Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹6.1 L
Closing Date
10 Jun 2026, 11:00 am4d left
Superintending Engineer, Drainage Circle, Ballia
Superintending Engineer, Drainage Circle, Ballia
the construction of 3 RCC bridges in place of the damaged bridges located on the Doharighat Main Canal in Ballia District.
2026_UPIDC_1157080_10
04/SE/2026-27
Open Tender
Civil Works
270 days
Balllia
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,394
₹6.1 L
Yes
Superintending Engineer, Drainage Circle, Ballia
5 Jun 2026
5 Jun 2026
10 Jun 2026
5 Jun 2026
10 Jun 2026
5 Jun 2026
5 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Dismantling of old V.R.B. and proper disposal including all cost of materials,T&P and labours for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications. | 259.58 | Cum | - | - | 1 |
| 2 | Dismantling of old & damage Reinforced cement concrete slab and its proper disposal including all cost of materials, T&P and labours for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications. | 90.08 | Cum | - | - | 2 |
| 3 | Earth work in excavation of foundation including digging and refilling the trenches with all lead & lift including cost of labour, T&P for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications. | 2,845.8 | Cum | - | - | 3 |
| 4 | Laying C.C. 1:2:4 M15 in foundation with cement, sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (20 mm to 40 mm.) including all cost of materials,T&P and labours and other accessories required for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications. | 105.96 | Cum | - | - | 4 |
| 5 | Laying R.C.C. work in 1:1:2 (M25) sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (10mm to 20mm.) for raft,pedestal,abutment,slab, pier cap,wing wall & parapet including all cost of materials,T&P and labours and other accessories required for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications. | 1,116.09 | Cum | - | - | 5 |
| 6 | Providing and laying Steel as Reinforcement (TATA,SAIL&JINDAL) including cost of steel carriage, bending, cutting, placing in position and binding with steel binding wire etc. including cost of all materials, labour and T&P with all leads and lift for proper completion of work | 94.74 | MT. | - | - | 6 |
| 7 | Centering and shuttering for Plain Cement Concrete work in foundation including cost of all materials, labour and T&P etc with all leads and lift/down for proper completion of work and as directed by Engineer-in-Charge as per I.D. specifications. | 51.57 | Sqm | - | - | 7 |
| 8 | Centering and shuttering for R.C.C. work including cost of all materials, labour and T&P etc with all leads and lift/down for proper completion of work and as directed by Engineer-in-Charge as per I.D. specifications. | 1,946.19 | Sqm | - | - | 8 |
| 9 | Supply and laying of joint filler board on abutment and wing wall and on slab joint including cost of all material labour T&P required for proper completion of work as directed by Engineer-in-charge and as per I.D. specifications. | 69.34 | Sqm | - | - | 9 |
| 10 | Supply & Laying one layer of tarfelt / Membrane sheet below for slab including cost of all material labour and T & P etc. with proper completion of work as directed by Engineer-in-charge and as per I.D. specifications. | 369.54 | Sqm | - | - | 10 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.85 MB
BID10.pdf
Tender Documents • 1.53 MB
BOQ_2168374.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid