. = 22 Km.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
cancelled_1.pdf
pdf • 0.11 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.76 MB
Tendernotice_2.pdf
PDF • 3.93 MB
Tendernotice_3.pdf
PDF • 3.08 MB
BOQ_2211604.xls
BOQ • 0.31 MB
2911.pdf
Tender Documents • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .