Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹86,407Accepted-AOC HIMACHAL PRADESH HP | ₹86,407 | L1 | Accepted-AOC quoted rates at lower sides. |
| 2 | L2₹92,456+₹6,049 (7.00%)Rejected-Finance HIMACHAL PRADESH HP | ₹92,456+₹6,049 (7.00%) | L2 | Rejected-Finance QUOTED RATES AT HIGHER SIDES. |
| 3 | L3₹95,048+₹8,641 (10.0%)Rejected-Finance VILLAGE POST OFFICE KAMROO TEHSIL SANGLA DISTT KINNAUR H P | KAMROO | KINNAUR | HIMACHAL PRADESH | ₹95,048+₹8,641 (10.0%) | L3 | Rejected-Finance QUOTED RATES AT HIGHER SIDES. |
Tender Value
₹87,000
EMD Value
₹2,175
Closing Date
8 Apr 2026, 3:30 pmClosed
SR.XEN
ED RECKONG PEO
Tender for augmentation of 1phase LT line into 3phase LT line from existing 22/0.4KV, 25KVA S/Stn. At Lansaring in Electrical Section Kalpa, under Electrical Sub Division, HPSEBL, Reckong Peo.
2026_HPSEB_133055_1
RPO/ED/DB-11/2025-26/127
Open Tender
Supply and Erection
Percentage
30 days
kalpa
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹2,175
29 Apr 2026
1 Apr 2026
9 Apr 2026
1 Apr 2026
8 Apr 2026
1 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | ERRECTION OF L.T LINE ON 8/9Mtr. Long S.T pole. | - | - | - | - |
| 2 | (i) Digging of pit, Laying of RCC muff,Drilling of holes in poles. Erection of pole,Erection of shackle insulator, filing of pit and ramming, Painting of pole. (Complete in all respect). | - | Each | - | - |
| 3 | ERRECTION OF STAY SET | - | - | - | - |
| 4 | Digging of pit, fixing of stay rod, filling of pit, Nozzeling & Tighting.) Complete in all respect. | - | P/Set | - | - |
| 5 | SAGGING OF ACSR CONDUCTOR 6/1/2.59mm (Single wire). | - | - | - | - |
| 6 | Laying of conductor, stringing & sagging, Binding with insulator (only). | 1 | P/Km | - | - |
| 7 | Manual Carriage of material considering average distance from road to site of work 1.500 KM | - | - | - | - |
| 8 | Steel tubular pole 8/9 mtr. long. | - | P/Pole/Km | - | - |
| 9 | Other line material. | - | P/Kg/Km | - | - |
| 10 | MATERIAL TO BE SUPPLIED BY CONTRACTOR (Subject to the non-availability of material at Divisional Store). | - | - | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.82 MB
BOQ_196777.xls
BOQ • 0.28 MB
cmd127.pdf
PDF • 0.64 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .