Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.7 LAccepted-AOC | ₹4.7 L | 1 | Accepted-AOC AOC |
| 2 | 2₹5.0 L+₹29,635.21 (6.33%)Rejected-Finance | ₹5.0 L+₹29,635.21 (6.33%) | 2 | Rejected-Finance 2 |
| 3 | 3₹5.0 L+₹31,274.13 (6.68%)Rejected-Finance | ₹5.0 L+₹31,274.13 (6.68%) | 3 | Rejected-Finance 3 |
| 4 | 4₹5.2 L+₹47,200.39 (10.1%)Rejected-Finance | ₹5.2 L+₹47,200.39 (10.1%) | 4 | Rejected-Finance 4 |
| 5 | 5₹5.2 L+₹55,883.21 (11.9%)Rejected-Finance | ₹5.2 L+₹55,883.21 (11.9%) | 5 | Rejected-Finance 5 |
| Sl No | Description | Qty | Unit | JIJIL KUMAR R L3 | HARISH S L7 | S. RAJENDRAN L6 | REJITH R C L2 | BIJOY J B L4 | B RAJAN L5 | Anandhu Asok A L1 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00maintenanace | ||||||||||
| 1.00 | 11.1.1.1:Excavation for Structures <br> Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> I. Ordinary soil <br> (i) Upto 3 m depth | 47.14 | cum | 567 ₹26,727.81 | 673.93 ₹31,768.39 | 962.76 ₹45,383.54 | 566.1 ₹26,685.39 | 587 ₹27,670.59 | 595.94 ₹28,092.02 | 532.4 ₹25,096.8 Lowest |
| 1.00 | 75.7.1:DRY RUBBLE MASONRY with hard stone, including Through/Bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications. | 105.03 | cum | 4,130 ₹4,33,769.77 | 4,899.96 ₹5,14,637.9 | 3,989.96 ₹4,19,061.51 | 4,115.96 ₹4,32,295.16 | 4,260 ₹4,47,423.54 | 4,332.96 ₹4,55,086.46 | 3,870.96 ₹4,06,563.06 Lowest |
| 1.00 | 75.8.1.1:Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. Max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 4.13 | cum | 5,760 ₹23,817.6 | 6,836.57 ₹28,269.22 | 9,766.53 ₹40,384.6 | 5,742.71 ₹23,746.11 | 5,957 ₹24,632.2 | 6,045.48 ₹24,998.06 | 5,400.89 ₹22,332.68 Lowest |
| 1.00 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | 0.23 | tonne | 60,570 ₹13,688.82 | 71,868.48 ₹16,242.28 | 1,02,669.25 ₹23,203.25 | 60,369.51 ₹13,643.51 | 62,628 ₹14,153.93 | 63,552.26 ₹14,362.81 | 56,776.09 ₹12,831.4 Lowest |
| 1.00 | OD507784/2025-2026:Supplying and Fixing Information Board 75x60 cm size using GI pipes as post and
1mm MS sheet surrounded by MS angles including painting, lettering and fixing etc. complete. | 1 | each | 1,500 ₹1,500 | 1,779.67 ₹1,779.67 | 2,542.38 ₹2,542.38 | 1,494.91 ₹1,494.91 | 1,550 ₹1,550 | 1,573.73 ₹1,573.73 | 1,405.93 ₹1,405.93 Lowest |
Tender Value
₹8.5 L
EMD Value
₹21,168
Closing Date
18 Mar 2026, 5:00 pmClosed
AE LIDEW
AE LIDEW
side wall
2026_LSGD_846181_2
AE/LSGD/KTL/25-26
Open Tender
Civil Works - Others
Item Rate
189 days
Kottukal
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,870
Yes
₹21,168
Yes
27 Jul 2026
11 Mar 2026
20 Mar 2026
11 Mar 2026
18 Mar 2026
11 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1maintenanace | |||||
| 1.001 | 11.1.1.1:Excavation for Structures <br> Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> I. Ordinary soil <br> (i) Upto 3 m depth | - | cum | - | - |
| 1.002 | 75.7.1:DRY RUBBLE MASONRY with hard stone, including Through/Bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications. | 0.6 | cum | - | - |
| 1.003 | 75.8.1.1:Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. Max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 1 | cum | - | - |
| 1.004 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | - | tonne | - | - |
| 1.005 | OD507784/2025-2026:Supplying and Fixing Information Board 75x60 cm size using GI pipes as post and
1mm MS sheet surrounded by MS angles including painting, lettering and fixing etc. complete. | - | each | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1429840.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
BOQ_1429840.xls
BOQ • 0.30 MB
sbdkarathode.pdf
Tender Documents • 1.65 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .