Loading…
Loading…
Tender Value
Refer Docs
Closing Date
23 Apr 2026, 3:00 pmClosed
PM,INRPO
NRB,Tarapur
Miscellaneous civil repair works for Incinerator
2026_NRB_905481_1
BARC/NRB/INRPO/TWMP78/2026/481
Limited
Civil Works
Works
90 days
NRB, Tarapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
16 Apr 2026
16 Apr 2026
24 Apr 2026
16 Apr 2026
23 Apr 2026
16 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantling old plaster / skirting carefully , raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 100 m lead | |||||
| 2Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 100 m lead For thickness of tiles above 25 mm and up to 40 mm | |||||
| 3Dismantling doors, windows and clear storey openings (steel / wood) shutter including chowkhats, architraves, holdfasts etc. complete and stacking within 100 m lead (full windows) Of area 3.00 Sq.M and below | |||||
| 4Dismantling Aluminium / Gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable surplus material and stacking of serviceable materials within 100 m lead as directed by the Engineer-in-charge | |||||
| 5Debris Beyond 2 Km but up to and including 3 km | |||||
| 6Earth work excavation by mechanical means (Hydraulic excavator) / manual means in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom etc. including shoring and dewatering (if necessary) and refilling with selected excavated earth in layers of not more than 500 mm thick, each layer well rammed and consolidated including disposing the surplus earth within a distance of 200 m all as per specifications including clearing Jungle, uprooting of vegetation, grass, etc. complete and as directed by the Engineer-in-charge. (a) From 0.00 to 1.50 m depth from average ground level | |||||
| 7Lead charges for 1st 1 KM or part thereof, by mechanical transport including loading unloading, stacking / levelling etc. | |||||
| 7.1 | Soil | - | Cu.M | - | - |
| 8Supplying, stacking and laying of 230 mm thick rubble soling stones as under floor base including packing with smaller stone and compacting, ramming including spreading and consolidation of blinding material, moorum etc. complete all as per specifications and as directed by the Engineer-in-charge | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
BOQ_951756.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .