| 1 | L1₹5.0 CrAccepted-AOC MADAN MOHAN APARTMENT JAIL ROAD H NO 28 SILCHAR CACHAR ASSAM 788004 | CACHAR | ASSAM | 788004 | ₹5.0 Cr | L1 | Accepted-AOC Accepted as a first lowest bidder and AOC issued to M/S Fountain Head |
| 2 | L2₹5.2 CrRejected-Finance ARALIA AGARTALA PIN 799004 | WEST TRIPURA | TRIPURA | 799004 | ₹5.2 Cr | L2 | Rejected-Finance Rejected |
| 3 | L3₹5.3 CrRejected-Finance NULL | ₹5.3 Cr | L3 | Rejected-Finance Rejected |
| 4 | L4₹5.4 CrRejected-Finance DHARMANAGAR TRIPURA N 799270 | NORTH TRIPURA | TRIPURA | 799270 | ₹5.4 Cr | L4 | Rejected-Finance Rejected |
| 5 | L5₹5.5 CrRejected-Finance 58 C MANTRI BARI ROAD WARD NO 32 AGARTALA AMC AGARTALA WEST TRIPURA | ₹5.5 Cr | L5 | Rejected-Finance Rejected |
Tender Value
₹6.1 Cr
EMD Value
₹12.2 L
Closing Date
20 Feb 2026, 3:00 pmClosed
Executive Engineer
O/o Executive Engineer Kanchanpur Division, PWD
Improvement of road from Choreibung to Kanajuri, Handurai para to Khagendra Para n Padmaluchan (TD road to Handurai Para PMGSY road junction to Padmalochan Para) under Damcherra Block. (Under RIDF-XXXI of NABARD)
2026_CEPWD_70063_1
55/CE/PWD(RnB)/ACE (PnDU)/2025-26
Open Tender
Civil Works - Roads
270 days
Damcherra
Please refer to Bid documents
5 documents required · 5 mandatory
₹10,000
₹12.2 L
29 Jun 2026
7 Feb 2026
20 Feb 2026
7 Feb 2026
20 Feb 2026
11 Feb 2026
7 Feb 2026 - 19 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SH: Site Clearance | |||||
| 1.01 | Clearing Grass and Removal of Rubbish
Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per MoRD Technical Specification Clause 201.
By Manual Means | - | Hectare | 22,910.9 | - |
| 1.02 | Dismantling of Structures
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding whenever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and upto a lead of 1000 m as per MoRD Technical Specification Clause 202.
I.By Manual Means
B) Cement Concrete | 1 | Cum | 653.4 | ₹652.75 |
| 1.03 | Dismantling of Structures
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding whenever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and upto a lead of 1000 m as per MoRD Technical Specification Clause 202.
I.By Manual Means
C) Reinforced Cement Concrete | - | Cum | 1,824 | - |
| 1.04 | Dismantling Brick/Tile Work as per MoRD Technical Specification No. 202.
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry including disposal of unserviceable material and stacking the serviceable material with all lift and upto a lead of 1000 m as per MoRD Technical Specification Clause 202.
B) Cement mortar | - | Cum | 424.3 | - |
| 1.05 | Removing all types of Hume pipes.
Removing all types of Hume pipes and stacking within a lead of 1000 m excluding Earthwork and Dismantling of Masonry Works as per MoRD Technical Specification Clause 202 .
B) Above 600 mm to 900 mm dia Hume pipe | - | Meter | 402 | - |
| 2SH: Earthwork | |||||
| 2.01 | Compacting Original Ground
(i) Compacting original ground supporting embankment
Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment,scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per MoRD Technical Specification Clause 301.4.1. | - | Cum | 23 | - |
| 2.02 | Compacting Original Ground
(ii) Compacting original ground supporting subgrade
Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per MoRD Technical Specification Clause 303.5.2. | 1 | Cum | 30.4 | ₹30.37 |
| 2.03 | (iii) Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections and transporting to the embankment location with all lifts and lead upto 1000 m as per MoRD Technical Specification Clause 302.3. | - | Cum | 44.1 | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.80 MB
DNITmerged.pdf
Tender Documents • 2.95 MB
BOQ_71302.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid