Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | H1₹42.9 LAdmitted-Finance | -16.20% | ₹42.9 L | H1 | Admitted-Finance |
| 2 | H2₹37.4 LAdmitted-Finance | -26.81% | ₹37.4 L | H2 | Admitted-Finance |
| 3 | H3₹34.7 LAdmitted-Finance | -32.12% | ₹34.7 L | H3 | Admitted-Finance |
| 4 | H4₹34.0 LAdmitted-Finance | -33.49% | ₹34.0 L | H4 | Admitted-Finance |
Tender Value
₹51.1 L
EMD Value
₹1.0 L
Closing Date
10 Mar 2026, 4:00 pmClosed
Executive Engineer
PWD RnB Division Rajouri
Construction of road from Chawa to Barwan School via Irwan Wali
2026_PWDJK_304830_1
NIT NO 91 OF 2025-26 Dated 26-02-2026
Open Tender
Civil Works
Rajouri
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,500
Executive Engineer
₹1.0 L
14 Mar 2026
28 Feb 2026
11 Mar 2026
28 Feb 2026
10 Mar 2026
28 Feb 2026
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as:ALL KIND OF SOIL
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. 1:3:6 with 20% plum
Providing and fixing crate work including cost of crate stones and carriage complete job (nsi)
HAND PACKED STONE FILLING
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc.complete 1000 mm dia. R.C.C. pipe (laying by manual/mechanical means)
Carriage of material from source to site of work by mechanical transport including loading /unloading and stacking complete.
SAND FOR AN AVERAGE DISTANCE OF 140 KM
STONE AGGREGATE FOR AN AVERAGE DISTANCE OF 40KM
STONE FOR AN AVERAGE DISTANCE OF 5KM
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_990189.xls
BOQ • 0.39 MB
Ext91.pdf
PDF • 0.52 MB
Download all tender documents and submit your bid