Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
6 May 2024, 6:55 pmClosed
Executive Engineer Mech. Irrig. Div. Baramulla
Mech. Irrig. Div. Baramulla
Repairs to 33kV/0.44kvA substation at Lift Irrigation Scheme Saifkhul of MISD Sopore.
2024_IFC_248289_2
eNIT 03 of 2024-25 MISD Sopore
Open Tender
Repair and Maintenance Works
Item Rate
7 days
Sopore
Please refer Tender documents.
7 documents required · 7 mandatory
₹50
Yes
Executive Engineer Mech. Irrig. Div. Baramulla
Yes
15 May 2024
29 Apr 2024
7 May 2024
29 Apr 2024
6 May 2024
29 Apr 2024
Amount
Repairs to 33KV/0.44KVA substation by way of: Providing and fitting of 33kV 3 phase 200A polymer type link set heavy duty post type (set of 03 pieces) by skilled workers, providing and fitting of nut bolts and clamps for fitting of the same. The job includes Fabrication, providing and fitting of G.I. channels [ISMC 75 ×75×6 (02 No.) 9 feet each] for fitting of link set complete in all respects with required fittings. The job also includes providing of 18feet long link rod and HT gloves.
City Engineering Works
M/s SAJID ENGINEERING WORKS
Asif Engineering Works
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .