| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.6 LAccepted-Finance | ₹4.6 L | L-1 | Accepted-Finance Found Lowest one |
| 2 | L-2₹5.0 L+₹41,975.60 (9.16%)Rejected-Finance HIMACHAL PRADESH HP | ₹5.0 L+₹41,975.60 (9.16%) | L-2 | Rejected-Finance High rate qouted |
| Sl No | Description | Qty | Unit | KULBINDER SINGH GOVT CONTRACTOR L1 | GOVT CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Excavation in foundation trenches etc. in earth work in all kinds of soil such as pick work,jumper work,blasting in soft and hard rock and chiselling work including saturated soil slushy soil and under floor upto all depth and stacking the excavated soil not more than 3 metre clear from the edge of excavation and then returning the stacked soil in 15 centimetre (Fifteen centimetre) layer when required into plinth sides of foundation etc.consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed by the Engineer-in-charge. | 65.59 | Cubic metre | 400 ₹26,236 Lowest | 600 ₹39,354 |
| 2.00 | Providing and laying cement concrete 1:4:8 (One cement is to four sand is to eight graded stone aggregate 40 milimetre nominal size) and curing complete excluding the cost of form work in foundation and plinth within all leads and lifts as per the direction of Engineer-in-charge. | 3.19 | Cubic metre | 6,500 ₹20,735 Lowest | 6,800 ₹21,692 |
| 3.00Providing form work with steel plates 3.15 milimetre thick welded with angle iron in frame 30x30x5 milimetre so as to give a fair finish including centring,shuttering,strutting and propping etc.with wooden battens ballies,height of propping and centring below supporting floor two ceiling not exceeding 4 metre and removal of the same for in-situ-reinforced concrete and plain concrete work in:- | |||||
| 4.00 | a) Edges of slab and breaks in floor and walls under 20 centimetre in wide within all leads and lifts as per the direction Engineer-in-charge. | 16.34 | Running metre | 220 ₹3,594.8 Lowest | 280 ₹4,575.2 |
| 5.00 | b) Vertical surfaces such as walls(any thickness)partitions walls and the like including attached pillasters,buttreses plinth string courses and the like within all leads and lifts as per the direction of Engineer-in-charge. | 95.38 | Square metre | 320 ₹30,521.6 Lowest | 360 ₹34,336.8 |
| 6.00 | c) Beams, cantilever, girder and linter sides and soffits of beams haunchings cantilevers girder, bressumers and lintel not exceeding one meter in depth in all heights from floor within all leads and lifts as per the direction of Engineer-in-charge. | 9.96 | Square metre | 380 ₹3,784.8 Lowest | 420 ₹4,183.2 |
| 7.00Providing form work of ordinary timber planking so as to give a rough finish including centering,shuttering,strutting and propping etc.height of propping and centering below supporting floor to ceiling not exceeding 4 metrre and removal of the same for in-situ-reinforced concrete and plain concrete work in:- | |||||
| 8.00 | a) Arches exceeding six metre span within all leads and lifts as per the direction Engineer-in-charge. | 21.99 | Square metre | 2,200 ₹48,378 Lowest | 2,500 ₹54,975 |
| 9.00Providing and laying cement concrete 1:11/2:3(One cement is to one and half sand is to three graded stone aggregate 20 milimetre nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in:- | |||||
| 10.00 | a) Foundation,footings bases of column and the like mass concrete within all leads and lifts as per the direction of Engineer-in-charge. | 1.99 | Cubic metre | 9,800 ₹19,502 Lowest | 9,900 ₹19,701 |
Tender Value
₹4.4 L
EMD Value
₹8,860
Closing Date
14 Feb 2026, 5:00 pmClosed
EXECUTIVE ENGINEER
JAL SHAKTI DIVISION PALAMPUR
Construction of reinforcement cement concrete under ground storage tank of 40000 litre capacity
2026_HPIPH_127606_1
HPIPH 11060-11110 DATED 05.02.2026
Open Tender
Civil Works
Item Rate
90 days
PALAMPUR
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
EXECUTIVE ENGINEER
₹8,860
18 Jul 2026
5 Feb 2026
16 Feb 2026
5 Feb 2026
14 Feb 2026
5 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation trenches etc. in earth work in all kinds of soil such as pick work,jumper work,blasting in soft and hard rock and chiselling work including saturated soil slushy soil and under floor upto all depth and stacking the excavated soil not more than 3 metre clear from the edge of excavation and then returning the stacked soil in 15 centimetre (Fifteen centimetre) layer when required into plinth sides of foundation etc.consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed by the Engineer-in-charge. | - | Cubic metre | - | - |
| 2 | Providing and laying cement concrete 1:4:8 (One cement is to four sand is to eight graded stone aggregate 40 milimetre nominal size) and curing complete excluding the cost of form work in foundation and plinth within all leads and lifts as per the direction of Engineer-in-charge. | 1 | Cubic metre | - | - |
| 3 | Providing form work with steel plates 3.15 milimetre thick welded with angle iron in frame 30x30x5 milimetre so as to give a fair finish including centring,shuttering,strutting and propping etc.with wooden battens ballies,height of propping and centring below supporting floor two ceiling not exceeding 4 metre and removal of the same for in-situ-reinforced concrete and plain concrete work in:- | - | - | - | - |
| 4 | a) Edges of slab and breaks in floor and walls under 20 centimetre in wide within all leads and lifts as per the direction Engineer-in-charge. | 1 | Running metre | - | - |
| 5 | b) Vertical surfaces such as walls(any thickness)partitions walls and the like including attached pillasters,buttreses plinth string courses and the like within all leads and lifts as per the direction of Engineer-in-charge. | 1 | Square metre | - | - |
| 6 | c) Beams, cantilever, girder and linter sides and soffits of beams haunchings cantilevers girder, bressumers and lintel not exceeding one meter in depth in all heights from floor within all leads and lifts as per the direction of Engineer-in-charge. | - | Square metre | - | - |
| 7 | Providing form work of ordinary timber planking so as to give a rough finish including centering,shuttering,strutting and propping etc.height of propping and centering below supporting floor to ceiling not exceeding 4 metrre and removal of the same for in-situ-reinforced concrete and plain concrete work in:- | - | - | - | - |
| 8 | a) Arches exceeding six metre span within all leads and lifts as per the direction Engineer-in-charge. | 1 | Square metre | - | - |
| 9 | Providing and laying cement concrete 1:11/2:3(One cement is to one and half sand is to three graded stone aggregate 20 milimetre nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in:- | - | - | - | - |
| 10 | a) Foundation,footings bases of column and the like mass concrete within all leads and lifts as per the direction of Engineer-in-charge. | - | Cubic metre | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.35 MB
BOQ_188469.xls
BOQ • 0.31 MB
Form6.pdf
Tender Documents • 0.28 MB
Form8.pdf
Tender Documents • 0.99 MB
Termsandconditions.pdf
Tender Documents • 0.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .