Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹1,700
Closing Date
23 Jun 2022, 6:55 pmClosed
Executive Engineer Mech. Irrig. Div. Baramulla
Mech. Irrig. Div. Baramulla
Electrical work to be carried out at various lift irrigation Schemes (Janbazpora-I, Sheeri-I and II and Nadhial old).
2022_IFC_173828_4
eNIT 22 of 2022-23
Open Tender
Repair and Maintenance Works
Item Rate
7 days
Baramulla
Please refer Tender documents.
6 documents required · 6 mandatory
₹50
Yes
Executive Engineer Mech. Irrig. Div. Baramulla
₹1,700
Yes
25 Jun 2022
13 Jun 2022
24 Jun 2022
13 Jun 2022
23 Jun 2022
13 Jun 2022
Amount
Complete servicing /maintenance of 300HP ATS Starter by way of removing of accumulated carbon from contact points of all contactor by applying carbon tetra chloride active chemical to make the surface clean. Adjustment of all protection devices , removing of dirt , dust and other greasy substance with the help of highly volatile thinner/acetone and blowing of compressed air inside the starter compartment. The job includes the charge for p/f LED phase indicator with surge protection of reputed make (3no). The job also includes the charge for replacement of push button (ON/OFF) with new one for the completion of work. The job also includes the charge for replacement of damaged brass bolts with nuts as per sample of incoming and outgoing connections. in ATS with new one & filling of T- oil 10 Ltr for topping for the completion of work. at LIS Janbazpora-I.
Repairs to 5HP 3 phase priming pumping unit by way loading in private load carrier and shifting it to workshop for repair. The job includes the charge for complete rewinding of stator coils as per sample of copper wire of standard size and quality (4.5 kg ). The job includes the charge for providing and fitting of insulation material in the slots of stator including bamboo straps, latheride paper etc and varnishing of winding with good quality varnish. The job also includes p/f of Bakelite connections plate as per sample with proper thimbling of terminals. The job also includes the charge for making sleeve, balancing of shaft on lathe machine, p/f of new nuts & bolts & greasing of bearings, packing etc for the completion of work. Then reassembling the pumping unit at workshop and shifting to site and tested on full load. Deduct the cost of old scrap (3.6kg). at LIS Sheeri-II.
a) Mechanical transportation, loading, unloading and handling of 100 HP OISD starter of LIS Nadhial old using appropriate means of transport as auto rickshaw car or similar with 1km lead (02 Trip) b) Extra per kilometer for lead >1.0 kms up to 5.0 kms (5 km/Trip) c) Dismantling of 100 HP OISD Starter by way of disconnecting of all connection leads with the help of skilled labour and other tools & tackles d) Complete rewinding of ATS coils having total weight 13.5kg e) Deduct the cost of scrap 10.8kg f) .Providing, fitting of insulation material such as cardboard, latheride paper, cotton tape, PVC paper, varnishing, nuts and bolts etc.Replacement of damaged brass bolts with nuts as per sample of incoming and outgoing connections. Reassembling of auto coil at workshop by way of fitment of coils, core piece and after proper cleaning, clamping channels, nuts, bolts, soldering of connections and testing it at workshop g) Providing and fitting of movable & fixed copper contact points ( 4 no each ) h) Repairs to the handle mechanism by way of providing and fitting of damaged tension springs, nuts and allied accessories. i) Providing & filling of T- oil (3 Ltr ) j) Complete assembling of 100HP OISD Starter by connecting all leads & tested on full load . at LIS Nadhial Old.
a) Mechanical transportation, loading, unloading and handling of 300HP ATS coil using appropriate means of transport as auto rickshaw car or similar with 1km lead (02 Trip) b) Extra per kilometer for lead >1.0 kms up to 5.0 kms (5 km/Trip) c) Dismantling of ATS coil by way of disconnecting of all connection leads with the help of skilled labour and other tools & tackles d) Complete rewinding of ATS coils having total weight 40.5kg e) Deduct the cost of scrap 32.4kg f) .Providing, fitting of insulation material such as cardboard, latheride paper, cotton tape, PVC paper, varnishing, nuts and bolts etc.Replacement of damaged brass bolts with nuts as per sample of incoming and outgoing connections. Reassembling of auto coil at workshop by way of fitment of coils, core piece and after proper cleaning, clamping channels, nuts, bolts, soldering of connections and testing it at workshop Complete assembling of ATS coil of Starter by connecting all leads & tested on full load . at LIS Sheeri-I
Providing and fitting of 90 Sq mm copper thimbles with proper insulation. at LIS Nadhial Old.
M/S EURO LIGHT ENTERPRISES
M/S STAR ELECTRICAL ENGINEERING WORKS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .