Ahmedabad Municipal Corporation Central Zone
Repairing Public Toilet of Swatch Bharat Mission at Ankleshwariya Chawl, Galaji Chali No.2, Galajini Chali No.3 and Chhotalal Chawl in Shahpur Ward.
276169
Central Zone E-Tender Notice No.16/2025-2026 Tender No.460
Open
Civil Works - Others
Works
Ahmedabad
3 documents required · 3 mandatory
₹900
Municipal Commissioner, Ahmedabad
₹8,499
13 Feb 2026
13 Feb 2026
13 Feb 2026
23 Feb 2026
13 Feb 2026
Name of work :- bægÍtul Ntnvwh Jtuzobtk ykfjuµhegtle atje, djtSle atje lk.2, djtSle atje
lk.3, Atuxtjtjle atjebtk MJåA Cth< rbNl yk<od< xtugjux hevuh fhJtlt ftb
Tender Invited on Behalf of AMC, Central Zone.
Assistant Manager, Central Zone,
Central Zone Zonal Office”, B – Wing,
Third Floor,Sardar Patel Bhavan,
Danapith, Ahmedabad-380001.
Signature of Bidder Page 2 of
Ahmedabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
Notice inviting Tender
Competent authority on behalf of Municipal Commissioner of A.M.C. invites percentage rate
sealed tenders from interested contractors for the following work at different locations within the
limit of A.M.C.
1 Name of work bægÍtul Ntnvwh Jtuzobtk ykfjuµhegtle atje, djtSle atje lk.2,
djtSle atje lk.3, Atuxtjtjle atjebtk MJåA Cth< rbNl yk<od<
xtugjux hevuh fhJtlt ftb ctc<.
2 Estimated Tender Amount Rs.8,49,900.00 (exclusive of GST). GST will be paid extra by
AMC/Authority at prevailing rate to the contractor.
3 Tender fee Rs.900.00
(Non refundable) (Demand Draft in favour of Municipal Commissioner, Ahmedabad)
4 Time Limit 12 Months (Excluding Monsoon)
5 Download of Tender Tenders from the website www.nprocure.com or shall be down
Documents loaded mentioned AS PER TENDER NOTICE INVITED
6 Required registration Register “E-2” class having in Road Works in PWD in Govt. R&B /
CPWD / AMC or equivalent register with any other state Govt. or
7 Earnest Money Deposit Rs.8499.00 (Demand Draft / pay order / Bank Guarantee in favour of
(Bid security) Municipal Commissioner, Ahmedabad is to be submitted as prescribed
(1 % of Estimate put to as below. Demand Draft/Bank Guarantee shall be from approved list of
AMC of banks and the issuing branch of bank guarantee shall be of
Ahmedabad city only and it should be valid for for 180 days. (As Per
AMC finance Dept . Circular No.5 Dt.5/5/2007 & F.D. Circular
No.29 Dt.7/8/2010 & attched ANNEXURE - 1 finance dept.
circular No.40 Dt.05/11/2020. E.M.D. shall be submitted physically
along with the Physical Submission when applicable.
8 Submission of EMD and Tender Fee & EMD should Submitted physically along with tender
Tender Fees documents as described in the invitation of tender should be
submitted to Assistant Manager- Central Zone, 3rd Floor, B – Wing,
Sardar Patel Bhavan, Danapith, Ahmedabad-380001.
Bid submitted without bid security & tender fee shall be treated as
non responsive and shall be summarily rejected.
9 Mode of sending the The whole tender shall be submitted by two modes.
Tender Documents • Whole tender shall be submitted only on www.nprocure.com
website as per Schedule mentioned in Notice inviting Tender.
• Tender Fee, EMD, technical bid and other relevant PQ Documents
as per check list given in tender shall be submitted physically in
two copies (Original & duplicate) in sealed envelope as per
Schedule mentioned in Notice inviting Tender.
10 Last date of receiving As per Notice inviting Tender / Addendum / Corrigendum. The
Tenders. tenders received after latest schedule date and time will not be
entertained under any circumstances.
11 Submission of Price Bid The Price bid shall be submitted online only. The bidder shall fill
percentage rate on amount of BOQ online only until specified.
Price Bid shall be submitted physically duly signed & seal without
mentioning quoted rated, else it shall be considered as rejected.
Signature of Bidder
Ahmedabad Municipal Corporation
12 Opening of Technical bid As per Notice inviting Tender / Addendum / Corrigendum.
13 Tender validity period 120 days from the last date of submission of Tender.
14 Security Deposit 5 % of Contract Value to be submitted in the form of (Demand Draft /
pay order / Bank Guarantee in favour of Municipal Commissioner,
Ahmedabad. Bank Guarantee shall be from approved list of AMC of
banks as per attched ANNEXURE - 1 finance dept. latest circular.
and the issuing branch of bank guarantee shall be of Ahmedabad City
only. The validity of the Security Deposit shall be up to valid till
days beyond Date of completion of work.
The Security Deposit shall be payable in 10 days (for tenders upto
Rs.10.0 Lacs) or 15 days (for tenders of Rs.10.0 Lacs and above) from
date of receipt of LOI failing which interest @ 4% per annum will be
charged by AMC.
15 Deductions from Running
a. Retention Money 2 % amount of each Running Bill shall be deducted as a Retention
Money. Such retention money shall be released in the final bill of the
b. Labour welfare cess Labour welfare cess as per the Act, 1996 (non refundable) shall be
deducted from each running bill.
16 Defect & Liability Period Not applicable in this case. If applicable than refer condition of
contract attached over rule as per form B-1 published by Government.
17 Compansation for Delay 10 % of the actual balance work after Time limit expired.
• All the circulars which were published by Authorities of AMC time by time will be
applicable on said Tender and bound to bidder with out any condition.
• Conditional tenders will not be accepted in any case. Municipal Commissioner reserves
the rights to reject any or all the tenders without assigning any reasons thereof.
• The authorized signatory holding Power of Attorney shall only be the Digital Signatory. In
case authorized signatory holding Power of Attorney and Digital Signatory are not the
same, the bid shall be considered non-responsive.
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder
Ahmedabad Municipal Corporation
(On contractor’s Letter Head / certified with Stamp and Sign with Contact Detail)
TENDER DECLARATION FORM
Additional City Engineer
Ahmedabad Municipal Corporation,
Name of Work :- bægÍtul Ntnvwh Jtuzobtk ykfjuµhegtle atje, djtSle atje lk.2, djtSle atje
lk.3, Atuxtjtjle atjebtk MJåA Cth< rbNl yk<od< xtugjux hevuh fhJtlt ftb
I/We the undersigned have carefully gone through and clearly understood the Tender documents
of above mentioned project comprising of Notice Inviting tenders, Articles of Agreement, Scope of
work, Definition of terms, notes Instructions/Information to Bidder, Condition of Contract, special
condition of contract, Appendices, Specifications, Bill of Quantities, furnished by AHMEDABAD
MUNICIPAL CORPORATION.
I/We do hereby offer to execute and complete the whole of the work within the time
specified all in accordance with the specification, designs, drawing and instruction in writing
referred to in the said document and with such materials as mentioned for, at the respective rates
which I/we have quoted in the Price Bid or at such other rates as may be fixed under the
provisions of these conditions.
In the event of this tender being accepted I/We agree to enter into an agreement and
when required, execute the contract, according to your form 1 of agreement as or in default
where of I/we bound myself/ourselves to forfeit the "Earnest Money Deposit."
I/We understand that if I/We shall not enter in agreement within fifteen days or as
decided by AMC from the date of receipt of letter of acceptance, you will forfeit the earnest
money paid by me/us and take necessary action as deemed fit.
I/We have enclosed a Demand Draft / Bank Guarantee as an “Earnest Money Deposit", for
the sum as mentioned in NIT, the full value of which is to be absolutely forfeited to the Employer
If I/We fail to commence the work specified. Otherwise the Employer shall retain the said sum, as
on account of such Security Deposit as provided for in the aforesaid documents.
I/We agree not to employ sub-contractors other than those that may be approved in
accordance with conditions in the aforesaid documents.
I/We understand that Municipal Commissioner is not bound to accept the lowest or any
tender, which are received. I / We also understand & agree that Municipal Commissioner
Reserves the right to allot number of tenders to successful bidders at his sole discretion in case if I
/ We am/are lowest in more than one tender.
I/We am/are bound to execute the job if the work order is issued within 120 days from
the date of opening of the tender.
I am bound to execute the work by maintaining all Quality aspects/parameters mentioned
in the tender terms and conditions. I am also bound to submit all supporting Genuine Original
documents as and when asked and if any discrepancy found in such documents as well as in the
executed Work with respect to Quality/Quantity at any stage of work or even after completion of
work, it will be solely my Responsibility. I am bound to prove originality of all documents
submitted by me and if any Documents found false/fake then Municipal Commissioner/AMC has
right to take any action/penalty/punishment against me.
Signature of Bidder
Ahmedabad Municipal Corporation
I am also bound that if I/we, indulged into any malpractice and/or used any inferior
quality and/or the construction of road is found to be of an inferior quality under this contract
than in such case Municipal Commissioner/AMC has right to debar/ blacklist permanently.
I/We agree to pay the Government income-Tax, GST/Sales-Tax (Central and State), Octroi
duties, Royalty on material (i.e. Aggregate, Sand etc.) And any other taxes prevailing and from
time to time on such items on which the same are leviable and the rates quoted by me/us are
inclusive of the same.
Yours faithfully
Seal and Sign of Contractor
Signature of Bidder
Ahmedabad Municipal Corporation
INSTRUCTIONS TO BIDDERS
1. Scope of Bid
1.1 Competent authority on behalf of The Municipal Commissioner, Ahmedabad Municipal
Corporation (referred to as Employer in these documents) invites sealed bids for the
construction of works (as defined in these documents and referred to as “the work”)
detailed in the table given in the Invitation for Bid (hereinafter called as IFB.) from
competent bidder. The bidders may submit bids for the works detailed in the table given
2.0 Source of Funds
Ahmedabad Municipal Corporation has arranged the fund for this project.
3.0 Eligible Bidders
3.1 The Invitation for Bids is open to all eligible bidders meeting the eligibility criteria as
defined in this tender.
3.2 All bidders shall provide Qualification Information and Forms of Bid mentioned in the
Clause-14. An agency that has been engaged by the Employer to provide consulting
services for the preparation or supervision of the works, and any of its affiliates, shall not
be eligible to bid.
3.3 Any entity which has been declared as non-performing by NHAI / GoG / AMC or the firms
those are blacklisted/ debarred for specified period by AMC, Governement of Gujarat,
Government of India or any other entity controlled by it, would not be eligible to submit
4.0 Qualification of the Bidder
4.1 Requires registration:- Register as per Notice Inviting Tender having in Road Works in
PWD in Govt. R&B / CPWD / AMC or equivalent register with any other state Govt. or
5.0 DISQUALIFICATION
Even though the bidders meet the above mentioned qualifying criteria, they are subject to
be disqualified if they have,
• Made misleading or false representations in the forms, statements, affidavits and
attachments submitted in proof of the qualification requirements; and/or
• Record of poor performance such as abandoning the works, not properly completing
the contract, inordinate delays in completion, litigation history, or financial failures etc.
or debarring from AMC work etc.
• Tampered the bid document in any manner.
• Colluded with other prospective bidders for this work to arrive at quoted prices for the
purpose of restricting competition.
• Indulged in inducement of any official of AMC and/or their consulting engineer and
other advisors in any manner whatsoever.
• Proposal not submitted in accordance with this tender.
• During validity of the proposal, or its extended period, if any, the bidder changes his
commercial terms.
• The bidder qualifies the proposal with his own conditions.
• Proposal is received after due date and time.
• Commercial proposal is enclosed with the same envelope as technical proposal
• The envelope does not show on the outside the reference of bid and thus gets
opened before the due date of opening.
Signature of Bidder
Ahmedabad Municipal Corporation
• The E.M.D. is not deposited in full and in the manner as specified in the clause of
Earnest Money Deposit.
• The tender is in a language other than English or dose not contains its English
Translation in case of other language adopted for tender preparation.
• The tender documents received are not duly signed by authorized person.
• The validity of tender is less than what is stated in the tender.
• Any of the page or pages of tender is/are removed or replaced.
• Any condition which affect the cost.
• If it is joint venture.
5.1 Debarment / Black listing
Not with standing the above, the Employer may debar or blacklist any of the bidder(s) for
their misleading or false representations in the forms statements etc. for the period to be
decided by the Employer.
6.0 Cost of Bidding
The bidder shall bear all costs associated with the preparation and submission of his Bid.
Employer will in no case be responsible and liable for those costs.
The Bidder, at his own cost, responsibility and risk, is encouraged to visit, examine and
familiarize himself with the site of Works and its surroundings including source of earth,
water, road aggregates etc. and obtain all information that may be necessary for
preparing the Bid and entering into a contract for construction of the Works. The costs of
visiting the Site shall be at the Bidder's own expense.
8.0 Bidders shall not have any dispute or claim for any kind of compensation in case of,
• If the quantity stipulated in the tender items varies or the scope of work changes and
thereby total amount of work increases / decreases up to any extent.
thereby total amount of work increases / decreases up to any extent.
• If the works gets delayed / postponed for some administrative / technical decision
• If the items stipulated in the tender shall not be executed as per site condition/
requirements. No claim shall be entertained for the same.
• No idle charges shall be paid to contractor for machinery and man power if remain idle
and no claim shall be entertained for the same.
B. BIDDING DOCUMENTS
9.0 Content of Bidding Documents
9.1 The set of bidding documents comprises the documents listed below and addendum (if
1. Notice inviting e-Tender
2. Special conditions of Contract
3. Instructions to Bidders
4. Qualification Information
5. Conditions of Contract
6. Technical Specifications
7. Forms of Bid
8. Bill of Quantities
• The bidder is expected to examine carefully all instructions, conditions of contract,
contract data, forms, terms, technical specifications, forms, Annexes in the bid document.
Failure to comply with the requirements of bid documents shall be at the bidder’s own
Signature of Bidder
Ahmedabad Municipal Corporation
risk. Bids which are not substantially responsive to the requirements of the bid
documents shall be rejected.
10.0 Amendment of Bidding Documents
10.1 Before the deadline for submission of bids, the Employer may modify the bidding
documents by issuing addendum.
10.2 Any addendum thus issued shall be part of the bidding documents and shall be placed on
website www.nprocure.com The prospective bidder shall refer to website to check any
addendum before 24 hours of opening of bids. AMC will not give any advertisement for
10.3 To give prospective bidders reasonable time in which to take an addendum into account
in preparing their bids, the Employer may, at his desecration, extend as necessary the
deadline for submission of bids.
10.4 Prospective bidders should attach the addendum made for the work & if fails to do so
than also the changes made through such addendum shall be applicable & bound to the
C PREPARATION OF BIDS
11.0 Language of the Bid
All documents relating to the bid shall be in the English language only.
12.0 Documents comprising bid
The e bid submitted by the bidder shall be in two separate parts.
• Technical Bid
• Financial Bid
To qualify for award of the contract, each bidder must submit the following documents
along with bid:
• Required Registration Certificate
• Other requested documents
• Any other material / information required to be submitted in accordance with
these Instructions to Bidders (ITB)
Failure to submit these certificates/documents shall make the bid non-responsive.
Above original documents in physical form in two copies, one marked as “original” and
other marked as “Duplicate”, shall be submitted in a sealed envelope by 18:00 Hrs on the
date of physical submission of bid and addressed to the addressee given in the NIT duly
super scribed “Name of Work, Bid due date and time, Name and address of the bidder”
13.0 Bid Prices
• The contract shall be for the whole works as described in Bill of Quantity based on the
percentage rate in the Bill of Quantities submitted by the bidder..
• All duties, taxes, and other levies payable by the contractor under the contract, or for any
other cause shall be included in the rates, prices and total Bid Price submitted by the
Bidder, except otherwise stated in the Bid document. Employer will not compensate
the bidder (contractor) for any change in duties, taxes and other levies payable by the
contractor under the contract and any other reasons.
Signature of Bidder
Ahmedabad Municipal Corporation
• The percentage rate and bid price quoted by the bidder shall be fixed up to the
completion of Work and shall not be subject to adjustment on any account, except where
expressly specified, otherwise, in the contract.
14.0 Currencies of Bid and Payment
The currency of bid and payment shall be in Indian Rupees. All payments shall be made in
15.0 Bid Validity
15.1 Bids shall remain valid for 120 days from last date of submission of tender. A bid valid for
a shorter period shall be rejected by the Employer as non-responsive.
15.2 In exceptional circumstances, prior to expiry of the bid validity (120 days), the Employer
may request that the bidders may extend the period of validity for a specified additional
period. The request and the bidders' responses shall be made in writing or by cable. A
bidder may refuse the request without forfeiting his bid security. A bidder agreeing to the
request will not be required or permitted to modify his bid, but will be required to extend
the validity of his bid security for a period of the extension.
16.0 Earnest Money / Bid Security
16.1 The Bidder shall furnish, a Bid Security of the amount as shown in the Table of IFB as part
of his bid, in the form of Demand Draft / pay order / Bank Guarantee in favour of
Municipal Commissioner, Ahmedabad valid for 120 days.
16.2 The issuing branch of the bank guarantee shall be of Ahmedabad City only.
Signature of Bidder
Ahmedabad Municipal Corporation
Signature of Bidder
Ahmedabad Municipal Corporation
16.3 Any bid not accompanied by an acceptable Bid Security shall be rejected by the Employer
as non-responsive.
16.4 Any bid having bid security for lesser value and shorter validity period shall be treated as
non-responsive.
16.5 (a) The bid security of the unsuccessful bidders, except for L1, L2 and L3 bidders will be
returned as promptly as possible.
(b) The bid security of the successful bidder, along with second and third lowest tenders,
will be returned when the successful bidder has furnished the required security
deposit and signed the agreement.
16.6 The Bid Security of the Successful Bidder will be discharged when the bidder has signed
the Agreement and furnished the required security deposit.
16.7 The Bid Security shall be forfeited,
a) if the Bidder withdraws the Bid after Bid opening during the period of Bid validity;
b) in the case of a successful Bidder, if the Bidder fails within the specified time limit to
(i) sign the Agreement; or
(ii) Furnish the required security deposit.
(iii) commence the work after signing the agreement within 15 days
16.8 No interest shall be paid by the owner on any tender guarantee. The issuing branch of the
bank guarantee shall be of Ahmedabad City only.
16.9 Bank Guarantee for Earnest Money Deposit should be executed on non-judicial Stamp
papers of requisite value in accordance with the stamp Act applicable to that particular
state of Indian Union, where executed.
16.10 The executing officers of the bank Guarantee for Earnest Money Bid Security shall clearly
indicate in (block letters) his name, designation, Power of Attorney No. / Signing Power
16.11 Each page of the bank guarantee for Earnest Money Deposit shall be duly signed/initialed
by the executing officers and the last page shall be signed in full, indicating the particulars
as aforesaid under the seal of the Bank.
D. SUBMISSION OF BIDS
17.0 Sealing and Marking of Bids
17.1 The bidder shall submit the Technical Bid only. The Bid shall be sealed in separate
envelopes and the three sealed envelopes shall be sealed in an outer envelope. The Bid
envelopes shall be marked as follows:-
• Complete Tender Document with all necessary qualification related documents (in
Above two envelopes shall be kept in one envelope and it should be marked as “Technical
Bid” and sealed. This Outer envelope should mention the name of firm of bidder, his
address, contact details & name of the work.
17.2 The inner and outer envelopes
a) Shall be addressed to the Employer at the following address:
Assistant Manager- Central Zone,
Signature of Bidder
Ahmedabad Municipal Corporation
3rd Floor, B – Wing, Sardar Patel Bhavan,
Danapith, Ahmedabad-380001.
c) Bear the following identification:
Indicate the name and address of the bidder.
• If the outer envelope is not sealed and marked as above, the Employer will assume no
responsibility for the misplacement or premature opening of the bid.
18.0 DEADLINE FOR SUBMISSION OF THE BID
18.1 Complete Bids (including Technical bid and necessary documents) must be received by
the Employer at the address specified in bid information not later than the date indicated
on the face sheet of the document. In the event of the specified date for the submission
of bids declared a holiday for the Employer, the Bids will be received up to the appointed
time on the next working day. The Bidder is further required to submit Documents in
Physical Form on or before the Bid Due Date and before the time of submission as
specified in NIT, at the following address:
Assistant Manager- Central Zone,
3rd Floor, B – Wing, Sardar Patel Bhavan,
Danapith, Ahmedabad-380001.
18.2 AMC assumes no responsibility for inability of a bidder to submit bids through (n) procure
e-tendering portal on account of delay in submission at bidder's end. Bidder shall ensure
that they submit the bid well before the "Due Date & Time of Bid- Submission". AMC shall
not be responsible if bidder is not able to submit the bid on account of failure in
network/internet connection or any other technical reason.
18.3 The Employer may extend the deadline for submission of bids by issuing an amendment in
accordance with respective Clause, in which case all rights and obligations of the
Employer and the bidders previously subject to the original deadline will then be subject
to the new deadline.
18.4 All bidders are requested to see the website of (n) procure for amendment / corrigendum
18.5 Any Bid received by the Employer after the deadline prescribed in NIT will be rejected and
returned unopened to the bidder.
Any Bid received by the Employer after the deadline prescribed in NIT will be returned
unopened to the bidder.
20.0 NOTIFICATION OF AWARD & SIGNING OF AGREEMENT
The Bidder whose Bid has been accepted will be notified of the award by the Employer
prior to expiration of the Bid validity period by writing, facsimile or e-mail confirmed by
registered letter. This letter (hereinafter and in the Conditions of Contract called the
“Letter of Acceptance” will state the sum that the Employer will pay the Contractor in
consideration of the execution, completion, and maintenance of the Works by the
Contractor as prescribed by the Contract (hereinafter and in the Contract called the
“Contract Price”).
The notification of award will constitute the formation of the Contract, subject only to the
furnishing of a Security Deposit in accordance with the provisions of Clause.
The agreement will incorporate all correspondences between the Employer and the
Successful Bidder. It will be signed by the Employer and the Successful Bidder.
Signature of Bidder
Ahmedabad Municipal Corporation
21.0 SIGNING OF CONTRACT AGREEMENT
21.1 The Employer and the successful bidder shall enter into a Contract Agreement within
days after the successful bidder (hereinafter called the Contractor) receives the Letter of
Acceptance, unless they agree otherwise, subject to furnishing the security deposit before
signing the Agreement with the Employer.
21.2 Upon issue of ‘Letter of Acceptance’ to the successful Bidder, the Employer will promptly
notify the other Bidders that their Bids have been unsuccessful and release their Earnest
Money Deposit / Bid Security.
22.0 SECURITY DEPOSIT
22.1 Within 15 days of receipt of the Letter of Acceptance, the Successful Bidder shall deliver
to the Employer a security deposit in the form of Bank Guarantee for an amount
equivalent to 5% of the Contract Price valid for the period of valid till 90 days beyond Date
of completion of work. The Security Deposit shall be payable in 10 days (for tenders upto
Rs.10.0 Lacs) or 15 days (for tenders of Rs.10.0 Lacs and above)from date of receipt of
LOA failing which interest @ 4% per annum will be charged by AMC.
22.2 The security deposit shall be in the form of a Bank Guarantee in the name of the
Employer, from Ahmedabad branch of any Banks mentioned in the clause no. 16.2 of
these tender documents.
22.3 This security deposit shall be released only after the clearance of final bill including pre &
22.3 Interest @ 4 % per annum shall be deducted from contractor in case of late submission of
security deposit or late renewal of bank guarantee for the number of days delayed for
submission or discontinuity of the bank guarantee.
22.4 Bank Guarantee to be submitted in the prescribed format enclosed and shall be same
verbatim as per the format. Bank Guarantee shall be submitted on right value of stamp
paper and for correct value of contract.
22.5 Failure of the Successful Bidder to comply with the requirements of Sub-Clause 22.1 shall
constitute sufficient grounds for cancellation of the award and forfeiture of the Bid
22.6 In case of any contract amendment during execution of the contract enhancing value of
the contract the BG value shall be enhanced accordingly. Validity of BG shall be
commercial terms and conditions of the tender.
22.7 All compensation or other sums of money payable by the Contractor to the Employer
under the terms of this Contract or any other contract or on any other account
whatsoever may be deducted from Security Deposit. Also in the event of the Contractor's
Security Deposit being reduced by reasons of such deductions, as aforesaid, the
Contractor shall, within 14 days of receipt of notice of demand from the Engineer-in-
Charge, make good the deficit in Security Deposit.
22.8 Should there arise any occasion under the Contract due to which the periods of validities
of Bank Guarantees as may have been furnished by the Contractor from time to time, are
required to be extended/renewed, the Contractor shall get the validity periods of such
guarantees extended/renewed, and furnish these to the Engineer-in- Charge one month
before the expiry date of the aforesaid Guarantees originally furnished failing which the
existing Bank Guarantees shall be invoked by the Engineer – in – charge. Also in case of
any deficit in securities on any account as might occur or is noticed, the Contractor shall
forthwith recoup/replace the same with acceptable Security Deposit.
22.9 The Bank Guarantee shall be extended within the expiry dates wherever activities as per
contract are not completed in all respects.
Signature of Bidder
Ahmedabad Municipal Corporation
22.10 The Security Deposit less any amount due shall, on demand, be returned to the contractor
after 45 days of completion date / Final Bill paid date which ever is later. No interest on
the amount of Security Deposit shall be paid to the Contractor at the time of release of
Security Deposit as stated above.
22.11 The successful bidder to whom ‘LOA’ has been issued shall enter into an agreement at
Employer’s office within 15 days of LOA.
23.0 Advance Payment and Security
The Employer will not provide any advance payment.
24.0 Dispute Review Expert
In case of all the disputes, decision of the Municipal Commissioner, Ahmedabad shall be
final and binding to the bidder.
25.0 LITIGATION HISTORY
The applicant should provide accurate information on litigation and/or arbitration
resulting from Contractors completed or under execution by him over last five years. If
the details of Litigation History are hidden by the Bidder and later on it comes to the
knowledge of the Employer, the Bidder shall be disqualified for the proposed work and
other appropriate actions shall be taken against the bidder.
DETAILS OF COMPLETED / ONGOING LITIGATION / ARBITRATION
Employer Value of the Reasons/Details for Remarks showing
Year Name of Project (Rs.) litigation/arbitration Present Status
The bidder shall furnish separate table for individual project.
The above information shall be supported with necessary documents otherwise the same
shall be treat as null and void.
A consistent history of arbitration awards? Judgments against the applicants or any
partner of a joint venture may result in disqualification for proposed work.
If the details of litigation History is hidden by the applicant and later on it comes to
knowledge of the employer the bidder shall be disqualified for the proposed work and
other appropriate actions shall be taken against the bidder.
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder
Ahmedabad Municipal Corporation
GENERAL CONDITIONS OF CONTRACT
1.0 Liquidated Damages
1.1 If the Contractor fails to complete the works within the original or extended time limit,
the Contractor shall pay penalty of 10% of amount of actual remaining work. The amount
of work for which the scope of contractor is reduced shall not be considered for the
calculation of Liquidated Damages.
1.2 Conditions mentioned in the AMC Finance Department Circular AMC no. 18 Date:
23/05/2017 and all latest Circulars shall be applicable.
2.0 Retention Money
2 % amount of each Running Bill shall be deducted as a Retention Money. Such retention
money shall be released in the final bill of the said work. AMC reserves right to deduct any
amount to compensate the poor performance of the contractor i.e. poor quality or
abandoned / incomplete work.
3.0 Subcontracting
3.1 Except where expressly specified in the Contract, the Contractor shall not subcontract any
portion of Work without the approval of the Employer’s Representative. Any
subcontracting shall not relieve the Contractor from any contractual obligations or
responsibility under the Contract.
3.2 The Contractor shall not be required to obtain consent for a subcontract for which the
name of the subcontractor and scope of works activities to be performed by him is
already stated in the contract or supply of material or engagement of labour.
4.1 The Contractor shall employ the key personnel named in the Schedule of Key Personnel as
referred to in the Bid document to carry out the functions stated in the Schedule or other
personnel approved by the Engineer. The Engineer will approve any proposed
replacement of key personnel only if their qualifications, abilities, and relevant experience
are substantially equal to or better than those of the personnel listed in the Schedule.
4.2 If the Engineer asks the Contractor to remove a person, without assigning reasons
thereof, for his misconduct or inadequacy of technical skills and experience, who is a
member of the Contractor’s staff or his work force, the Contractor shall ensure that the
person leaves the Site within seven days and has no further connection with the work in
4.3 No residential accommodation is allowed at the site of work. The labour huts shall not be
erected on the site of work and contractor shall make his own arrangements to provide
such accommodations as per the rules of the local bodies. He shall make his own
arrangements for housing, stores, field office etc. He shall submit a site layout plan
indicating the location of various site facilities to be created by him at his cost for the
execution of work. The Owner shall in no way be responsible for any delay on this account
and no claim on this account whatsoever shall be entertained. All Basic amenities shall be
provided by the Contractor to Labours as per the prevailing labour Laws.
Signature of Bidder
Ahmedabad Municipal Corporation
5.1 The Contractor shall have full regard throughout execution, completion and defects
liability period to following safety aspects and shall take all necessary steps to ensure that
danger to safety is avoided all the time in respect of,
Safety of the works
• Safety of the Contractor’s employees and all the persons directly or indirectly
engaged by him for the works
• Safety of all the employees including persons working on other contracts of
Employer at the same site of the Employer and Engineers employees engaged at
• Any authorized third party persons on the site.
• Contractor’s plant and equipment
5.2 The Contractor shall provide and maintain at his costs all lights, guards, fencing, warning
signs, barricading, and cones; when and where necessary, or required by Engineer in
Charge or by any duly constituted authority for the protection of the works or for the
safety and convenience of the public or other.
5.3 The Contractor shall take all reasonable steps to protect the environment on and off the
site and avoid damage or nuisance to persons or property of the public and others arising
as a consequence of his method of operation.
5.4 The Contractor shall maintain in good condition all work throughout execution,
completion, and defects liability period. The contractor shall be responsible for and to
make good all injuries, damages and repairs, rendered necessary by fire, rain, traffic,
floods or other causes.
5.5 All the scaffolding work, wherever required for the execution of work, shall be provided
by the contractor. Nothing extra shall be payable on this account. It shall be provided
strictly with double scaffolding system with all the accessories etc. with adjustable
suitable working platforms to access the areas, with ease for working and inspection. It
shall be designed to take all incidental loads. It should cater to the safety features for
workmen. It shall be ensured that no damage is caused to any structure due to
5.6 All temporary warning/ caution boards display shall be provided and displayed during day
as well as night time by the contractor, wherever required and as directed by the
5.7 Arrangement of temporary water and electricity and telephone connection required, by
him, shall be made by the Contractor at his own cost and also necessary permissions
directly from relevant Owners shall be obtained by him under intimation to the Owner.
Also all initial and running charges and security deposit, if any in this regard shall be borne
by him. The Contractor shall abide by all the rules/ bye laws applicable in this regard and
he shall be solely responsible for any penalty on account of violation of any of the rules
and byelaws in this regard.
5.8 In any case if any fatal accident (major or minor) occurs due to poor safety precautions,
the same shall be completely contractor’s responsibility. All the losses due to such
accidents and expenses of legal matters shall be borne by contractor.
5.9 The Contractor shall be responsible for maintenance and watch and ward of the complete
installation and shall also be responsible for any pilferage, theft, damage, penalty etc. in
this regard. The Contractor shall indemnify the Owner against any claim arising out of
pilferage / theft, damage, penalty etc. whatsoever on this account.
Signature of Bidder
Ahmedabad Municipal Corporation
5.10 The Contractor shall depute Site Engineer & skilled workers as required for the work.
Necessary protective and safety equipments shall be provided to them by the Contractor
at his own cost and used at site.
6.0 Contractor to keep site clean:
During the execution of the work, the Contractor shall keep the site clean. All wreckage
rubbish, excess materials, temporary works no longer required will be removed from site
7.0 Clearance of site on completion:
The Contractor shall clear away and remove all Contractors equipment, surplus materials,
rubbish, temporary works of every kind.
A. COST CONTROL
8.0 Bill of Quantities
a. The schedule-B shall contain Memorandum showing items for the construction,
installation, testing, and commissioning work to be done by the Contractor.
b. The quantities stated in the schedule B are estimated quantities. The Contractor shall
be paid only quantities calculated after taking measurements of executed work. The
rate stated in the schedule B for each item of work shall apply. The works shall be
measured by the Contractor jointly with the authorized representative of the
Engineer and all particulars required by the representative of the Engineer shall be
supplied by the contractor.
c. The work shall be measured net. No allowance for general or local custom, working
space etc. is to be made.
9.1 The Engineer in Charge shall have power to make any variation of form, quality or
quantity of the works or any part thereof that may, in his opinion, be necessary and for
that purpose, or if for any other reason it shall, in his opinion, be appropriate, he shall
have the authority to instruct the Contractor to do and the Contractor shall do any of the
Increase or decrease the quantity of any work up to any extent included in the
Omit any such work,
Change the character or quality or kind of any such work,
Execute additional work of any kind necessary for the completion of the Works or
Change any specified sequence or timing of construction of any part of work.
9.2 No such variation shall in any way vitiate or invalidate the contract, but the effects, if any,
of all such variations shall be valued in accordance with the following sub clauses.
Provided that where the issue of an instruction to vary the Works is necessitated by some
default or breach of contract by contractor or for which he is responsible, any additional
cost attributable to such default shall be borne by the Contractor.
9.3 The Contractor shall not make any such variation without an instruction of the Engineer.
No instruction is required for quantities varying from those provided for the items in the
contract schedule B.
Signature of Bidder
Ahmedabad Municipal Corporation
10.1 The basis for the valuation of variations for addition to the Contract Price shall be as
follows in the same order of priority.
a) Variations in the quantities of work in schedule of quantities shall not vitiate the
b) The contractor shall be bound to execute extra items of work as directed by the
Engineer-in-charge.
c) Contract unit rates for individual items shall apply to varied quantities where there is
a quantity variation.
d) The price variations on extra item will not be given.
e) In case of other non tender items following procedure shall apply.
10.2 If any extra item crops up during the progress of work the same shall be carried out by the
Contractor and he shall be paid at the rate fixed by Employer which shall be fixed as
lowest of the rates derived by rate analysis based on the following three methods. , the
priority of the documents forming the Contract shall be as follows:
(i) If the extra item is included in the S.O.R. of Road & Building Department, Year 2013-
14, the rate of extra item shall be that rate and premium (above or below) quoted by
(ii) Rate analysis based on prevailing Govt. of Gujarat’s SOR rates.
(iii) Rate analysis based on current market rates. This shall be based on
The material costs, the labour costs, the cost of use of all plant, machinery and
equipment, the cost of all temporary and incidental works, the overheads and the
Contractors profit.
The overheads shall be taken at 5 % of the sum of material costs, the labour costs,
the cost of use of all plant, machinery, and equipment, the cost of all temporary
and incidental works.
10.3 In case of the rate is to be derived from prevailing market rate, the Contractors profit shall
be taken at 10 % of the final rate derived.
10.4 In the event of disagreement, the Engineer in Charge shall fix such rates and prices as are,
in his opinion appropriate and shall notify the Contractor accordingly with a copy to the
10.5 The Engineer shall determine provisional rates and prices to enable on account payments
to be included in the Interim Payment Certificates, until rates and prices are agreed as
final by the Employer, the Contractor, and the Engineer.
10.6 The Contractor shall not be entitled to additional payment for costs, which could have
been avoided by giving early warning.
11.1 Payments shall be adjusted for deductions for advance payments, retention, other
recoveries in terms of the contract and taxes at source, as applicable under the law. The
Employer shall pay the Contractor the amounts certified by the Engineer.
11.2 If an amount certified is increased in a later date certificate due to corrections in previous
certificates or as a result of an award from disputes review experts, Contractor shall be
paid such amount only. The Contractor shall not be paid any interest upon such delayed
11.3 Items of the work for which no rate or price has been entered in will not be paid for by
the Employer and shall be deemed covered by other rates and prices in the Contract.
11.4 All payments shall be made in Ahmedabad.
12 Taxes and duties
Signature of Bidder
Ahmedabad Municipal Corporation
12.1 The rates are inclusive of all the prevailing taxes and duties of the Central, State and Local
Governing bodies prevailing on the date of award of the contract. The Contractor will
have to pay all such taxes and duties for the performance of this Contract. The Employer
will deduct from the Contractor’s monthly and other payments all taxes and duties, which
he is bound to recover in accordance with the applicable law.
12.2 The Contractor shall keep himself fully informed of all acts and laws of the Central & State
and local Governing bodies, all orders, decrees of bodies, tribunals having any jurisdiction
or authority which in any manner affect those engaged or employed, and anything related
to carrying out the work. All the bye-laws lay down by AMC/AUDA and any other local
bodies while executing the work shall be adhered to. All taxes of local bodies shall be
borne by the contractor. The Contractor shall arrange to give all notices required by any
authority and to pay to such authority all the fees that may have to be paid for the
material, plants, equipments etc. The Contractor shall also adhere to all traffic restrictions
notified by the local authorities. He shall protect and indemnify the Owner and its officials
& employees against any claim or liability arising out of violations of any such laws,
ordinances, orders, decree, whether by himself or by his employees or his authorized
representatives. Nothing extra shall be payable on these accounts.
13.0 Labour Welfare Cess
As per circular No. GHR/2005/04/CWA/2004/841/M-3 dt. 3/1/05 and G.R. No. CWA/2004-
1831-M(3) dt. 9/12/05 issued by G.O.G. (non-refundable) shall be deducted from every
bills which shall be deposited to Govt. Labour Department for Labour welfare fund.
14.0 Currencies
All payments shall be made in Indian Rupees.
15.0 Advance Payment
No Advance Payment shall be made.
16.0 Cost of Repairs
Loss or damage to the Works or Materials to be incorporated in the Works between the
Start Date and the end of the Defects Correction periods shall be remedied by the
Contractor at the Contractor's cost if the loss or damage arises from the Contractor's acts
B. FINISHING THE CONTRACT
17.0 Completion
The Contractor shall request the Engineer to issue a Certificate of Completion of the
Works and the Engineer will do so upon deciding that the Work is completed.
18.0 Termination
18.1 The Employer shall be entitled to terminate the contract if the contractor:
(a) Fails to carry out any obligation under the contract.
(b) Without reasonable excuse fails –
1. To commence the works on site within the period stated in the Appendix to Bid
after receipt by him of a Notice to this effect from the Engineer/Employer after
signing the agreement or
2. To proceed with the works, or any section thereof, within 28 days after received
Signature of Bidder
Ahmedabad Municipal Corporation
3. Has failed to comply with a notice issued or an instruction issued within 28 days
after having received.
4. Abandons the works or otherwise plainly demonstrates the intention not to
continue performance of his obligation under the contract.
5. Sub-contracts the works or assigns the contract without the specific prior written
permission of the engineer.
6. Has failed to furnish the required securities or extension thereof in terms of the
7. Becomes bankrupt or insolvent, goes into liquidation, has a receiving or
administration order made against him, compounds with his creditors, or carries
on business under receive, trustee or manager for the benefit of his creditors, or
if any act is done or event occurs which (under applicable Laws) has a similar
effect to any of these acts of event.
18.2 In any of these events or circumstances, the Employer may, upon giving 14 days notice to
the contractor, terminate the contract and expel the contractor from the site. However, in
the case of sub-paragraphs (h), the Employer may be notice terminate the contract
18.3 The Employer’s decision to terminate the contract shall not prejudice any other rights of
the Employer, under the contract or otherwise.
18.4 After termination, the Employer may complete the works and/or arrange for any other
entities to do so. The Employer and these entities may then use any goods, contractor’s
documents and other design documents made by or on behalf of the contractor.
18.5 The Employer or the Contractor may terminate the Contract if the other party causes a
fundamental breach of the Contract.
18.6 Fundamental breaches of Contract include, but shall not be limited to the following:
(a) the Contractor stops work for 14 days when no stoppage of work is shown on the
current Program and the stoppage has not been authorized by the Engineer;
(b) the Employer or the Contractor is made bankrupt or goes into liquidation other than
for a reconstruction or amalgamation;
(c) The contractor fails to fulfill requirements;
(d) the Engineer gives Notice that failure to correct a particular Defect is a fundamental
breach of Contract and the Contractor fails to correct it within a reasonable period of
time determined by the Engineer;
(e) the Contractor does not maintain a security which is required;
(f) the Contractor has delayed the completion of works by the number of days for which
the maximum amount of liquidated damages becomes payable as defined in the
(g) if the Contractor, in the judgment of the Employer has engaged in corrupt or
fraudulent practices in competing for or in the executing the Contract.
(h) For the purpose of this paragraph: “corrupt practice” means the offering, giving,
receiving or soliciting of anything of value to influence the action of a public official in
the procurement process or in contract execution. “Fraudulent practice” means a
misrepresentation of facts in order to influence a procurement process or the
execution of a contract to the detriment of the Borrower, and includes collusive
practice among Bidders (prior to or after bid submission) designed to establish bid
prices at artificial non-competitive levels and to deprive the Borrower of the benefits
of free and open competition.”
18.7 When either party to the Contract gives notice of a breach of contract to the Engineer for
a cause other than those listed above, the Engineer shall decide whether the breach is
fundamental or not.
18.8 Notwithstanding the above, the Employer may terminate the Contract for convenience.
Signature of Bidder
Ahmedabad Municipal Corporation
18.9 If the Contract is terminated the Contractor shall stop work immediately, make the Site
safe and secure and leave the Site as soon as reasonably possible and handover the site to
the Employer including all materials and plant and equipment existing there upon.
19.0 Contractor's own responsibility
The contractor is to set out and level the works and will be responsible for the accuracy of
the same. He shall also be responsible for the correctness of the positions, levels,
dimensions, and alignment of all parts of the structures as per instructions given to him. If
at any time any error shall appear during the progress of any part of the work, the
contractor shall at his own expense rectify such error if called upon to the satisfaction of
the Engineer in charge.
20.0 Overpayment & Underpayment
20.1 Whenever any claim Fifths payment of a sum to the Municipal Corporation arises out of
or under this Contract against the contractor the same may be deducted by the Municipal
Corporation from any sum then due or which at any time thereafter may become due to
the contractor under this contract and failing that under any other contract with the
Municipal Corporation or from any sum due to the contractor with the Municipal
Corporation (which may be available with Municipal Corporation), or from his retention
money, or he shall pay the claim on demand. The Municipal Corporation reserves the right
to carry out post payment audit and technical examination of the final bill including all
supporting vouchers, abstracts, etc.
20.2 The Municipal Corporation further reserves the right to enforce recovery of any over
payment when detected notwithstanding the fact that the amount of the final bill may be
included by the Contractor.
20.3 If as a result of such audit and technical examination any over payment is discovered in
respect of any work done by the Contractor or alleged to have been done by him under
the contract, it shall be recovered by the Municipal Corporation from the contractor by
way of all the means prescribed above or if any under payment is discovered by the
Municipal Corporation, any amount due to the contractor under this contract or under
payment may be adjusted against any amount then due or which may at any time
thereafter become due before payment is made to the contractor from him to the
Municipal Corporation on any other contract account whatsoever.
21.0 Materials obtain from dismantling
If the contractor, in the course of execution of work is called upon to dismantle any part
for reasons other than on account of bad or imperfect work, the materials obtained from
dismantling will be the property of the A.M.C. and will be disposed of as per instruction of
Engineer-in-charge in the best interest of the A.M.C.
22.0 Dispute to be referred to Arbitrator
The disputes relating to this contract, so far as they relate to any of the following matters,
whether such disputes arise during the progress of the work or after the completion or
abandonment thereof, shall be referred an independent Arbitrator appointed by AMC as
far possible in consultation with the agency if it is necessary and such disputes shall be
settled in accordance with the arbitration and conciliation Act.
(i) The rates of payment under clause 5 for any tools, materials and stores, in or
upon the works of the site thereof or belonging to the contractor or procured by
Signature of Bidder
Ahmedabad Municipal Corporation
him and intended to be used for execution of the work or any part thereof
possession of which may have been taken by the Engineer-in-charge under the
said clause –5.
(ii) The reduction in rates made by the Engineer-in-charge under clause 9 from the
items of works not accepted as completed fully in accordance with the sanctioned
specifications.
(iii) The rate of part of payment for any class of work which is included in the
additional or altered work carried out by the contractor in accordance with the
instructions of the Engineer-in-charge under clause 14 and the rates for which is
to be determined under the said clause
(iv) The rates of payment for materials already purchased or agreed to be purchased
by the contractor before receipt of notice given by the Engineer-in-charge under
clause 15 and/or amount of compensation payable to the contractor under the
said clause for loss in respect of such materials.
(v) The amount of compensation which the contractor shall be liable to pay under
clause 17 in the event of this failure to rectify, remove or reconstruct the work
within the period specified in the written intimation or the amount of expenses
incurred by the Engineer-in-charge under the said clause17 in rectifying, removing
or re-executing the work or in removing and replacing the materials or articles
(vi) The reduction of rates as may be fixed by the Engineer-in-charge under clause
for the inferior work or materials as accepted or made use of.
(vii) The amount of compensation payable by the contractor for damages as estimates
and assessed under clause
(viii) The amount payable to the contractor for the work carried out under clause 33 in
accordance with the instructions and the requirement of the Engineer-in-charge
in case where there are no specifications.
(ix) The awards declared by the arbitrator shall be speaking award giving reasons and
calculations to every item of claims. The decision will have to be implemented by
all the concerned.
(x) In case of dispute leading to the contractor or Ahmedabad Municipal Corporation
approaching on Court of Law. It shall be within the jurisdiction where the site of
work is situated.
The reference to arbitration proceeding under this clause shall not:
i) Entitle the contractor to stop the Affect the right of the Engineer-in-charge under clause
5 to take possession of all or any tools, plants, materials and stores in or upon the works
of site thereof belonging to the contractor or procured by him and intended to be used
for the execution of the work or any part thereof.
ii) Preclude the Engineer-in-charge from utilizing the materials purchased by the
contractor in any work or from removing such materials to other places, during the
period the work is stopped or suspended in pursuance, of notice given to the contractor
iii) Progress of the work or the carrying out the additional or altered work in accordance
with the provisions of clause 14 or as the case may be, of clause
23.0 Drawings and Photographs of the Works
23.1 The contractor shall do photography/ videography of the site as and when asked by AMC.
No separate payment will be made to the contractor for this. . The contractor shall have
to submit the same in hard copy as well as soft copy as and when demanded by the AMC.
23.2 No photograph of the works or any part thereof or plant employed thereon, except those
permitted under clause 59.1, shall be taken, or permitted to be taken by the Contractor or
by any of his employees or any employees of his sub-Contractors without the prior
Signature of Bidder
Ahmedabad Municipal Corporation
approval of the Engineer in writing. No photographs/ videography shall be published or
otherwise circulated without the approval of the Engineer in writing.
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder
Ahmedabad Municipal Corporation
ybœtJtœ BGþrlrmvj ftuvtuohuNl
ftb btxuLþk xftJthe œhJt¤wk xuLzh ylu ftuLx[tfx
xuLzh btxule Nh<tu
(1) y:- yt xuLzh su <u Jdolt ybœtJtœ BGþrl.ftuvtuohuNl y&Jt fuLî{ y&Jt htsg mhfthle
btLg gtœelt ftuLx[fxhtu Che NfNu. dJobuLxlt btLg ftuLx[tfxhu ybœtJtœ
BGþrl.ftuvtuohuNlbtk btLg ftuLx[tfxhtule gtœebtk hSMxuNl fhtJJtlwk hnuNu.
c:- btLg ©uKelt ftuLx[tfxh <hefu ltuk^Kelwk «btKvºtle MJ «btKe< fhuj lfj xuLzh mt&u
stuzJtle hnuNu.
f:- xuLzhhle jtgft<
ftb sJtc>th xuLzhh <ubs su xuLzhh mwaJuj ftuLx[tfxhle ©uKe ytJ<t ntug <ubs ftb
fhJt mûtb ntug <ublu s ytvJtbtk ytJNu. ftb ytv<t vnujt ftuLx[tfxhu ftb
mk<tu»tfthf <ubs xtRb jebexbtk ÃþY fhJt sYhe mJj<,ylwCJ, ûtb<t ylu
VtgltLmegj hemtumo hsw fhJtlt hnuNu.
z:- ybœtJtœ Bgwrlrmvj ctuzo XhtJ lk - 3836,<t.25/11/2011 &e b¤uj bkswhe
ylwmth <&t mexe.Rsluh mh¾gwjh,lk -17,<t.09/12/2012 bwsc ybœtJtœ
Bgwrlrmvj ftuvtuohuNlbtk ftuLx[t¾xh hSMxuNl Ve, heLgwyj Ve <&t yvd{uzuNl Ve ylu
btvœkztu ægtlbtk htFe <u bwsc ybj fhJtltu hnuNu.
E:- xuLzh Ch<t vnujt xuLzhhu mtRx rlheûtK fhe juJwk. xuLzhh ftblt «fth, ngt< hM<t,
vtKe btdo, mkath ylu JvhtNlt ceò hM<tytu&e mk<wÐ ntuJtlwk btle juJtbtk ytJNu.
xuLzhhu ftblu mtRx ylu rcÕzekd(fu su ftb fhJt, ftb ÃþY fhJt <&t ftblt buRxulLm
btxu cltJuj ntug).<ubs xuLzhhu yt mtRxlt ftb btxu, rcÕzekd btxu, gtzo, zevtu btxule
søgt vtu<tle he<u bu¤Je juJtle hnuNu. (xuLzhlwk ftb fhJt, ftb vwhwk fhJt <&t ftblt
buRxulLm btxule søgt)
(h) yt ftble mbg bgtoœt bubtuhuLzb (ltuxem RLJtRxuz xuLzh) btk sKtJuj «btKu le hnuNu.
(3) xuLzh Jujezexe rvhegz bubtuhuLzb (ltuxem RLJtRxuz xuLzh) btk sKtJuj «btKu le hnuNu.
(4) xuLzh Ch<e JF<u yluoMxble ChJtle hnuNu.
(5) xuLzh Vtubo
xuLzh Vtubo ylu ylwmwrabtkle œhufu œhuf Ftje søgt xuLzh Chlthu Chuje yt mt&u btufjujt
œM<tJus vh< fhJtlt hnuNu.
(6) ftuLx[tfxhtuyu leaule ctc<tu ft¤SÃËJof JtkaJt rJlk<e Au.
(1) ftuR fkvlelu ltbu xuLzh juJtbkt ytÔgwk ntug <tu fkvle J<e xuLzh vh mne fhlth Ôgrf<lu
yr^f]< fh<wk bwFðgthltbwk xuLzh mt&u hsw fhJtlwk hnuNu.
(2) Bgwrl.ftuvtuohuNllt «Joðbtl rlgbtu ylwmth yluMxble ChJtle hnuNu.ylu xuLzh mt&u
Signature of Bidder
Ahmedabad Municipal Corporation
(3) ftuLx[tfxhu RLfbxuût mkckr^< vtl lkch <&t cukf zexuRj ytvJtle hnuNu.
(4) ftuLx[tfxh vtmu ydtWlt ylwCJt ykdult «btKvºttule lfj xuLzh mt&u hsw fhe NfNu.
(5) xuLzh Nh<tu ylu MvuNeVefuNl <&t CtJ vºtflt œhuf vtlt ylu rJd<tu vh ftuLx[tfxhu
(6) <btb mw^tht, AufAtf ylu Dwkxujt jFtK vh ftuLx[tfxhu xwkfe mne fhJe.
xuLzh Chlthlu sKtJJtbtk ytJu Au fu xuLzh œM<tJustult jFtKbtk ftuR AufAtf fu
VhuVth fhJtbtk ytJtNu lrn ylu ytJe ftuR AufAtf fu VuhVth juJtNu lrn, <ultk
jFtKbtk ftuR Cwj ntug <tu <ult vh l Dwkx<t Ftuxt jFtK fu ytkfzt vh Auftu bthelu
<ult mtawk jFtK fu ytkfzt MvÐ Wfju <u he<u jFJt. «ðguf mw^tht vh xwkfe mne fhJe.
(8) y:- xuLzh hsw fh<tk vnujt Ftm fhelu xuLzhbtk œNtoJuj mwaltytulwk vtjl fhJtbtk ytÔgw
lrn ntug <tu xuLzh ybtLg dKJtbkt ytJNu <ule ltuk^ juJt rJlk<e Au. J¤e yt Vtubolwk
bwFv]ƒ ylu ftuLx[tfxhtult btdoœNol btxu mtbtLg rlgbtu ylu mwaltytu vK
ft¤SvwJof JtkaJt rJlk<e Au.
(1) ftuEvK fthK œNtoÔgt rmJtg ftuEvK fu c^t xuLzhtu yMJefthJtltu n¬ yctr^< hnu
(h) xuLzhhu ctujvtuELx vullt c>ju NtneJt¤e vul&e Chujt xuLzhtu ðþkh< s ybtLg
c:- Wvhle ctc<tu Wvhtk< xuLzh leault mkstudtubtk <h< ybtLg XhJtlu vtºt &Nu.
(1) xuLzh Chlth, rlg< ftb y&Jt ftb btxu bkswh fhuj y&Jt CtJ vºtflt ftuR ftuz
y&Jt vîr< y&Jt rJd<tubtk bwfuj Nh< y&Jt mw^thtbtk ftuR VuhVth mwaJ<t ntug.
(h) xuLzhlwk ftuR vtlwk fu vtlt ftZe ltkÏgwk/ltkÏgt ntug fu cœÕGþ / cœÕgt ntug.
(3) c^t mw^tht J^tht y&Jt atukxtzuje ftvjeytu Wvh xuLzh Chlthu xwkfe mne l fhe ntug.
(4) xuLzhbtk <ubKu ftuR AufAtf fhe ntug, ylu
(5) xuLzh Chlth y&Jt vuZele ctc<btk œhuf Ctdeœth y&Jt <u ykdulwk bwFðgthltbwk
^htJlth Ôgrf< mne l fhu y&Jt xuLzhbt <u btxu htFJtbtk ytJuje søgtbtk
mne/mneytu Wvh ftuR mtûteyu mtF fhe l ntug.
f:- Nh<e xuLzh MJefthJtbtk ytJNu lne.
z:- xuLzh MJefthJw, hœ fhJw, ftulu ytvJw ylu fgt CtJ&e ytvJw <u ykdu Bgwrl.
frb§h©eltu rlKog ytFhe hnuNu. ftuR fthKmh stu ftuLx[tfxhlu ftb l ytve Nftg <tu
<u ykdu ftuLx[tfxh ftuRvK «fthltu lwfNtle fu J¤<hltu nff œtJtuu fhe NfNu lrn fu
ftgœtfeg ftgoJtne yt ykdu &R NfNu lrn. xuLzh bkswh >ltu y&o ftb ytve œuJtLþk
Au <uJtu &R NfNu lrn.Nh<e xuLzh MJefthJtbtk ytJNu lne.
(9) rJmkdr< ylu rnmtc stud:
Signature of Bidder
Ahmedabad Municipal Corporation
nt& ^hJtlt ftbtule ctc< œNtoJ<t CtJ vºtfbtklt sÚ&t ylu hfble
ftuRvK Cwjawf leault rlgbtu ylwmth mhCh fhJtbtk ytJNu.
(1) xuLzh Chlthu œhuf Ftltbtk sKtJuj Nçœtu ylu ytkfzt Jåau ftuR ymkdr<lt fumbtk
Nçœtuubtk sKtJuj hfb btLg htFJtbtk ytJNu.
(2) yufb œh ylu sÚ&tlt Ftuxt dwKtfthlt fthKu ftble ctc<tu œNtoJ<e CtJ vºtflt
Ftltbtk&e hfbbtk Cwj sKtg <tu yufb œh btLg htFJtbkt ytJNu ylu œhlt yt^thu
dwKtfth mw^thJtbkt ytJNu.
(3) yufblt Ftltbtk&e <ubs ytd¤ Fuka<t mhJt¤tle <btb Cwjtu mw^thJtbkt ytJNu.
(4) ctc<tu y&Jt mhJt¤t mtbu vwhu ytkfzu fhuj ftuR vK ctc< ægtlbtk juJtbtk ytJNu
(10) y:- ftbltu «tud{um mbgbgtoœt bwsc fhJtltu hnuNu. yt mbgbgotœt 10 jtF mw^elt ftb
btxu yuj.ytu.ytR. ytÃgt <theF&e 10 rœJm <&t 10 jtF &e Wvhltk ftb btxu
yuj.ytu.ytR. ytÃg <theF&e 15 rœJm&e NY &guj dKJtbt ytJNu. <&t <u œhBgtl
ftble 3% juFu zevtuÍex Che fhthvºt fhJtltu hnuNu.
xuLzhbtk ftuLx[t¾xh îtht Chujt CtJ <btb «fthlt su <u «J<o<t mhfthe xuût
mrn<lt CtJ dKJtbtk ytJNu. ylu <ubtk atjw ftb œhBgtl su ftuR VuhVth &Nu <ultu
J^thtu awfJJtbtk ytJNu lrnk.
c:- mûtb m•tt îtht Yt.10,00,000.00 (œm jtF) mw^elt xuLzhle bkswheltu XhtJ
vtzgt ctœ (LOI) ytvJtbtk ytJNu ðgth ctœ rœl - 10 btk rm¾gtuhexe zevtuÍex sbt
fhtJJtle hnuNu. rm¾gtuhexe zevtuÍex btuze ChJtlt rfMmtbtk Bgwrl.ftuvtuohuNlbtk
«Joðbtl rlgb ylwmth ftgoJtne fhJtbtk ytJNu.
f:- bkswh &guj xuLzhle mbgbgtoœtbtk ftbdehe vqKo l &tg <tu bubtuhuLzb (ltuxem
RLJtRxuz xuLzh) btk sKtJuj «btKu bkswh &guj mbgbgtoœt ctœlt FhuFh ctfe
ftble hfblt bn•tb 10% juFu (je¾Jezexe zubuSm) vulÕxe Jmwj fhJtbtk ytJNu.
(11) y:- awfJKe:-
xuLzh Chlthu yu Jt< mbS juJtle hnuNu fu <uKu xtkfujt œh vwhtk &gujt ftb btxult Au
ylu <ubtk bswhe, vtjF, ÃjtLx, œuFhuF, mhJem-ftbdehe, Jes¤e, htugÕxe ylu
ytufx[tug Jduhu ykNu <btb Faoltu <&t sYh sKtg <tu ylu ðgthu ht<vt¤elt ftblu
juJt c^t J^thtlt Faoltu mbtJuN &Nu ylu xtkfujt CtJ fu œh fh<t J^thtle ftuR
awfJKe ykdult <ublt ftuR œtJt ægtlbtk juJtNu lnek ylu xuLzh Chlth Ftuxe
hswyt<lu fthKu y&Jt ftuR Ôgrf<yu (vAe<u ctk^ftb rJCtdltu fboathe ntug fu l
ntug) <ublu ytvuje btne<elu yt^thu vtA¤&e ftuR œtJt hsw fhJt nfœth hnuNu lnek.
<ublw xuLzh ChJt <&t <ubtk swœt swœt CtJ ylu œh ChJt btxu sYhe yuJe <btb
btne<e vtu<tlt vûtu l bu¤Je NfJtlu fthKu vtu<u xuLzh hsw fhJtlu je^u y&Jt <ubtk&e
WCt &<t ftuR stuFb fu sJtcœthebtk&e Axfe NfNu lnek. mœh ftbbtk ftuR vK ò<lt
ctk^ftblt bxehegj Wvh CtJ J^thtu ytvJtbtk ytJNu lrnk.
Signature of Bidder
Ahmedabad Municipal Corporation
c:- ftuLx[tfxhtulu vubuLx / hlekd cej Bgwrl. frb§h©elt su <u «J<obtl rlgb bwsc
fhJtbt ytJNu. <&t Bgwrl. frb§h©e/mexe Rsluh©e lt su <u JF<ltk mh¾gwjh
«btKu ftbdehe/ybj fhJt rcl Nh<e ckDlf<ot hnuNu.
f:- ftuLx[t¾xhlt œhuf hlekd cejbtk&e ftuLx[t¾xhlu awfJJtle &<e fwj hfb Wvh (xuLzh
bwsclwk vubuLx + yu¾x[t ytRxb) 2 % juFu hexulNl ble ftvJtbtk ytJNu su VtRlj
cejbtk vh< ytvJtbtk ytJNu.
z:- htsg / fuL÷ mhfth©elt JF<tuJF<lt ftgœt bwsc su ftuR hfble fvt< fhJtle &Nu
<u bwsc ftuLx[tfxhlt cejbtk&e fvt< fhJtbt ytJNu.
(12) yu:- fhth mkc^e œM<tJustu fhthlt ydðglt Ctd dKtNu ylu <u mD¤t mne<lt fhth
mbd{ ftblu jtdw vzNu.
ce:- xuLzhbtk œNtoJuj ftb mkck^e œM<tJusbtk œNtoJuj rJd<btk rJmkd<<tlt rfMmtbtk leau
œNotJuj ¢btlwmth œM<tJusbtk œNtoJuj rJd< d{tng htFJtbkt ytJNu.fhth mkc^e
œM<tJustu fhthlt ydðglt Ctd dKtNu ylu <u mD¤t mne<lt fhth mbd{ ftblu
(yu) yufb ylu fœ:-
(2) xuLzh VtuboLþk CtJvºtf
(3) MvuNeVefuNl
z[tu#dbtk fœ, ytfth, ytkfzt fœta Ftuxt ntug <tu btvujt fœ, ytfthlu yLþmhÔþk
(2) xuLzh Vtubole yLþMþra-ce
(3) MvuNeVefuNl
Cwj Chujt fu Ftuxt JKollt rfMmtbtk yt mkck^e Wvhefûttyu rJmkd<<t ykdule
ltuk^ bwfe yuze.mexe yuLSlegh / zu.BGþrl.frbNlh©ele bkswhe bu¤JJtbtk ytJNu ylu
<u bwsc fhJtbkt ytJuj rlKog ykr<b dKJtbkt ytJNu.
(13) xuLzhhu z[tuRkd fu MvuNeVefuNlbtk hnuje ftuR ûtr< fu Ftbeltu duhjtC juJtle fturNN l
fhJe ylu Rsluh Rlatsuo Ãjtl <&t MvuNeVefuNlle ûtr<ytu mw^thJe <&t <ulwk mtawk
y&oDxl fhtJJwk.
(14) yt Wvhtk< y.Bgw. ftuvtuo. lt slhj ftuLx[tfx fLzeNl vK btLg htFJle hnuNu.
(15) yufe JF<u yuf fh<t J^w søgtytuyu ftb NY fhJtltu Jfo ytuzoh b¤u <tu ftb yuf mt&u
s c^u NY fhJw vzNu.
(16) atjw ftbu mrJom jtRllu lwfNtl l &tg <u he<u ftb fhJtlw hnuNu. stu ftuR mrJom
jtRllu lwfNtl &Nu <tu <ule mkvwKo sJtcœthe (òlbtj) ftuLx[tfxhle vtu<tle hnuNu.
mtRx Wvh ftb œhBgtl bswhtu fu sl<tlt ftuR btKmlt òlbtj lu lwfNtl &tg <ule
Signature of Bidder
Ahmedabad Municipal Corporation
sJtcœthe ftuLx[tfxhle hnuNu. vtujem Vrhgtœ &tg <tu <ule sJtc>the vK ftuLxtfxhle
hnuNu. CuFz Dme l vzu <ule sJtc>the vK vtujem Vrhgtœbt ftuLx[tfxhle hnuNu.
CuFz Dme l vzu <u btxu mjtb<elt vdjt (suJt fu œtuhzwk ctk^e bswh Ftztbtk W<thJt,
mtuhekd ylu Mx[xekd fhJt rJduhu) je^t Jdh bsqhlu Ftztbtk W<thNu <tu ftuLx[tfxh s
vtujem Vrhgtœbt sJtcœth hnuNu ylu Bgwrl.ftuvtuohuNlltu ftuRvK MxtV ytlt btxu
sJtcœth hnuNu lrn. ytxjwk mbSlu s xuLzh ChJwk. œhuf ftb fh<t bswhtultu rJbtu
vK W<thujtu ntuJtu stuRyu.
(17) bxehegÕm fu ceò xuMxed hevtuxo ftuLx[tfxhu vtu<tlt Fauo ftuvtuohuNl sKtJu <u søgtyu
fhtJJtlt hnuNu. bxehegÕm jtJJt fu jR sJtltu mkvwKo Fao ftuLx[tfxhu CtudJJtltu
hnuNu.<&t atjw ftb œhBgtl yuLSlegh Rlatso îtht ybœtJtœ Bgwrlmevj
ftuvtuohuNlle buxjzuvtu jucbtk xuMxekd fhtJJt sKtJJtbtk ytJu <tu ftuLx[t¾xh îtht <ulw
vtjl fhJtlw hnuNu.
(18) M&¤ vrhrM&r< / sYhegt< bwsc ftb fhtJ<t xuLzhlt ytRxblt sÚ&tbtk J^ ^x &tg
<tu rlgb ylwmth <u ykdu ftb fhJt ftuLx[tfxh ck^tgujt Au.
(19) mtRx vh jtJJtbtk ytJuj btj mtbtl hesufx fhJtbt ytJu <tu <whk< rœl 1btk vh<
jR sJtltu hnuNu. yLg&t <ule lwfNtlle sJtc>the ftuLx[tfxhle hnuNu.
(20) ftuLx[tfxhlu su ftuLx[tfx ytvJtbtk ytJu Au. <ubt mhfth©elt «Joðbtl rlgb bwsc
ve.yuV/juch yufx <&t bswhtu <&t MxtVle Jebt vtujeme jElu <ult ftgœtlw vtjl
fhJtlwk hnuNu <&t yt ykdu Bgwrl.ftuvtuohuNl îtht su btne<e btkdJtbtk ytJu <u
ytvJtle hnuNu. bu.BGþrl.frbNlh©elt mh¾âwjh Bþsc sYhe ctknu^he vºtf
ytvJtLþk hnuNu.
(21) ftuRvK ftgœtfeg jexeduNl ybœJtœ Nnuhle ftuxobt hnuNu.
(22) btj su <u Mxtumo Wvh y&Jt mtRx Wvh jtuftulu lz<h l &tg <u he<u mwalt bwsc
W<thJtltu <ubs dtuXJJtltu hnuNu.
(23) ftuR vK mhfthe fhJuht ChJtle <btb sJtcœthe ftuLx[tfxhle hnuNu.
(24) ftuLx[tfxh îtht xuLzhbt œNtoJuj MveNeVefuNl bwsc MxtLzzo bxehegÕm MvuNeVefuNl
bwsc jtJJtlt hnuNu.<&t xuMxekd fhtJJtlwk hnuNu.<&t y ykdu «Joðbtl
Bgwrl.ftuvtuohuNlt rlgbtulw vtjl fhJtlw hnuNu.
(25) yt xuLzhbtk stu ftuR ytRxb hne dR ntug <tu <u y&Jt M&¤ M&e<e bwsc xuLzhbtk
mbtJuN l ntug <uJe J^thtle ftbdehe fhJtle &tg <uJt rfMmbtk Bgwrl.ftuvtuohuNlt
«Joðbtl rlgb ylwmth J^thtle ytRxblt CtJ lffe fhJtbtk ytJNu ylu <u bwsc
awkfJKe fhJtbtk ytJNu.
(26) atjw ftb œhBgtl «tuxufNlle mkvwKo sJtcœthe ftuLx[tfxhle hnuNu. subtk vevzt, œtuhzt
Cgmwaf ctuzo, ÃjtMxef vèe, rJ. ftuLx[tfxhu jtJJtlwk ylu mtaJJtlwk hnuNu. ylu
ftuRvK yfMbt< &Nu <tu <ule mkvwKo sJtc>the ftuLx[tfxhle hnuNu.
Signature of Bidder
Ahmedabad Municipal Corporation
(27) M&¤ Wvh atjw ftbdehe œhBgtl ftb fhlth ftuLx[tfxhlt bswh / fboathe y&Jt yLg
Ôgrf<lt yfMbt<lt rfMmbtk juch yufx bwsc fhJtle &<e ftgoJtne <&t vtujem
ftgoJtnele sJtc>the ftuLx[tfxhle hnuNu.
(28) stu MxtV mqalt ytvu <u bwsc mwalt vtu&e ftuLx[tfxhu htFJtle hnuNu. <ubtk œhhtus
fhuj ftbdehe <&t yr^ftheytuyu ftb mw^thJt fu «tud{um J^thJtlt ltuk^ fhuj ntug <tu
<ulwk ftuBÃjtgLm ytvJtlwk hnuNu ytJe ltu^lt sJtc l &gu fu <u «btKu M&¤ Wvh ybj
l &gu ftuLx[tfxhlu vulÕxe fhJtle m•tt yuze.mexe yuLSlehgh©elu hnuNu.
(29) œhuf ytRxblt MvuNeVefuNl ybœtJtœ Bgwrlrmvj ftuvtuohuNlltk bkswh &guj <&t
btLg htFuj MvuNeVefuNl Nh<tu bwsc hnuNu su ytRxbbtk MvuNeVefuNl l ntug <uJt
mkstudtubtk yuze.mexe.yuLSlegh©eltu rlKog ytFhe hnuNu.Jtuxhekd fhJtbtk lrn ytJu
fu œhhtus J^thtltu zucheÍ WvtzJtbtk lrn ytJu <tu ftuLx[tfxhlt Fauo ylu sutFbu Jdh
ltuxemu Jtuxhekd fhtJJtbtk <&t zucheÍ WvtzJtbtk ytJNu ylu cejbtk&e hfb ftve
(30) juch JuÕVuh Vkz btxu ntjbtk htsg mhfth©eyu fhuj nwfb bwscle hfb cejbtk&e
ftve juJtbtk ytJNu.
(31) atubtmtltu vehegz <t.15 swl &e 14 ytufxtuch Mþ^eltu dKJtbtk ytJNu. yt mbg
œhBgtl ftuLx[tfxh îtht ftbdehe fhe Nftg <ub l ntug <tu <u Bþscle xtEb jebex
J^the ytvJtbtk ytJNu.
(32) muÕm xuût / Jux lkch / ve.yuV. ftuz lkch / vtl lkch / S.yum.xe. lkch rJduhu
ftuLx[t¾xhu VhSgt< ytvJtlt hnuNu.
(33) ltbœth ftuxo îtht fhuj nwfb <ubs rlœuo»ttulwk awM<vKu vtjl fhJtlwk hnuNu. subtk z[ulus lu
jd<tk ftb btk ftuRvK mkkstudtubtk bNel ntuj / dxh btk btKmlu W<thJtu lnek <ubs
buLgwyj M¾{uJSkd ykdule btdoœrNoft lwk vtjl fhJwk.
(34) mœh xuLzhle ytRxbtult CtJtu ltKt Ft<t lt mhfgwjh lk.38, <t.21/11/22 <&t mûtb m•ttle b¤uj bkswhe
bwsc GST rmJtg dKºtebtk juJtbt ytJuj <&t «J<obtl rlgb bwsc GST awfJJt vtºt &Nu <&t juJtbtk ytJuj
ctfe CtJtu J»to 2023-24 lt S.yum.xe meJtglt yth. yuLz ce. zeJeÍllt hux su Bgwrl. ftuvtuohuNlbtk bkswh
&guj <u bwsc juJtbtk ytJuj Au. su&e <btb cezmuo <u bwsc dK<he fhe xuLzhtu ChJtlt hnuNu.
(35) mœh xuLzh yk<do<lt ftb mkjøl y.Bgw.ftu.btk v{J<obtl <btb rlgbtu/mh¾gwjhtu jtdw vzNu <ubs JF<tu JF<
<h mw^thtytu vK jtdw vzNu. sule ltuk^ jR xuLzhtu ChJtlt hnuNu.
Signature of Bidder
Ahmedabad Municipal Corporation
yufhthlwk Vtubo
(1) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt xuLzh hsw fh<tk vnujtk buk/ybu
M&¤le bwjtft< je^e Au ylu ftblu jd<t btjmtbtl, bswhe ylu ceS
ctc<tulu jd<e M&trlf vrhrM&r<le ò<-btne<e bu¤Je Au.
(2) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt ftuLx[tfxhtule Nh<tu rJd<tu ylu
xuLzhlu jd<t >M<tJustu ft¤SvwJof yÇgtm fgtuo Au ylu <u bwsc <ultu ybj
fhJt mkb< Awk/Aeyu.
ftuLx[tfxhle mne ylu rmfft
Signature of Bidder
Ahmedabad Municipal Corporation
TECHNICAL SPECIFICATIONS:
Item no.01 Excavation for foundation upto 1.5 m depth including sorting out and stacking of
useful materials and disposing off the excavated stuff upto 50 Meter lead. (A)
Loose or soft soil
0 to 1.5 meter depth.
Any soil which generally yields to the application of pickaxes and shovels, spades, rakes or any
such ordinary excavating implement or organic soil, gravel, silt, sand turf loam, clay, peat etc. falls
under this category. For materials and workmanship for earthwork and excavation, relevant
specification IS: 3764 & IS 1200 (Part I) shall be followed.
The depth of the excavation shall be as per the item description.
Clearing the Site:
The site where the Development has to be carried out shall be cleared and all
obstructions, loose stones, materials and rubbish of all kind, bush; wood and all type
trees shall be removed, as directed.
The materials so obtained shall be the property of the Client and shall be conveyed and
stacked as directed, within 50-m. lead. The roots of the trees coming in the sides of the
trenches shall be cut and coated with hot Bitumen.
All types of trees, woods etc. which requires prior permission of Govt./ Forest Authority
/ Municipal Commissioner, before cutting shall be cut after obtaining such permission
from them. It shall be the Client's responsibility to obtain such permission from the
respective authorities.
The rate of site clearance is deemed to be included in the rate of earthwork, for which
no extra will be paid.
After cleaning the site, the centerline of the central verge & other constructions will be
given by the Engineer-in-charge. The Contractor shall assume full responsibility for
alignment, elevation and dimension of each and all parts of the work. Contractor shall
supply labours, materials, etc. required for setting out the reference marks and bench
marks made of MS angle iron and embedded in 1:2:4 CC.
They shall maintain the same as long as required and directed.
The excavation shall be carried out in true line and level and shall have the width and
depth, as shown in the drawings or as directed. The Contractor shall do the necessary
shoring and strutting or shall provide necessary slopes to a safe angle or steps, as
required or directed, at his own cost. No extra payment shall be made for such
precautionary measures, taken. The bottom of the excavated area shall be leveled both
longitudinally and transversely, as directed, by removing excess soil and watering, as
required. No earth filling will be allowed for bringing it to level, if by mistake or any
other reason, excavation is made deeper or wider than shown on the drawings or as
directed. The extra depth or width shall be made up with sand filling, as specified for
Signature of Bidder
Ahmedabad Municipal Corporation
the bottom level of the subsequent finishing at the cost of the Contractor or as directed
by Engineer-In-Charge.
The Contractor shall at his own expense and without extra charge make provision of
supporting all utility services, lighting the excavated areas, separating and stacking
serviceable materials neatly,shoring, timbering, strutting, bailing out water either sub-
soil or rainwater, including pumping at any stage of the work. Excavated areas shall be
kept free of water while masonry or concrete or relevant base works are in progress and
till the Engineer-in-charge considers it necessary.
Disposal of the Excavated Stuff:
The excavated stuff of the selected type shall be used in filling the excavated areas
wherever required inlayers, including ramming and watering, ensuring proper
compaction etc. complete.
The Contractor shall remove the balance of the excavated quantity from the site of
work, to a place, as directed and for all lift.
The lead is the shortest practical route and not necessarily the route actually taken. The
decision of Engineer-In-charge shall be final in this regard.
Mode of Measurement and Payment:
The measurement of excavation of excavated area shall be made according to the
sections shown on the drawing or as per sections given by the Engineer-in-charge. No
payment shall be made for surplus excavation made in excess of above requirements or
due to stepping and sloping back as found necessary, on account of conditions of soil
and requirements of safety.
The rate shall include for clearing the site, surface dressing, making layout for road,
fixing permanent grid points with MS iron posts, embedded in C.C. 1:2:4, placed
sufficiently away from the existing traffic lines and establishing bench marks etc.
The rates shall include for necessary shoring, timbering and strutting for protection of
sides of the excavated area, pumping out rain or surface water at any stage of
construction so as to keep the excavated area dry, to the satisfaction of the /Engineer-
The rate shall include leveling and ramming the bottoms of excavations to receive
concrete, etc. including trimming to slope wherever necessary etc. complete.
In filling clods bigger than 50 mm shall not be allowed. Only consolidated
measurements of filling shall be paid. Consolidation to be done by mechanical
compactor as per relevant item.
Item No.02 Providing and laying cement concrete 1:4:8 (1- Cement:4- coarse sand:8- hand
broken stone aggregate 40 mm nominal size) and curing complete excluding cost of
form work in (A) Foundation and plinth.
1.1 Water shall conform to M-1, Cement shall conform to M-3. Sand shall conform to M-6.
Stone aggregate 40 mm. Nominal size shall conform to M-12.
Signature of Bidder
Ahmedabad Municipal Corporation
2.0 Workmanship :
2.1 The relevant specification of item No 5.3.2.
2.2 (A) shall be followed for the work except that the work is to be carried out in cement
concrete 1:5:10.
3.0 Mode of measurement and payment :
3.1 The concrete shall be measured for its length, breadth and depth. Limiting dimensions to
those specified on plans or as directed.
The rate shall be for a unit of one cubic meter.
Item No.03 Brickwork using common burnt clay building bricks having crushing strength not
less than 35kg./Sq.Cm. In foundation and plinth in Cement Mortar 1:6. (1-Cement:
(A) Conventional.
Foundation Masonary:
Providing and laying Brick work using common burnt clay building bricks having crushing
strength not less than 35 kg/Sq. cm. in foundations and plinth in cement mortar 1: 6 (1
cement : 6 fine sand). This includes pointing, curing, scaffolding, etc. complete
Water shall conform to M-1 Cement shall conform to M-3 Sand shall conform to M-6. Brick
shall conform to M-15 Cement mortar shall conform to M-11.
The proportion of the cement mortar shall be 1:6 (1 cement : 6 fine sand) by volume.
Wetting of bricks:
The bricks required for masonry shall be thoroughly wetted with clean water for about two
hours before use or as directed. The cessation of bubbles, when the bricks are wetted with
water is an indication of through wetting of bricks.
Bricks shall be laid in English bond unless directed otherwise.
Half or cut bricks shall not be used except when necessary to complete to bond; closer in
such case shall be cut to required size and used near the ends of walls. A layer of mortar
shall be spread on full width for suitable length of the lower course. Each brick shall first be
properly bedded and set home by gently tapping with handle of trowel or wooden mallet.
It side face shall be flushed with mortar before the next brick is laid and pressed against it.
On completion of course, the vertical joints shall be fully filled form the top with mortar.
The walls shall be taken up truly in plumb. All courses shall be laid truly horizontal and all
vertical joint shall be truly vertical. Vertical joints in alternate course shall generally be
directly one over the other.
The thickness of brick course shall be kept uniform. The brick shall be laid with frog
upwards. A set of tools comprising of wooden straight edges, mason’s sprit level, square
half meter rub, and pins, string and plumb shall be kept on the site of work for frequent
checking during the progress of work.
Signature of Bidder
Ahmedabad Municipal Corporation
Both the faces of walls of thickness greater than 23 cms shall be kept in proper place. All
the connected brick work shall be kept not more than one meter over the rest of the work.
Where this is not possible, the work shall be raked back according to bond (and not left
toothed) at an angle not steeper than 45 degrees.
All fixtures, pipes, outlets of water, hold fasts of doors and windows etc. which are required
to be built in wall shall be embedded in cement mortar.
Bricks shall be so laid that all joints are quite flush with mortar. Thickness of joins shall not
exceed 12 mm. The face joints shall be raked out as directed by taking tools daily during the
progress of work, when the mortar is still green so as to provide key for plaster or pointing
The face of brick shall be cleaned the very day on which the brick work is laid and all mortar
dropping removed. Curing Green work shall be protected from rain suitably. Masonry work
shall be kept moist on all the faces for a period seven days. The top of masonry work shall
be kept well wetted at the close of the day.
Preparation of foundation bed:
If the foundation is to be laid directly on the excavated bed, the bed shall be leveled,
cleared of all loose materials, cleaned and wetted before starting masonry. If masonry is to
be laid on concrete footing, the top of concrete shall be cleaned and moistened.
The contractor shall obtain the engineer'’ approval for the foundation bed, before
foundation masonry is started.
When puccas flooring is to be provided flush with the top to plinth, the inside plinth offset
hall be kept lower than the outside plinth top by the thickness of the flooring.
Mode of measurements and payment:
The measurements of this item shall be taken for the brick masonry fully completed in
foundation up to plinth.
The limiting dimensions not exceeding those shown on the plans or as directed shall be
Battered, tapered and curved portions shall be measured net.
No deduction shall be made from the quantity of brick work nor any extra payment made
for embedding in masonry or making holes in respect of following items:
(1) Ends of joints, beams, posts, girders, rafters, purlins, trusses, corbel steps etc. where
cross sectional area does not exceed 500 Sq.cm.
(2) Opening not exceeding 1000 Sq.cm.
(3) Wall plates and bed plates, bearing of slabs, chhajas an the like whose thickness does
not exceed 10 Cms. and the bearing does not extend to the full thickness of wall.
(4) Drainage holes, and recesses for cement concrete blocks to embed hold fasts for doors,
(5) Iron fixtures, pipes up to 300 mm dia hold fasts and doors and windows built into
masonry and pipes etc. for concealed wiring.
(6) Forming chases of section not exceeding 350 Sq. Cm. in masonry.
Apertures for fire places shall not be deducted nor shall extra labour required to make
splaying of jambs, throating and making Arches over the aperture be paid for separately.
Signature of Bidder
Ahmedabad Municipal Corporation
The rate shall be for a unit of one cubic meter.
Above Plinth Masonary:
Providing and laying Brick work using common burnt clay building bricks having crushing
strength not less than 35 kg/Sq. cm. in cement mortar 1: 6 (1 cement : 6 fine sand) for
superstructure upto floor three level height. This includes pointing, curing, necessary
scaffolding, tools, etc. complete.
Bricks shall conform to M-15. Cement mortar shall conform M-11.
The relevant specifications of item No. 13 shall be followed except that the masonry work
shall be carried out above plinth level to floor two level i.e. for ground floor.
The frames of doors, windows, cupboards, etc. shall be housed into the brick work at the
correct location and level as directed.
The heavy steel doors, window frames etc. shall be built in with brick work but for ordinary
steel doors and windows required opening for frames, hold fasts etc. shall be left in the wall
and frames embedded later on in order to avoid damage to the frames.
Necessary scaffolding shall be provided. The supports of the scaffolding shall be sound and
strong tied together with horizontal pieces over which the scaffolding planks shall be fixed.
Simple scaffolding shall be allowed normally. In this case scaffolding hole shall rest in hold
header horizontal coarse only.
Minimum number of holes shall be left in brick work for supporting horizontal scaffolding
holes. The contractor is responsible for providing and maintaining sufficiently strong
scaffolding so as to withstand all loads likely to come upon it.
For the face of brick work where plastering is to be done joints shall be racked out to a
depth not less than thickness of joints.
The face of brick work shall be cleaned and mortar dropping removed on very same day
that brick work is laid.
Mode of measurement:
The masonry work of G. F. i.e. above plinth level to floor two level shall be measured and
paid under this item.
Brick work in parapet shall be included in the corresponding masonry item of store
immediately below the floor above which the parapet is built. No deduction shall be made
from quantity of brick work.
No extra payment shall be made for embedding in masonry or making holes in respect of
following items:
(1) Ends of joints, beams, posts, girders, rafters, purlins, trusses, corbel steps etc. where
cross sectional area does not exceed 500 Sq.cm.
(2) Opening not exceeding 1000 Sq.cm.
Signature of Bidder
Ahmedabad Municipal Corporation
(3) Wall plates and bed plates, bearing of slabs, chhajas an the like whose thickness does
not exceed 10 Cms. and the bearing does not extend to the full thickness of wall.
(4) Drainage holes, and recesses for cement concrete blocks to embed hold fasts for doors,
(5) Iron fixtures, pipes up to 300 mm dia hold fasts and doors and windows built into
masonry and pipes etc. for concealed wiring.
(6) Forming chases of section not exceeding 350 Sq. Cm. in masonry.
Apertures for fire places shall not be deducted nor shall extra labour required to make
splaying of jambs, throating and making Arches over the aperture be paid for separately.
M/s. shall be on CMT basis.
Item no.04 Extra Rate for brickwork in Above Item for super structure above plinth level upto
floor two level.
As per Item and instructed by engineer incharge.
Payment shall be done in Cmt. basis.
Item no.05 Providing and Laying ordinary cement concrete 1:2:4 (1-Cement: 2-coarse sand: 4-
graded stone aggregates 20 mm nominal size) and finishing smooth with curing etc.
complete including the cost of form work but excluding the cost of reinforsement
for R.C.C work in (iv) Slabs having more than 13 cm and upto 15 cm.thickness.
1.0 Materials :
1.1 Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-
6. Grit shall conform to M-8. Coarse aggregate shall conform M -12 B.
2.1 The relevant specifications of item no. 5.4.1 of ordinary concrete shall be followed
except that the concrete mix shall be designed from preliminary tests, the
proportioning of cement and aggregates shall be done by weight and necessary
precautions shall be taken in the production to ensure that the required work cube
strength is attained and maintained. The controlled concrete shall be in grades of M-
100, M-150, M-200, M-250, M-300, M-350, M-400, with prefix controlled added to it.
The letter ‘M’ refers to mix and numbers specify 28 days works cube compressive
strength of 150 mm cubes of the mix expressed in Kg. / Cmt.
2.2 The porportion of cement, sand and coarse aggregates shall be determined by
weight. the weight batch machine shall be used for maintaining proper control over
the porportion of aggregates as per mix design.
The strength requirements of different grades of concrete shall be as under:
Compressive strength of 15 cms 28 cubes in Kg./Cmt. at with
days conducted in accordance I.S. 516-1959
Preliminary test Work test Min Min.
Signature of Bidder
Ahmedabad Municipal Corporation
In all cases, the 28 days compressive strength specified in above table above be the
criteria for acceptance or rejection of the concrete.
Where the strength of a concrete mix as indicated by tests, lies in between the
strength of any two grades specified in the above table such concrete shall be
classified in for all purposes as concrete belonging to the lower of the two grades
between which its strength lies.
2.3 The proportions for ingredients chosen shall be such that concrete has adequate
workability for conditions prevailing on the work in question and can be properly
compacted with means available except where it can be shown to the satisfaction of
the Engineer-in-charge, that the supply of properly graded aggregate of uniform
quality can be maintained till the completion of work. Grading of aggregate shall be
controlled by obtaining the coarse aggregates, in different sizes and being in them in
the right proportions as required. Aggregate of different sizes shall be stocked in
separate stock piles. The required quantity of material shall be stock piled several
hours, preferably a day before use. The grading of coarse and fine aggregate shall be
checked as frequently as possible, the frequency for a given job being determined by
the Engineer-in-charge to ensure that the suppliers are maintaining the uniform
grading as approved for samples used in the preliminary tests.
2.4 In proportioning concrete, the quantity of both cement and aggregate shall be
determined by weight. Where the weight of cement is determined by accepting the
maker’s weight per bag a reasonable number of bags shall be weighted separately to
check the net weight. Water shall either be measured by volume in calibrated tanks
or weighed. All measuring equipments shall be maintained in clean and serviceable
condition. Their accuracy shall be periodically checked.
2.5 In is most important to keep the specified water cement ratio constant and at its
correct value. To this end, moisture content in both fine and coarse aggregates shall
be determined by the Engineer-in-charge, according to the weather conditions. The
amount of mixing water shall then be adjusted to compensate for variations in the
moisture content. For the determination of moisture content in the aggregates, I.S.
2389 (Part III) shall be referred to. Suitable adjustments shall also be made in the
weights of aggregates due to variation in their moisture content. Minimum quantity
of cement to be used in concrete shall not be less than 220 Kg/m3 in plain concrete
and not less than 250 Kg/m3 in reinforced concrete.
3.0 Cleaning & Treatment of forms:
3.0.1 All rubbish, particularly chippings shaving and saw dust shall be removed from the
interior of the form before the concrete is placed and the form work in contact with
concrete shall be cleaned and thoroughly wetted or treated. The surface shall be
then coated with soap solution applied before concreting is done. Soap solution for
Signature of Bidder
Ahmedabad Municipal Corporation
the purpose shall be prepared by dissolving yellow soap in water to get consistency
of paint. Alternatively a coat of raw linseed oil or form oil of approved manufacture
may be applied in case steel shuttering is used. Soap solution or raw linseed oil shall
be applied after thoroughly cleaning the surface. Care shall be taken that the coating
does not get on construction joint surface and reinforcement bars.
3.1 Stripping time:
3.1.1 In normal circumstances and where ordinary cement is used forms may be struck
after expiry of following periods:
(a) Sides of walls columns and vertical faces of beam 24 to 48 hours.
(b) Beams soffits (Props left under) 7 days.
(c) Removal of props slabs
(i) Slabs spanning up to 4.5 m – 7 days (ii) Spanning over 4.5 mm 14 days
(d) Removal of props to beams and arches
(i) Spanning up to 6 m – 14 days (ii) Spanning over 6 m 21 days
3.2 Procedure when removing the formwork:
3.2.1 All formwork shall be removed without such shock or vibration as would damage the
reinforced concrete surface. Before the soffits formwork and struts are removed, the
soffits and the concrete surface shall be exposed where necessary in order to
ascertain that the concrete has sufficiently hardened.
3.3.1 The centering to be provided shall be got approved. It shall be sufficiently strong to
ensure absolute safely of the form work and concrete work before, during and after
pouring concrete. Watch should be kept to see that behavior of centering and form
work is satisfactory during concreting. Erection should also be such that it would
allow removal of forms in proper sequence without damaging either the concrete or
the forms to be removed.
3.3.2 The props of centering shall be provided on firm foundation or base of sufficient
strength to carry the loads without any settlement.
3.3.3 The centering and form work shall be inspected and approved by the Engineer- in-
charge before concreting. But this will not relieve the contractor of his responsibility
for strength, adequacy and safety of form work and centering. If there is a failure of
form work or centering, contractor shall be responsible for the damages to the work,
injury to life and damage to property.
3.4 Scaffolding:
3.4.1 All scaffolding, hoisting arrangements and ladders etc required for the facilitating of
concreting shall be provided and removed on completion work by contractor at his
own expense. The scaffolding, hoisting arrangements and ladders etc. shall be strong
enough to with stand all live, dead and impact loads expected to act and shall be
subject to the approval of the Engineer-in-charge. However, contractor shall be solely
responsible for the safety of the scaffolding, hoisting arrangement, ladders, work and
Signature of Bidder
Ahmedabad Municipal Corporation
3.4.2 The scaffolding hoisting arrangements and ladders shall allow easy approach to the
work spot and afford easy inspection.
3.4.3 The rate is applicable to all conditions of working and height up to 4 mts. The rate
shall include the cost ofmaterials and labour for various operations involved such as:
(a) Splayed edges, notching, allowance for overlaps and passing at angles, battens
centering, shuttering propping, bolting, nailing, wedging, easing, striking and
(b) Filleting to form stop chamfered edges or splayed external angles not exceeding
mm width to beams, columns and the like.
(c) Temporary openings in the forms for pouring concrete, if required, removing rubbish
(d) Dressing with oil to prevent adhesion of concrete with shuttering, and
(e) Raking or circular cutting.
3.5.1 Before reuse all forms shall be inspected by Engineer-in-charge and their suitability
ascertained. The forms shall be scarred, cleaned and joints gone over, repaired
where required. Inside surface shall be retreated to prevent adhesion of concrete.
4.0 Mode of measurement and payment:
The rate includes cost of form work. The rate excludes cost of reinforcement. The
rate shall be for a unit of one cubic meter.
Item No.06 Half brick masonry in common brunt clay building bricks having crushing strength
not less than 35 Kg/Sq.Cm. in Cement mortar 1:5 (1-Cement: 5-coarse sand) in
foundation and Plinth conventional brickwork (up to 10 ton)
Half Brick Masonary:
Providing and laying brick partition wall of 11.50 cms thick with good quality bricks of
the strength not less than 35 Kg / Sq. c.m. kiln burnt bricks laid in C.M. 1:4 ( 1-
Cement and 4-Coarse sand) including providing 5 cms thick cement concrete bed
1:3:6 ( 1-Cement : 3-Sand : 6-Grit size 6 mm to 10 mm) after every 8 layers of bricks
including racking out the joints, scaffolding, staging curing, etc. complete as per the
standard specifications in true line, level and plumb for super structure at any height
This includes pointing, curing, necessary scaffolding, tools etc. complete. Materials:
Brick shall conform to M-15. Water shall conform to M-1. Cement shall conform to
M 3. Sand shall conform to M-6. Cement mortar shall conform to M-11.
Relevant specifications of bricks, wetting and laying of bricks, joints, curing etc. shall
conform to item No 13 except the brick work of half bricks shall be carried out.
Cement mortar used in masonry work shall be in proportion of 1 part of cement and
4 part of sand by volume.
All bricks shall be laid strecher wise, breaking joints with those in the upper and
lower courses. The wall shall be taken truly plumb. All courses shall be laid truly
Signature of Bidder
Ahmedabad Municipal Corporation
horizontal and all vertical joints shall be truly vertical. The bricks shall be laid with
frogs upwards. A set of masons tools shall be maintained on work as required for
frequent checking.
Mode of measurement and payment:
The half brick masonry work in foundation and plinth shall be measured under this
item, the limiting dimensions shall not exceed those shown in the plan or as
directed. Any work done extra over the specified dimensions shall be ignored.
The length shall be measured nearest to one Cm. The rate shall be for a unit of Sqmt.
Item No.07 Extra for half brick masonry in super structure above plinth level upto floor two
(B) conventional
As per Item and instructed by engineer incharge.
Payment shall be done in Cmt. basis.
Item No.08 Providing formwork in ordinary timber planking so as to give a rough finish
including centering, shuttering, strutting and propping etc. height of propping and
centering below supporting floor to celling not exceeding 4m & removal of the
same for in situ reinforced or plain concrete work upto floor four level.
(A) Foundation, footings, bases of columns etc. and mass concrete.
(B) Flat surfaces such as soffits of supspened floors slabs Landings and the like. (1)
Floors etc. upto 200 mm in thickness.
The shuttering to be provided shall be of ordinary timber planks and shall conform to
M-26. The dimensions of scantlings and battens shall conform to the design. The
strength of the wood shall not be less than that assumed in the design.
(a) The form work shall conform to the shape lines and dimension as shown on the
plans and be so constructed as to remain sufficiently rigid during the placing and
compacting of the concrete. Adequate arrangements shall be made by the
contractor to safe guard against any settlement of the form work during the course
of concreting and after concreting. The form work of shuttering, centering,
scaffolding bracing etc shall be as per design.
Cleaning & Treatment of forms:
All rubbish, particularly chippings shaving and saw dust shall be removed from the
interior of the form before the concrete is placed and the form work in contact with
concrete shall be cleaned and thoroughly wetted or treated. The surface shall be
then coated with soap solution applied before concreting is done. Soap solution for
the purpose shall be prepared by dissolving yellow soap in water to get consistency
of paint. Alternatively a coat of raw linseed oil or form oil of approved manufacture
may be applied in case steel shuttering is used. Soap solution or raw linseed oil shall
be applied after thoroughly cleaning the surface. Care shall be taken that the coating
does not get on construction joint surface and reinforcement bars.
Stripping time:
In normal circumstances and where ordinary cement is used forms may be struck
after expiry of following periods:
(1) Sides of walls columns and vertical faces of beam 24 to 48 hours.
Signature of Bidder
Ahmedabad Municipal Corporation
(2) Beams soffits (Props left under) 7 days.
(3) Slabs spanning up to 4.5 m – 7 days (ii) Spanning over 4.5 m 14 days
(4) Removal of props slabs, beams and arches
Spanning up to 6 m – 14 days (ii) Spanning over 6 m 21 days
Procedure when removing the form work:
(b) All form work shall be removed without such shock or vibration as would damage
the reinforced concrete surface. Before the soffits form work and struts are
removed, the soffits and the concrete surface shall be exposed where necessary in
order to ascertain that the concrete has sufficiently hardened.
(c) The centering to be provided shall be got approved. It shall be sufficiently strong to
ensure absolute safely of the form work and concrete work before, during and after
pouring concrete. Watch should be kept to see that behavior of centering and form
work is satisfactory during concreting. Erection should also be such that it would
allow removal of forms in proper sequence without damaging either the concrete or
the forms to be removed.
(d) The props of centering shall be provided on firm foundation or base of sufficient
strength to carry the loads without any settlement.
(e) The centering and form work shall be inspected and approved by the Engineer-in-
charge before concreting. But this will not relieve the contractor of his responsibility
for strength, adequacy and safety of form work and centering. If there is a failure of
form work or centering, contractor shall be responsible for the damages to the
work, injury to life and damage to property.
(f) All scaffolding, hoisting arrangements and ladders etc required for the facilitating of
concreting shall be provided and removed on completion work by contractor at his
own expense. The scaffolding, hoisting arrangements and ladders etc. shall be
strong enough to with stand all live, dead and impact loads expected to act and shall
be subject to the approval of the Engineer-in-charge. However, contractor shall be
solely responsible for the safety of the scaffolding, hoisting arrangement, ladders,
work and workman etc.
(g) The scaffolding hoisting arrangements and ladders shall allow easy approach to the
work spot and afford easy inspection.
(h) The rate is applicable to all conditions of working and height up to 4 mts. The rate
shall include the cost of materials and labour for various operations involved such
(i) Splayed edges, notching, allowance for overlaps and passing at angles, battens
centering, shuttering propping, bolting, nailing, wedging, easing, striking and
(j) Filleting to form stop chamfered edges or splayed external angles not exceeding
mm width to beams, columns and the like.
(k) Temporary openings in the forms for pouring concrete, if required, removing
(l) Dressing with oil to prevent adhesion of concrete with shuttering, and
(m) Raking or circular cutting.
(n) Before re-use all forms shall be inspected by Engineer-in-charge and their suitability
ascertained. The forms shall be scarred, cleaned, and joints gone over, repaired
where required. Inside surface shall be retreated to prevent adhesion of concrete.
Signature of Bidder
Ahmedabad Municipal Corporation
Mode of measurements & payment:
(o) Form work shall be measured as the area in square meters of shuttering in contract
with concrete except in the case of inclined member and portion of curved profile
and upper side in which case only area of underside shall be measured for payment.
(p) Form work to secondary beams shall be measured up to the sides of main beams
but no deduction shall be made from the form work of the main beam at the inter
section point. No. deduction shall be made from the form work of a column at inter
section of beams.
(q) The rate is for the completed item.
The rate shall be for a unit of Smt. Basis.
Item No.09 Providing & fixing Steel door with Shutter for steel sheet 18 Gauge, and angel and
40 x 40 x 3 mm and steel doors frame of size 40 x 40 x 5 mm incl. anodised Iron
butt hinges and nece. fitting and fastening with necessary screws. Rate also incl.
two coats of oil paint etc comp. (N.S.)
This work includes p/f steel doors with shutters for steel sheet 18 gauge And
single of 40 X 40 x 3 mm and steel doors frame of size 40 X 40 x 7.5 incl.anodized iron
butt hinges and nece. fitting and fastening with nece. screws. Rate also incl. two coat
of oil paint etc. complete.
The rate shall be for a unit of Smt. Basis.
Item No.10 Providing and laying white glazed tiles 6 mm thick in flooring treads of steps and
landing laid on a bed of 12 mm thick cement mortar 1:3 (1-cement : 3-coarse sand )
finishing with flush pointing in white cement.
1.1. Water shall not be salty brackish and shall be clean, reasonably clear and free
objectionable quantities of silt and traces of oil and injurious alkalis, salts, organic
matter and other deleterious material which will either weaken the mortar of
concrete or cause efflorescence or attack the steel in R.C.C. Container for transport,
storage and handling of water shall be clean. Water shall conform to the standard
specified in I.S. 456-1978.
1.2. If required by the Engineer-in-Charge it shall be tested by comparison with
distilled water Comparison shall be made by means of standard cement tests for
soundness time of setting and mortar strength as specified in I.S. 269-1976. Any
indication of unsoundness charge in time of setting by 30 minutes or more or
decrease of more than 10 per cent in strength, of mortar prepared with water
sample when compared with the results obtained with mortar prepared with
distilled water shall be sufficient cause for rejection of water under test.
1.3. Water for curing mortar, concrete or masonry should not be too acidic or too
alkaline. It shall be free of elements which significantly affect the hydration reaction
or otherwise interfere with the hardening of mortar or concrete during curing or
those which produce objectionable stains or other unsightly deposits on concrete or
mortar surfaces
1.4. Hard and bitter water shall not be used for curing
1.5. Potable water will generally found suitable for curing mortar or concrete.
Signature of Bidder
Ahmedabad Municipal Corporation
3.1. Cement snail be ordinary Portland slag cement as per I.S.269-1976 or Portland
slag cement as per I.S. 455-1976
6.1. Sand shall be natural sand, clean, well graded hard strong, durable and gritty
particles free from injurious amounts of dust, clay kankar nodules, soft or flaky
particles shale, alkali salts organic matter, loam, mica or other deleterious
substances and shall be got approved from the Engineer-in-Charge. The sand shall
not contain more contain more than 8 percent of silt as determined by field test, if
necessary the sand shall be washed to make it clean.
6.2. Coarse Sand :
The fineness modulus of coarse sand shall not be less than 2.5 and shall not exceed
0. The sieve analysis of coarse shall be as under.
Sieve passing Percentage by
I.S. Designation weight
sieve weight passing
2.36 mm 90 to 100 300 micron 50 -
1.18 mm 70 to 100 150 micron 0 -
6.3. Fine Sand :
The fineness modulus shall not exceed 1.0 The sieve analysis of fine sand shall be as
Sieve passing Percentage by
I.S. Designation weight
sieve weight passing
2.36 mm 100 300 micron 5 -
1.18 mm 75 to 100 150 micron 0 -
11.2. Proportion of Mix
11.2.1. Cement and sand shall be mixed to specified proportion, sand being
measured by measuring boxes, the proportion of cement will be by volume on the
basis of 50 Kg/Bag of cement being equal to 0.0342 Cu.m. The mortar may be hand
mixed of machine mixed as directed.
11.3. Proportion of Mortar :
11.3.1. In hand mixed mortar, cement and sand in the specified proportions shall be
thoroughly mixed dry on a clean impervious platform by turning over at least 3 times
or more till a homogeneous mixture of uniform colour is obtained. Mixing platform
shall be so arranged that no deleterious extraneous material shall get mixed with
mortar or mortar shall flow out. While mixing, the water shall be gradually added
and thoroughly mixed to from a stiff plastic mass of uniform colour so that each
particle of sand shall be completely covered with a film of wet cement. The water
cement ratio shall be adopted as directed
11.3.2. The mortar so prepared shall be used within 30 minutes of adding water.
Only such quantity of mortar shall be prepared as can be used within 30 minutes
shall conform to M-11.
Signature of Bidder
Ahmedabad Municipal Corporation
White glazed tiles
1. The tiles shall be of best quality as approved by the Engineer-in-charge. They shall
be flat and true to shape They shall he fee from cracks, crazing sports chipper) edges
and corners. The glazing shall be of uniform shade.
2. The tiles shall be nominal size of 150 mm x 150 mm unless otherwise, specified.
The maximum variation the stated sizes other than the thickness of tile shall be plus
or minus 1.5 mm. The thickness of tile snail be 6 mm. Except as above the tiles shall
conform to I.S. 1977-19/0.
2.0. Workmanship
2.1.1. The sub grade shall be cleaned, wetted and mopped. The bedding shall then
be laid evenly over the surface tamped and corrected to desired level and allowed to
harden enough to offer a rigid cushion to tiles and to enable the monsoon to place
wooden planks across and squat on it.
2.1.2. The white glazed tiles shall be laid on cement mortar bedding of 12 mm. thick
in C.M. 1:3. The mortar shall have sufficient plasticity for laying and there shall be no
hard lumps that would interfere with the evenness of bedding. The base shall be
cleared and well wetted. The mortar shall then be spread in thickness not less than
10 mm. at any place and average 12 mm. thickness. The proportion of the cement
mortar shall be as specified in the item.
2.2. Fixing tiles :
2.2.1. The tiles before laying shall be soaked in water for at least tow hours. Neat
gray cement grout at 33 kg/Cement/Sq. mt. of honey like consistency shall be spread
over the mortar bedding as directed. The edges of the tiles shall be smeared with
neat cement slurry. The tiles shall be well pressed and gently tapped with a wooden
mallet till they are properly bedded and in level with the adjoining tiles. There shall
be. no hollows in bed or joints. The joints between the tiles shall be as thin as
possible in straight line or as per pattern.
2.2.2. The tiles shall not have staggered joints. The joints shall be true to centre line
both ways. The Nahni trap coming in the flooring shall be so positioned that its
grating shall replace only one tile as far as possible. Where full size tiles cannot be
fixed they shall be cut (Swan) to the required size and the edges rubbed smooth to
ensure straight and true joints. The joints shall be filled with grey cement grout with
wire brush or trowel to a depth of 5 mm. and loose material removed. White cement
shall be used for pointing the joints. After fixing the tiles finally in an even plane the
flooring shall be kept wet and allowed to nature undisturbed for 7 days.
2.3. Cleaning :
2.3.1. The surplus cement grout that may have come out of the joints shall be
cleaned off before it sets. Once the floor has set, it shall be carefully washed, cleared
by dilute acid and dried. Proper precautions and measures shall be taken to ensure
that the tiles are not damaged in any way till the completion of the .construction.
3.0. Mode of measurements & payment
3.1. The work done shall be measured in sq. mt. for visible area of work done. The
length and width of the flooring shall be measured not between the faces of skirting
or dedos or plastered face of wall as the case may be. The paving under dedo or
skirting shall not be measured. No deduction shall be made not extra paid for any
Signature of Bidder
Ahmedabad Municipal Corporation
opening in the floor of area-up to 0.1 sq.mt. Nothing extra shall be paid for laying the
floors at different levels in the same rooms.
3.2. The rate shall be for a unit of one sq. meter.
Item No.11 Providing and laying white glazed tiles 6 mm thick in skrting risers of steps and
dedo on 10 mm thick cement plaster 1:3 (1-cement : 3-coarse sand) and jointed
with white cement slurry.
1.1. Water shall not be salty brackish and shall be clean, reasonably clear and free
objectionable quantities of silt and traces of oil and injurious alkalis, salts, organic
matter and other deleterious material which will either weaken the mortar of
concrete or cause efflorescence or attack the steel in R.C.C. Container for transport,
storage and handling of water shall be clean. Water shall conform to the standard
specified in I.S. 456-1978.
1.2. If required by the Engineer-in-Charge it shall be tested by comparison with
distilled water Comparison shall be made by means of standard cement tests for
soundness time of setting and mortar strength as specified in I.S. 269-1976. Any
indication of unsoundness charge in time of setting by 30 minutes or more or
decrease of more than 10 per cent in strength, of mortar prepared with water
sample when compared with the results obtained with mortar prepared with
distilled water shall be sufficient cause for rejection of water under test.
1.3. Water for curing mortar, concrete or masonry should not be too acidic or too
alkaline. It shall be free of elements which significantly affect the hydration reaction
or otherwise interfere with the hardening of mortar or concrete during curing or
those which produce objectionable stains or other unsightly deposits on concrete or
mortar surfaces
1.4. Hard and bitter water shall not be used for curing
1.5. Potable water will generally found suitable for curing mortar or concrete.
3.1. Cement snail be ordinary Portland slag cement as per I.S.269-1976 or Portland
slag cement as per I.S. 455-1976
6.1. Sand shall be natural sand, clean, well graded hard strong, durable and gritty
particles free from injurious amounts of dust, clay kankar nodules, soft or flaky
particles shale, alkali salts organic matter, loam, mica or other deleterious
substances and shall be got approved from the Engineer-in-Charge. The sand shall
not contain more contain more than 8 percent of silt as determined by field test, if
necessary the sand shall be washed to make it clean.
6.2. Coarse Sand :
The fineness modulus of coarse sand shall not be less than 2.5 and shall not exceed
0. The sieve analysis of coarse shall be as under.
Sieve passing Percentage by
I.S. Designation weight
sieve weight passing
Signature of Bidder
Ahmedabad Municipal Corporation
2.36 mm 90 to 100 300 micron 50 -
1.18 mm 70 to 100 150 micron 0 -
6.3. Fine Sand :
The fineness modulus shall not exceed 1.0 The sieve analysis of fine sand shall be as
Sieve passing Percentage by
I.S. Designation weight
sieve weight passing
2.36 mm 100 300 micron 5 -
1.18 mm 75 to 100 150 micron 0 -
11.2. Proportion of Mix
11.2.1. Cement and sand shall be mixed to specified proportion, sand being
measured by measuring boxes, the proportion of cement will be by volume on the
basis of 50 Kg/Bag of cement being equal to 0.0342 Cu.m. The mortar may be hand
mixed of machine mixed as directed.
11.3. Proportion of Mortar :
11.3.1. In hand mixed mortar, cement and sand in the specified proportions shall be
thoroughly mixed dry on a clean impervious platform by turning over at least 3 times
or more till a homogeneous mixture of uniform colour is obtained. Mixing platform
shall be so arranged that no deleterious extraneous material shall get mixed with
mortar or mortar shall flow out. While mixing, the water shall be gradually added
and thoroughly mixed to from a stiff plastic mass of uniform colour so that each
particle of sand shall be completely covered with a film of wet cement. The water
cement ratio shall be adopted as directed
11.3.2. The mortar so prepared shall be used within 30 minutes of adding water.
Only such quantity of mortar shall be prepared as can be used within 30 minutes
shall conform to M-11.
White glazed tiles
1. The tiles shall be of best quality as approved by the Engineer-in-charge. They shall
be flat and true to shape They shall he fee from cracks, crazing sports chipper) edges
and corners. The glazing shall be of uniform shade.
2. The tiles shall be nominal size of 150 mm x 150 mm unless otherwise, specified.
The maximum variation the stated sizes other than the thickness of tile shall be plus
or minus 1.5 mm. The thickness of tile snail be 6 mm. Except as above the tiles shall
conform to I.S. 1977-19/0.
2.0. Workmanship
2.1. Preparation of Surface:
In case of brick masonry wall, the joints shall be raked out to a depth of least 15 mm.
while the masonry is being laid. In case of concrete wall the surface shall be chiseled
and roughed with wire brushes. The surface shall be cleaned and wetted thoroughly
before commencing the laying work.
2.2.1. The wall surface shall be covered with 10 mm. thick plaster of cement mortar
1:3 mix and allowed to harden. The plaster shall be roughened with wire brushes
Signature of Bidder
Ahmedabad Municipal Corporation
both way. The back of tiles shall be floated with grey cement slurry set and edges
with white cement slurry in bedding mortar. The tiles shall be gently tapped in
position on after the other keeping the joints as thin as possible. Top of skirting or
dedo shall be truly horizontal and the joints vertical or as per required pattern.
2.2.2. Risers of steps, skirting and dedo shall rest on top of treads or flooring. Where
full size tiles cannot be fixed, They shall be cut to the required size and the edges be
2.2.3. The joints shall be cleaned and flush pointed with white cement. The surface
shall be kept wet for seven days.
After curing the surface shall be washed clean.
3.0. Mode of measurements and payment
3.1. The rate shall include the cost of all materials and labour required for various
operations described above.
Risers of steps: skirting and dedo shall be measured in square meters, length and
height shall be measured along the finished face of the skirting or dedo including
curves, where special such as covers. internal and external angles, etc., used. The
length and height shall be measured correct lo the centimeter except in case of risers
and skirting where height shall be measured correct to 3 mm
3.2. The rate shall be for a unit of one sq. meter.
Item No.12 Providing and laying polished Kota stone slab flooring over 20 mm (Average) thick
base of cement mortar 1:6 (1-cement: 6-coarse sand) or L.M.1.1.5 (1-Lime putty:
1.5-coarse sand laid over and jointed with grey cement slurry mixed with pigment
to match the shade of slab including rubbing and polishing etc. complete. (A)
mm thick (upto 10 ton)
As per kota stone flooring specification Use kota stone of approved quality and
25mm thick stone in cement mortar 1:6 including all labour, tools, takel, equipment,
and curing etc complete.
The rate shall be for a unit of one sq. meter.
Item No.13 Providing and laying cement concrete flooring 1:2:4 (1-cement: 2-coarse sand: 4-
graded stone aggregate 20 mm nominal size) laid in one layer and finished with a
floating coat of neat cement. (A) 40 mm thick. (upto 10 ton)
Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-
6. Stone aggregate 20 mm. nominal size shall conform to M-12. Cement concrete of
1:2:4 proportion measured by volume shall conform to relevant specifications of
ordinary grade 1:2:4 concrete.
2.0. Workmanship
2.1. The cement concrete flooring of 40 mm thick (Average) is to be laid as per the
site condition. The concrete shall be mixed in a mechanical mixer at the work. Hand
mixing may however be allowed for smaller quantities of work and in case of failure
of machineries or as permitted by the Engineer-in-charge. It shall be carried out on a
water tight platform and care shall be taken to ensure that mixing is continued until
the mass is uniform in colour and consistency. However is such cases 10% more
cement than otherwise required shall have to be used without any extra cost. The
mechanical mixing shall be done for period of 1.1/2 to 2 minutes. The quantity of
water shall be just sufficient to produce a dense concrete of required workability for
Signature of Bidder
Ahmedabad Municipal Corporation
the purpose, Flooring or specified thickness shall be laid in accordance with
approved pattern or as directed. Finishing operation shall depending upon the
temperature and atmospheric conditions. The surface shall be left for some time till
moisture disappears form it. Fresh quantity of cement shall be mixed with water to
form a thick slurry and spread over the surface while the concrete is still green. Use
of dry cement or cement and sand mixture sprinkled on this surface to stiffen the
concrete or absorb excessive moisture shall not be permitted. The cement slurry
shall then be properly pressed twice by means of iron floats, once when the slurry is
applied and the second time when cement setting and finished floated smooth The
surface shall be marked with string or B.R.C. fabric jali to make the surface non-
slippery as and when directed. The junction of floors with wall plaster, dedo or
skirting shall be rounded off where so required up to 25 mm. radius. Flooring in
lavatories and bath rooms shall be laid after fixing of water closet and squatting pans
and floor traps which shall be plugged while laying the floors and opened after the
floors are completed. Any damage done to water supply or sanitary fittings during
execution of work shall be made good.
2.2. After the final set, the concrete shall be kept continuously wet. if required by
ponding for a period of not less than 7 days from the date of placement.
2.3. The form work shall be provided if necessary as directed by Engineer-in-charge.
Concreting shall be done as per alternate bay method with necessary centering
either by mastic or cement mortar as directed.
3.0. Mode of measurements & payment
3.1. The rate shall include the cost of all materials and labour involved in all the
operations described above. No deduction shall be made or extra paid for any
opening up to 0.1 sq. mt. In area in the floor, nothing extra shall be paid for laying
the floor at different levels in the same room or the counter yard.
3.2. The rate shall be for a unit of one sq. meter.
Item No.14 Providing and laying broken china mosaic flooring for terrace using 12 mm to
mm broken pieces of glazed tiles to be laid over cement mortar 1:3 to plain or
slope and to be tempered to bring mortar creme out upto surface using white
cement including rounding off junctions and extending them upto 15 cm along the
wall, clearing with water and oxalic acid etc. as directed.
Water proofing treatment over roof slab in three courses as specified below:
The existing covering on slab to be removed and surface is prepared. Construction
joints if any, are to be raked and cleaned. A coat of cement slurry at the rate of 4.4.
kg / sqm mixed with acrylic water proofing compound is spread which penetrates
into the structure which will be fill the cracks and other porous areas. 15 mm thick C.
M. 1 : 5 mixed with acrylic water proofing compound reinforced with a layer of
chicken mesh 12 mm x 26 g.
A layer of ¾ brick on edge with gaps filled with C M 1 : 5 mixed with acrylic water
proofing compound, 15 mm wide laid to a slope of 1 in 60 using I class well burnt
bricks (Water absorption not more than 20%) with minimum thickness of 65 mm at
outer ends, to get required gradient for adequate drainage.
c) III and final course :
Signature of Bidder
Ahmedabad Municipal Corporation
15 mm thick C M 1 : 5 mixed with acrylic water proofing compound and marked with
300 mm x 300 mm false squares including curing etc. complete all as per
specifications and directions of the Engineer In Charge.
Note The Acrylic water proofing compound to be used shall be :
1) CHEMSEAL – manufactured by overseas water proofing corporation, Bombay. The
proportion of CHEMSEAL shall be 2% by weight of cement.
2) CONPLAST x 421 IC – integral water proofing liquid manufactured by FOSROC
chemicals (India) Ltd., Bangalore. The proportion of CONPLAST x 421 IC shal be 2% by
weight of cement.
3) ROOF HYPROOF manufactured by ROFFE construction chemicals Pvt. Ltd. liquid
integral waterproofing compound at 140 c. c. per 50 kg of cement OR
4) Equivalent Acrylic approved water proofing compound
5) with Chaina mosaic tiles fitting required size as per site
Mode of measurement in Sq.mt
Item No.15 Providing and laying coloured glazed tiles of the size 300 mm x 200 mm x 8 mm /
300 mm x 450 mm x 8 mm in skirting, risers of steps and dedo on 10 mm thick
cement plaster 1:3 (1-cement: 3-coarse sand) & jointed with white cement slurry.
1.1. Water shall not be salty brackish and shall be clean, reasonably clear and free
objectionable quantities of silt and traces of oil and injurious alkalis, salts, organic
matter and other deleterious material which will either weaken the mortar of
concrete or cause efflorescence or attack the steel in R.C.C. Container for transport,
storage and handling of water shall be clean. Water shall conform to the standard
specified in I.S. 456-1978.
1.2. If required by the Engineer-in-Charge it shall be tested by comparison with
distilled water Comparison shall be made by means of standard cement tests for
soundness time of setting and mortar strength as specified in I.S. 269-1976. Any
indication of unsoundness charge in time of setting by 30 minutes or more or
decrease of more than 10 per cent in strength, of mortar prepared with water
sample when compared with the results obtained with mortar prepared with
distilled water shall be sufficient cause for rejection of water under test.
1.3. Water for curing mortar, concrete or masonry should not be too acidic or too
alkaline. It shall be free of elements which significantly affect the hydration reaction
or otherwise interfere with the hardening of mortar or concrete during curing or
those which produce objectionable stains or other unsightly deposits on concrete or
mortar surfaces
1.4. Hard and bitter water shall not be used for curing
1.5. Potable water will generally found suitable for curing mortar or concrete.
3.1. Cement snail be ordinary Portland slag cement as per I.S.269-1976 or Portland
slag cement as per I.S. 455-1976
Signature of Bidder
Ahmedabad Municipal Corporation
6.1. Sand shall be natural sand, clean, well graded hard strong, durable and gritty
particles free from injurious amounts of dust, clay kankar nodules, soft or flaky
particles shale, alkali salts organic matter, loam, mica or other deleterious
substances and shall be got approved from the Engineer-in-Charge. The sand shall
not contain more contain more than 8 percent of silt as determined by field test, if
necessary the sand shall be washed to make it clean.
6.2. Coarse Sand :
The fineness modulus of coarse sand shall not be less than 2.5 and shall not exceed
0. The sieve analysis of coarse shall be as under.
Sieve passing Percentage by
I.S. Designation weight
sieve weight passing
2.36 mm 90 to 100 300 micron 50 -
1.18 mm 70 to 100 150 micron 0 -
6.3. Fine Sand :
The fineness modulus shall not exceed 1.0 The sieve analysis of fine sand shall be as
Sieve passing Percentage by
I.S. Designation weight
sieve weight passing
2.36 mm 100 300 micron 5 -
1.18 mm 75 to 100 150 micron 0 -
11.2. Proportion of Mix
11.2.1. Cement and sand shall be mixed to specified proportion, sand being
measured by measuring boxes, the proportion of cement will be by volume on the
basis of 50 Kg/Bag of cement being equal to 0.0342 Cu.m. The mortar may be hand
mixed of machine mixed as directed.
11.3. Proportion of Mortar :
11.3.1. In hand mixed mortar, cement and sand in the specified proportions shall be
thoroughly mixed dry on a clean impervious platform by turning over at least 3 times
or more till a homogeneous mixture of uniform colour is obtained. Mixing platform
shall be so arranged that no deleterious extraneous material shall get mixed with
mortar or mortar shall flow out. While mixing, the water shall be gradually added
and thoroughly mixed to from a stiff plastic mass of uniform colour so that each
particle of sand shall be completely covered with a film of wet cement. The water
cement ratio shall be adopted as directed
11.3.2. The mortar so prepared shall be used within 30 minutes of adding water.
Only such quantity of mortar shall be prepared as can be used within 30 minutes
shall conform to M-11.
Coloured glazed tiles
Signature of Bidder
Ahmedabad Municipal Corporation
1. The tiles shall be of best quality as approved by the Engineer-in-charge. They shall
be flat and true to shape They shall he fee from cracks, crazing sports chipper) edges
and corners. The glazing shall be of uniform shade.
2. The other technical specifications for coloured glazed tiles are as per relevant
Indian standards.
2.0. Workmanship
2.1. Preparation of Surface:
In case of brick masonry wall, the joints shall be raked out to a depth of least 15 mm.
while the masonry is being laid. In case of concrete wall the surface shall be chiseled
and roughed with wire brushes. The surface shall be cleaned and wetted thoroughly
before commencing the laying work.
2.2.1. The wall surface shall be covered with 10 mm. thick plaster of cement mortar
1:3 mix and allowed to harden. The plaster shall be roughened with wire brushes
both way. The back of tiles shall be floated with grey cement slurry set and edges
with white cement slurry in bedding mortar. The tiles shall be gently tapped in
position on after the other keeping the joints as thin as possible. Top of skirting or
dedo shall be truly horizontal and the joints vertical or as per required pattern.
2.2.2. Risers of steps, skirting and dedo shall rest on top of treads or flooring. Where
full size tiles cannot be fixed, They shall be cut to the required size and the edges be
2.2.3. The joints shall be cleaned and flush pointed with white cement. The surface
shall be kept wet for seven days.
After curing the surface shall be washed clean.
3.0. Mode of measurements and payment
3.1. The rate shall include the cost of all materials and labour required for various
operations described above.
Risers of steps: skirting and dedo shall be measured in square meters, length and
height shall be measured along the finished face of the skirting or dedo including
curves, where special such as covers. internal and external angles, etc., used. The
length and height shall be measured correct lo the centimeter except in case of risers
and skirting where height shall be measured correct to 3 mm.
3.2. The rate shall be for a unit of one sq. meter.
Item No.16 Providing 15 mm thick cement plaster in single coat on Rough (Similar) side of
single or half brick walls for interior plastering up to floor two level and finished
even and smooth in (i) Cement mortar 1:3 (1-cement: 3-sand)
1.1. Water shall conform to M-1. The cement mortar of proportion 1:3 shall conform
2.0. Workmanship
2.1. Scaffolding:
Wooden bullies, bamboos, planks, trestles and other scaffolding shall be sound.
These shall be properly examined before erection and use. Stage scaffolding shall be
provided for ceiling plaster which shall be independent of the walls.
2.2. Preparation of back-ground :
Signature of Bidder
Ahmedabad Municipal Corporation
2.2.1. The surface shall be cleaned of all dust, loose mortar droppings, traces of
algae, efflorescence and other foreign matter by water or by brushing. Smooth
surface shall be toughened by wire brushing if it is not hard and by hacking if it is
hard. In case of concrete surface, if a chemical retarded has been applied to the form
work, the surface shall be roughened by wire brushing and all the resulting dust and
loose particles cleaned off and care shall be taken that none of the readers if left on
the surface. Trimming of projections on brick/concrete surfaces where necessary
shall be carried out to get an even surface.
2.2.2. Raking of joints in case of masonry where necessary shall be allowed to dry
out for sufficient period before carrying out the plaster work.
2.2.3. The work shall not be soaked but only damped evenly before applying the
plaster. If the surface becomes dry, such area shall be moistened again.
2.2.4. For external plaster, the pestering operation shall be started from top floor
and carried downwards. For internal plaster, the plastering operations may be-
started wherever the building frame and cladding work are ready and the temporary
supports of the ceiling resting on the wall of the floor have been removed. Ceiling
plaster shall be completed before starting plaster to walls.
2.3. Application of plaster:
2.3.1. The plaster about 15x15 cms. shall be first applied horizontally and vertically at
not more than 2 meters intervals over the entire surface to serve as gauge. The
surfaces of these gauges shall be truly in plane of the finished plastered surface. The
mortar shall then be applied in uniform surface slightly more than the specified
thickness, then brought to a true surface by working a wooden straight edge
reaching across the gauges with small upward and sideways movements at a time.
Finally, the surface shall be finished off true with a trowel or wooden float according
as a smooth or a smooth or a sandy granular texture is required Excessive troweling
or overworking the float shall be avoided. All corners, arises, angles and junctions
shall be truly vertical or horizontal as the case may be and shall be carefully finished.
Hounding or chamfering, corners, arises junctions etc. shall be carried out with
proper templates to be size required.
2.3.2. Cement plaster shall be used within half an hour after addition of water. And
mortar or plaster which is partially set shall be rejected and removed forthwith from
2.3.3. In suspending the work at the end of the day, the plaster shall be left out clean
to the line both horizontally and vertically, when recommencing the plaster, the
edges of the old work shall be scraped clean and wetted with cement putty before
plaster is applied to the adjacent areas to enable the two to properly join together.
Plastering work shall be closed at the end of the day on the body of the wall and
nearer than 15 cm. to any corners or arises. It shall not be closed on the body of
features such as plaster bands and cornices not at the corners or arises. Horizontal
joints in plaster work shall not also occur on parapet tops and copings as these
invariably lead to leakage. No portion of the surface shall be left out initially to be
packed up later on.
2.3.4. Each coat shall be kept damp continuously till the next coat is applied or for a
minimum period of 7 days. Moistening shall commence as soon as plaster is
hardened sufficiently. Soaking of walls shall be avoided and only as much water as
can be readily absorbed shall be used, excessive evaporation on the sunny or
Signature of Bidder
Ahmedabad Municipal Corporation
windward side of building in hot air or dry weather shall be prevented by hanging
matting or gunny bags oh the outside of the plaster and keeping them wet.
3.0. Mode of measurements & payment
3.1. The rate shall include the cost of all materials, labour and scaffolding etc.
involved in the operations described under workmanship.
3.2. All plastering shall be measured in square meters unless otherwise specified.
Length breadth or height shall be measured correct to a centimeter.
3.3. Thickness of the plaster shall be exclusive of he thickness of the key i.e. grooves
or open joints in brick work, stone work etc. or space between laths. Thickness of
plaster shall be average thickness with minimum 10 mm. at any point on this surface.
3.4. This item includes plastering up to floor two level.
3.5. The measurement of wall plastering shall be taken between the walls or
partition (dimensions before plastering being taken) for length and from the top of
floor or skirting to ceiling for height. Depth of cover of cornices if any shall be
3.6. Soffits of stairs shall be measured as plastering on ceilings, following soffits shall
be measured separately.
3.7. For jambs, soffits, sills etc. for openings not exceeding 0.5 sq. met each in area
for ends of joints beams, posts, girders, steps etc. not exceeding 0.5 sq. mt each in
area and for openings exceeding 0.5. sq. mt and not exceeding 3.00 sq. mt. in each
area deductions and additions shall be made in the following manners.
(a) No deductions shall be made for ends of joints, beams, posts etc. and openings
not exceeding 0.5 sq. mt each and no addition shall be made for reveals, jambs,
soffits, sils etc. of these openings, for finish to plaster around ends of joints, beams
(b) Deduction for openings exceeding 0.5 sq. mt but not exceeding 3 sq.mt. each
shall be made as follows and no addition shall be made for ravels, jambs, soffits, sills
etc. of these openings, (i) When both faces of all wall are plastered with same
plaster, deduction shall be made for one face only, (ii) When two faces of wall are
plastered with different types of plasters or if one face is plastered and the other
pointed, deductions shall be made from the plaster or pointing on the side of frame
for door, window etc. on which width of reveals is less than that on the other side
but no deductions shall be made on the other side. Where width of reveals on both
faces of all are equal, deductions of 50% of area of opening on each face shall be
made from areas of plaster and / or pointing as the case may be.
3.8. For openings having door frames equal to or projecting beyond the thickness of
wall, full deduction for opening shall be made from each plastered face of the wall.
3.9. tn case of openings of area above 3 sq. mt. each, deduction shall be made for
openings but jambs, soffits sand sills shall be measured.
3.10. The rate shall be for a unit of One sq. meter.
Item No.17 Providing 20 mm thick sand faced cement plaster on walls upto height 10 metres
above ground level consisting of 12 mm thick backing coat of C.M. 1:3 (1-cement :
3-sand) and 8mm thick finishing coat of C.M. 1:1 (1-cement : 1-sand) etc. complete.
Water shall conform to M-12 cement mortar shall conform to M-11.
Signature of Bidder
Ahmedabad Municipal Corporation
The work shall be carried out in the coats. The backing coat (base coat) shall be
mm. Thick in C.M. 1:3 except that the thickness of back shall be 12 mm. Average.
Before the first coat hardnes its shall be beaten up by edges of wooden tappers and
close dents shall be made on the surface. The subsequent coat shall be applied after
this coat has been allowed to set for 3 to 5 days depending upto the weather
conditions. The surface shall not be allowed to dry during this period.
The second coat shall be completed to 8 mm. Thickness in C.M. 1:1 as described
above, including raising sand facing by bushing. The sample of sand face shall be got
approved before the work is started. The work shall be carried out uniformly as per
sample approved.
The curing shall be started overnight after finishing of plaster. The plaster shall be
period of 7 days. During this period, it shall be protected from all damages.
Mode of measurement and payments:
The relevant specification of item no. 49 shall be followed except that the sand face
plaster on outside above ground level shall be measured under this item.
The rate shall be for a unit of one sq. metre.
Item No.18 Distempering (Two coats) with oil bound distemper of approved brand and
manufacture and of required shade on wall surfaces to give an even shade, over
and including a priming coat with distemper primer of approved brand and
manufacture after thoroughly brushing the surface free from mortar dropping and
other foreign matter and also including preparing the surface even and sand
papered smooth.
1.1. Oil bound washable distemper and primer shall be of approved brand and
manufacture. The distemper shall be of required colour and shade and the same
shall conform to I.S. : 428-1969.
2.0. Workmanship
2.1. Scaffolding Where scaffolding is required, it shall be erected in such a way that
as far as possible no pail of scaffolding shall rest against the surface to be
distempered. A properly secured and well tied suspended platform (Joola) may be
used for distempering. Where ladders are used, pieces of old gunny bags shall be
tied at top and bottom to prevent scratches to the walls and floors. For distempering
to ceiling, proper stage scaffolding shall be erected where necessary.
2.2. Preparation of surface :
2.2.1. The undecorated surface to be distempered shall be thoroughly brushed from
dust, dirt, grease, mortar dropping and other foreign matter and sand papered
smooth. New plaster surface shall be allowed to dry for at least 2 months before
applications of distemper.
2.2.2. All unnecessary nails shall be removed. Pitting in plaster shall be made good
with plaster again with a fine grade sand paper and made smooth. A coat of
distemper shall be applied over the patches. The surface shall be allowed to dry
thoroughly before the regular coat of distemper is allowed. The surface affected by
moulds, moss, fungi, algae lichens, efflorescence etc. shall be treated in accordance
with I.S; 2395 (Part 01) 1966. Before applying distempering, any unevenness shall be
Signature of Bidder
Ahmedabad Municipal Corporation
made good by applying putty made of plaster of pairs mixed with water on entire
surface including filling up the undulation and then sand papering the same after it is
2.3. Priming coat :
2.3.1. A priming coat of distemper primer of approved manufacture and shade shall
be applied over the papered surface in case of new work on undecorated surface. If
the distemper priming is done after the wall surface dries completely, the distemper
primer shall be applied.
2.3.2. Application of primer shall be done as under: The primer shall be applied with
a brush on the clean dry and smooth surface. Horizontal strokes shall be given first
and vertical strokes shall be applied immediately afterwards. This entire operation
will constitute on coat. The surface shall be finished as uniformly as possible leaving
no brush marks. It shall be allowed to dry for at least 48 hours before oil bound
distemper or paint is applied.
2.3.3. Oil bound distemper is not recommended to be applied within six months of
the completion of wall plaster.
2.4. Preparation of oil bound distemper :
2.4.1. The distemper shall be diluted with water or any other prescribed thinner in a
manner recommended by the manufacturer only. Sufficient quantity of distemper
required for a days work shall be prepared.
2.5. Application of Distemper coat:
2.5.1. For undecorated surfaces, after the primer coat is dried for at least 48 hours,
the surface shall be lightly sand papered to make it smooth for receiving the
distemper, taking care not to rub out priming coat. All loose particles shall be dusted
of after rubbing. Minimum tow coats of distemper shall be applied with brushes
inhorizontal strokes followed immediately by vertical strokes which together shall
constitute one coat. The subsequent coats shall be applied after a time interval of at
least 24 hours between consecutive coats to permit proper drying of the proceeding
coat. The finished surface shall be even and inform without patches, brush marks,
distemper drops etc.
2.5.2. Sufficient quantity of distemper shall be mixed to finish one room at a time.
The application of a coat in each room shall be finished in one operation and no work
shall be striated in any room which cannot be completed on the same day.
2.5.3. 15 cm. double bristled distemper brush shall be used. After day's work brushes
shall be thoroughly washed in hot water with soap solution and hung down to dry.
Old brushes which are dirty and caked with distemper shall not be used on the work.
2.6. Protective measurements :
The surfaces of doors, windows, floors, articles of furniture etc. and such other parts
of the buildings as are not to be distempered shall be protected form being splashed
upon. Such surfaces shall be cleaned of distemper splashes if any.
3.0. Mode of measurements and payment
3.1. Priming coat of distemper primer, scraping of surface spoiled by struck roots,
removal of oil and grease spots, treatment for infraction of effloresces., mould moss,
fungi, algae and litchen and patch repairs to plaster shall be included in this item for
which nothing extra shall be paid.
3.2. All the work shall be measured net in the decimal system as in place subject to
the following limits unless otherwise stated herein after:
Signature of Bidder
Ahmedabad Municipal Corporation
(a) Dimensions shall be measured to the nearest 0.01 m.
(b) Area in individual items shall be worked out to the nearest 0.01 sq. m. All work
shall be made for ends of joints, beams, posts etc., and openings, not exceeding
sq.mt. each and no addition shall be made for reveals, jambs, soffits, sills etc. of
these openings not for finish around ends of joints, beams, posts etc.
3.3. Deductions of opening exceeding 0.5 sq.m. but not exceeding 3 sq. m. each shall
be made as follows and net addition shall be made for reveals, jambs, soffits etc. of
these openings :
(a) When both the faces of wall are provided with same finish, deductions shall be
made for one face only.
(b) When each face of wall is provided with different finish, deduction shall be made
for that side of frame for doors, windows etc. on which width of reveals is less than
that of the other side but no deduction shall be made on the other side. Where the
width of reveals on the both the fates of wall are equal, deduction of 50% of area of
opening on each face shall be made from area of finish.
(c) When only one face of wall is treated and the other face is not treated, full
deductions shall be made if the width of the reveal on treated side is less than that
on untreated side but if the width of the reveal is equal or more than that on
untreated side neither deductions nor additions to be made for reveals, jambs,
soffits, sills etc.
3.4. In case of opening of area exceeding 3 sq. m. each deduction shall be made for
openings but jambs, sills and soffits shall be measured.
3.5. Mo deductions shall be made for attachments such as casings, conduits, pipes,
electric wiring and the like.
3.6. Item includes removing nails, making good holes, patches with materials similar
in composition of distemper.
3.7. The rate includes cost of ail materials, labours, scaffolding, protective measures
etc. involved in all the operations described above. This shall also include
conveyance, delivery, handing , unloading, storing work etc.
3.8. The rate shall be for a unit of one sq. meter.
Item No.19 Finishing wall with Apex Ultima Acrylic paint of "Asian Paint" on wall surfaces (two
coats) to give required even shade after application of Exterior Primer of Approved
Brand & Manufacturers after thoroughly brushing the surface to remove all dirt &
remains of loose powdered materials. (N.S.)
1.1 Preparation of Mix : This shall be done as per manufacturers instructions. The
thinning of emulsion is to be done with water and not with turpentine. The quantity of
thinner to be added shall be as per manufacturer instructions.
1.2 Applications :
1.2.1 Before pouring into small containers for use, the paint shall be stirred thoroughly in its
container. When applying also, the paint shall be continuously stirred in the smaller
container, so that its consistency is kept uniform.
1.2.2 The paint shall be laid on evenly and smoothly by meant of crossing and laying off the
crossing and laying off consist of covering the area over with paint, brushing the surface
hard for the first time over and then brushing alternately in opposite direction two or
three times and then finally brushing lightly in a direction at right angles to the same. In
this process, no brush marks shall be left after the laying off is finished. No hair marks
from the brush or clogging of paint puddles in the corners of panels, angles of mouldings,
Signature of Bidder
Ahmedabad Municipal Corporation
etc. shall be left on the work. The full process of crossing and laying off will constitute one
1.2.3 The paint shall be applied with brush or rollers. For undecorated surfaces, the surface
shall be treated with minimum two coats of cement water proofing paint. The second or
subsequent coat shall not be started until the preceding coat has become sufficiently hard
to resist marking by brush being used.
1.2.4 The surface on finishing shall present a flat velvety smooth finish. It shall be even and
uniform in shade without patches, brush marks, paint drops etc.
1.3 Precautions :
(a) Old brushes if they are to be used with emulsion paints, shall be completely dried of
turpentine oil paint by washing in warm soap water.
Brushes shall be quickly washed in water immediately after use and kept immersed in
water during break periods to prevent the paint from hardening on the brush.
(b) In the preparation of wall for plastic emulsion painting, no oil base putties shall be used in
filling cracks, holes etc.
(c) Splashes on floors etc. shall be cleaned out without delay as they will be difficult to
remove after hardening.
(d) Washing of surfaces treated with emulsion paint shall not be done within 3 to 4 weeks of
2.6 Protective measures :
2.1.1 The relevant specifications of item No. 18.17 para 2.3 shall be followed.
2.0 Mode of measurements & payment :.
2.1 The rate shall be for a unit of one sq. metre.
Item No.20 Finishing wall with weather proof exterior emulsion paint on wall surface (two
coats) to give an required shape even shade after thoroughly brushing the surface
to remove all dirt and remains of loose powdered materials etc. complete.
Water shall be conform M-1. The plastic emulsion shall conform to I.S.: 5411-1969 (part-l).
2.0. Workmanship
2.1. Scaffolding : The relevant specifications of item-No. 18.11 Para 2.1 shall be followed.
2.2. Preparation of surface : The relevant specification of item No. 18.44 Para 2.2 shall be
2.3. Preparation of Mix :
This shall be done as per manufacture's instructions. The thinning of emulsion is to
be done with water and not with turpentine. The quantity of thinner to be added
shall be as per manufacturer instructions.
2.4. Application :
2.4.1. Before pouring into small containers for use, the paint shall be stirred
thoroughly in item container. When applying also, the paint shall be continuously
stirred in the smaller container, so that its consistency is kept uniform.
2.4.2. The paint shall be laid on evenly and smoothly by means of crossing and laying
off the crossing and consist of covering the area over with paint, brushing the surface
hard for the first time over and then, brushing alternately in opposite direction two
or three times and then finally brushing lightly in direction at right angles to the
same. In this process, no brush Marks shall be left after the laying off is finished. No
hair marks from the brush or clogging of paint puddles in the corners of panels,
angles of moldings, etc. shall be left on the work. The full process of crossing and
laying off will constitute one coat.
Signature of Bidder
Ahmedabad Municipal Corporation
2.4.3. The paint shall be applied with brush or rollers. For undecorated surfaces, the
surface shall be treated with minimum two coats of cement water proofing paint.
The second or subsequent coat shall not be started until the proceeding coat as
become sufficiently hard to resist marking by brushing being used.
2.4.4. The surface on finishing shall present a flat velvety smooth finish. It shall be
even and uniform in shade without patches, brush marks, paint drops etc.
2.5. Precautions :
(a) Old brushes if they are to be used with emulsion paints, shall be completely dried
of turpentine or oil paint by washing in warm soap water. Brushes shall be quickly
washed in water immediately after use and kept immersed in water fusing break
periods to prevent the paint from hardening on the brush.
(b) In the preparation of wall for plastic emulsion painting, no oil base petals shall be
sued in filling cracks, holes etc.
(c) Splashes on floors etc. shall be cleaned out without delay as they will be difficult
to remove after hardening.
(d) Washing or surfaces treated with emulsion paint shall not be done within 3 to
weeks of application.
3.0. Mode of measurements and payment
3.2. The rate shall be for a unit of One sq. meter.
Item No.21 Applying two coats of Birla (white cement based) or Asian (acrylic lapy-putty) or
equivalent & two coats of primer of approved brand and manufacture on new wall
surface to give an even shade including thoroughly brushing the surface free from
mortar dropping and other foreign matter and sand papered smooth.
The rate includes scrapping the existing surface and laying 3 coats as per the
consultant’s instructions. Preferred Brand " Birla White Putty" or equivalent but
approved. This includes necessary scrapping of the wall / ceiling, then applying
coat of putty, then giving enough time to dry the putty, the next cycle of the second
coat shall only start after proper drying of the first coat is done. Then the levelling
shall be checked and the third and final coat shall be done after proper inspection
from the client / consultants. If any undulation found after 3rd coat of the putty, the
consultants may suggest for the another coat , for which no extra payment shall be
made to the contractors.
Water shall conform to M-1 and Asian acrylic Putty and Primer or as equivalent make
approved by Engineer In charge.
Preparation of surface:
The surface shall be thoroughly cleaned of all dust, dirt, mortar dropping and other
foreign matter before white wash is to be applied. The surface spoiled by smoke soot
shall be scrapped with steel wire brushes or steel scrapers or shall be rubbed with
over burnt surkhi or brick bats. The surface shall be then broomed to remove all dust
and dirt and shall be washed with clean water. Oil or grease spots shall be removed
by suitable chemical. Smooth surfaces shall be rubbed with wire brushes. All
unsound portion of the surface plaster shall be removed to full depth of plaster in
rectangular patches and plastered again after raking the masonry joints properly.
Such portions shall be wetted and allowed to dry. Any crevices, at any level shall be
Signature of Bidder
Ahmedabad Municipal Corporation
cleaned and filled with the plaster mortar and cured as above. They shall then be
given one coat of white wash.
All unnecessary nails shall be removed, the holes, cracks, patches etc. shall be made
good with material similar in composition to the surface to be prepared.
Wherever scaffolding is necessary, it shall be erected in such a way that as far as
possible no part of scaffolding shall rest against the surface to be white or colour
washed. A properly secured, strong and well tied suspended platform (Zoola) may be
used for white washing. Where ladders are used, pieces of old gunny bags shall be
tied at top and bottom to prevent scratches to the floors and walls. For white
washing of ceilings, proper stage scaffolding shall be erected where necessary. Also,
while painting the ceiling, the floor area shall be covered properly with plastic so that
the flooring is not spoiled.
The primer shall be applied with a brush on the clean, dry and smooth surface.
Horizontal strokes shall be given first and vertical strokes shall be applied
immediately afterwards. This entire operation will constitute one coat. The surface
shall be finished as uniformly as possible leaving no brush marks. A coat of putty
(lapi) shall be applied to the entire surface. Putty shall be used of readymade or
brought of the company like Asian as directed by the Engineer-in charge and
Architect. The second coat of primer and putty shall then be applied and it shall
thereafter be allowed to dry for at least 48 hours before oil bound distemper or
paint is applied.
Mode of Measurements and Payment:
The item shall be measured in the unit of Square Meter for Payment.
Item No.22 Demolition including stacking of serviceable materials and disposal of
unserviceable materials with all lead and lift. (i) R.C.C. work
1.0. Workmanship
1.1. The demolition shall consist of demolition of one or more parts of the building as
specified or shown in the drawings. Demolition implies taking up or down or
breaking up. This shall consist of demolishing whole or part of work including all
relevant items as specified or shown in the drawings.
1.2. The demolition shall always be planned before hand shall be done in reverse
order to the one in which the structure was constructed. This scheme shall be got
approved form the Engineer-in-charge before starting the work. This however will
not absolve the contractor from the responsibility of proper and safe demolition.
1.3. Necessary propping, shoring and under pinning shall be provided for the safety
of the adjoining work or property, which is to be left intact, before dismantling and
demolishing is taken up and the work shall be carried out in such a way that no
damage is caused to the adjoining property.
1.4. Wherever required, temporary enclosures or partitions shall also be provided.
Necessary precautions shall be taken to keep the dust nuisance down as and where
1.5. Dismantling shall be commenced in a systematic manner. All materials which are
likely to be damaged by dropping from a height or demolishing roof, masonry etc.
Signature of Bidder
Ahmedabad Municipal Corporation
shall be carefully dismantled first. The dismantled articles shall be properly stacked
1.6. All materials obtained from demolition shall be the property of Government
unless otherwise specified and shall bee kept in safe custody until handed over to
the Engineer-in-charge.
1.7. Any serviceable materials, obtained during dismantling or demolition shall be
separated out and stacked properly as directed with all lead and lift. All
unserviceable materials, rubbish etc., shall be stacked as directed' by the Engineer-
1.8. On completion of work, the site shall be cleared of all debris rubbish and cleaned
2.0. Mode of measurements and payment
2.1. Measurements of all work except hidden work shall be taken before demolition
or dismantling and no allowance for increase in bulk shall be allowed. The demolition
of lime concrete shall be measured under this item. Specification for deduction for
voids, openings etc. shall be on same basis as that employed for construction of
2.2. All work shall be measured in decimal system as fixed in its place subject to the
following limits; unless otherwise stated herein after : (a) Dimensions shall be
measured to the nearest 0.01 mt. (b) Area shall be worked out to the nearest
sq. mt.(c) Cubical contents shall be worked out to the nearest 0.01 Cu.m.
2.3. The rate shall include cost of all labour involved and tools used in demolishing
and dismantling including scaffolding. The rate shall also include the charges for
separating out and stacking the serviceable materials properly and disposing the
unserviceable materials with all lead and lift. The rate also includes for temporary
shoring for the safety of the portion not required to be pulled down or of adjoining
property arid providing temporary enclosures or portions where considered
2.4. The rate shall be for a unit of one cubic meter.
3.0. Workmanship
3.1. The relevant specifications of above mentioned description shall be followed
except that demolition of R.C.C. work is to be done.
4.0. Mode of measurements and payment
4.1. The relevant specifications of above mentioned description shall be followed
except that the demolition of reinforced concrete structure is to be clone. The
unserviceable materials shall be disposed of at all leads and lifts. The rate excludes
scraping straightening of reinforcement but includes cutting of reinforcement.
4.2. The rate shall be for a unit of one cubic meter.
The relevant specifications of above mentioned description shall be followed except
that demolition of R.C.C. work is to be done.
5.0. Mode of measurements and payment
5.1. The relevant specifications of above mentioned description shall be followed
except that the demolition of reinforced concrete structure is to be clone. The
unserviceable materials shall be disposed of at all leads and lifts. The rate excludes
scraping straightening of reinforcement but includes cutting of reinforcement.
5.2. The rate shall be for a unit of one cubic meter.
Signature of Bidder
Ahmedabad Municipal Corporation
Item No.23 Demolition of Brickwork and stone masonry including stacking of serviceable
materials and disposal of unserviceable materials with all lead and lift. (ii) In
1.0. Workmanship
1.1. The relevant specifications of above mentioned description shall be followed
except demolition of brick or stone masonry in cement mortar is to be done.
2.0. Mode measurements and payment
2.1. The relevant specifications of item Demolition of brick work and stone masonry
including stacking of serviceable materials and disposal of unserviceable materials
with all leads and lift : in lime mortar. shall be followed. The unserviceable materials
shall be stacked as directed by Engineer-in-charge with all leads and lifts.
Item No.24 Dismentaling tiled of stone floors laid in mortar including stacking of serviceable
materil as and disposal of unserviceable materials with all lead and lift.
1.0. Workmanship
1.1. The relevant specification of item no. 27 shall be followed except the
dismantling of tiled or stone floors laid on mortar shall be done. Dismantling implies
carefully taking up or down or removing without damage. The articles shall be
passed by hand where necessary and lowered and where these are fixed by nail,
screws, bolts etc., these shall be taken out with proper tools.
2.0. Mode of measurements and payment
2.1. The supporting materials such as joints, beams if any etc. shall be measured
separately. The relevant specifications of item No. 27 shall be followed, The rate
shall include staking the unserviceable materials as directed with all lead and lift.
2.2. The late shall be for a unit of one sq. meter.
Item No.25 Dismentling doors, windows, ventilators etc. (wood or steel) shutters including
chowkhats architraves, hold fasts and other attachment etc. complete and stacking
the material with in all lead and lift. (ii) Exceeding 3 Sq.mt. in area.
1.0. Workmanship
The relevant specifications of item No. 20.49(I) shall be followed except that the area
of doors, windows, ventilators, exceeding 3 sq. meters are to be dismantled under
2.0. Mode of measurements of payment
2.1. The relevant specifications of item No. 20.49 (I) above shall be followed.
2.2. The rate shall be for a unit of One number.
Item No.26 Dismentling C.I. pipes G.S.W. pipes and A.C. rain water pipes with fittings and
clamps including stacking the materials with all lead and lift (for any dia. of pipe)
1.0. Workmanship
The relevant specifications of item No. 20.23 shall be followed except that the
dismantling work of pipes lines of C.I., G.S.W. & A.C. Pipes with fitting shall be carried
2.0. Mode of measurements and payment
2.1. The relevant specifications of No. 20.1 (i) shall be followed.
2.2. Water pipe lines, including rain water pipes, with clamps and specials, swear
pipe lines, (Salt glazed ware or concrete) etc. shall be measured in running meter
Signature of Bidder
Ahmedabad Municipal Corporation
inclusive of joints. (The measurements shall be taken along the centre line of pipe
2.3. The rate shall be for a unit of One running meter.
Item No.27 Dismantling sanitary fittings like wash basin W.C. pan Indian and European type,
flushing tank etc. including stacking the materials with all lead and lift.
1.0. Workmanship
The relevant specifications of item No. 23.23 shall be followed except that the
dismantling work of sanitary fittings such as wash basin, W.C. Pan (all type of pans),
Flushing tanks etc. shall be carried out.
2.0. Mode of measurements & payment
2.1. The relevant specifications of item No. 20.1 (i) shall be followed.
2.2. The rate shall be for a unit of one number.
Item No.28 Removing and scraping of old deteriorated plaster of any thickness from
wall/R.C.C. member including stacking of serviceable material and disposal of
unserviceable from site of work with all lead and lift.
The rate shall be for a unit of smt basis.
Item No.29 Providing, erecting and fixing double coated Syntex PVC. (ISI) water tank of
required capacity each with all necessary fittings and connection etc. complete on
Polythene water tank shall be of approved quality, one piece moulded P.V.C.
water storage tank. This shall be in cylindrical vertical form with top cover of
required capacity. Necessary inlet, outlet, washout and overflow connections shall
be provided and such connection shall be water tight. The tank shall be fixed over
masonary platform finished with plaster. Nothing extra for the platform shall be
paid. Nothing extra shall be paid to lift and fix the tank at any height as required.
The measurement shall on liter basis.
Item No.30 Providing and fixing cast iron (Spun) Nahni trap of the following nominal diameter
of self cleaning design with C.I. screaed down or higned grating including cost of
cutting and making good the walls and floor 100 mm inlet and 50 mm outlet. (C)
1.1. The cast iron (spun) Nahni trap shall conform to M-69. The C.I. hinged or
screwed down cover shall be of best quality
2.0. Workmanship
2.1. The Nahni trap with 100 mm. dia inlet and 50 mm. dia. outlet shall be fixed as
per drawing or as directed.
2.2. The Nahni trap shall be jointed with C.I. Pipe, 75 mm. dia. with lead joints. The
lead joints shall be done in conformation with I.S. 782.-1976.
3.0. Mode of measurements and payment
3.1. The rate includes cost of all labour, materials, tools and plants etc. required for
satisfactory completion of this item including lead, jointing and testing.
3.2. The rate shall be for a unit of one number.
Item No.31 Providing and fixing water closet squatting Pan (Indian type W.C. Pan) size 580 mm
(Earth work, bed concrete, foot rest and trap to be measured and paid for
separately) (A) Vitreous China. (I) Long pattern = White colour
Signature of Bidder
Ahmedabad Municipal Corporation
1.1. Water closet squatting pan ( Indian type W.C. Pan) shall conform to M-62.
Cement mortar shall conform to M-
2.0. Workmanship
2.1. The pan shall be sunk into the floor and embedded in a cushion of average
cm. cement concrete 1:5:10 (1 cement : 10 graded stone aggregate or brick
aggregate 40 mm. nominal size) or and its bed concrete, the floor should be left
mm.-below the top level of the pan so as to allow for flooring and its bed concrete.
The floor should be suitably stopped so that the .waste water is drained into the pan.
The shall be provided with 100 mm. 'P' or 'S' trap as specified in the item No.
with approximately 50 mm seal-The joints between the pan and the trap shall be
made leak-proof with cement mortar 1:1 (1 cement : 1 fine sand).
3.0. Mode of measurements and payment
3.1. The rate shall include the cost of all materials and labours involved in the
operations described under workmanship.
3.2. The rate shall be for a unit of One number.
3.3. The 'P' or S1 trap unit of One number.
Item No.32 Providing and fixing wash down water closet (European type, W.C.Pan) with
integral P or S trap including jointing the trap with soil pipe in Cement Mortar 1:1
(1- Cement: 1-fine sand) (Seal and cover to be measured and paid forseparately)
(A) vitreous China Pattern: (i) in white colour
Wash down water closet (European type W.C. Pan) shall conform to M-60. Cement
mortar shah conform to M-11.
2.0. Workmanship
.1. The closet shall be fixed to the floor by means of 75 mm. long 6.5 mm. diameter
counter sunk bolts and nuts embedded in the floor concrete using rubber or before
washers so as not to allow any lateral displacement The joint between the trap of
W.C. and soil pipe shall ho made with C M. 1:1 (1 cement : 1 fine sand).
3.0. Mode of measurements and payment
3.1. The rate shall includes the cost of all materials and labour involved in all the
operations described under workmanship.
3.2. The rate includes cost of all labour for fixing pans and sent and cover, inlet,
connections etc. complete including testing the same. The payment of seat and
cover shall be made separately.
3.3. The rate shall be for a unit of One number.
Item No.33 Providing & Fixing Angle cock of "Ess Ess"- Trend series or equivalent standard
make as approved by engg. in charge all complete. (N.S.)
The work shall be carried out as per instruction of engg. in charge
The rate shall be for a unit of one no.
Item No.34 Providing and fixing 100 mm size P or S trap for water closet squatting pan
including jointing the trap with the pan and soil pipe in cement Mortar 1:1 (1-
Cement: 1-Fine sand) (A) Vitreous China Pattern in white colour
1.0. Materials :
The 100 mm. size 'P' or 'S' trap for water closet shall confirm to M-62. Cement
mortar shall conform to M-11.
2.0. Workmanship
Signature of Bidder
Ahmedabad Municipal Corporation
2.1. The 'P' or 'S' trap shall be fixed with pan cast iron pipe with C.M. 1.1. The pan
shall be provided with a 100 nun. 'P' or 'S' trap as specified in the item with an
approximately 50 mm. seal The joint between the pan and the trap shall be made
leak-proof with cement mortar 1:1(1 cement : 1 fine sand).
3.0. Mode of measurements and payment
3.1. The rate shall include the cost of all materials and labour involved in the
operations described under workmanship including testing.
3.2. The rate shall be for a unit of one number.
Item No.35 Providing and fixing wash basin with single hole for pillar tap with C.I. or M.S.
brackets painted white including sutting holes and making good the same but
excluding fittings. (A) Vitreous China: (ii) Flat Back wash basin 550 mm x 400 mm
size. (i) In white colour.
1.1. The white glazed earthenware wash basin shall be 550 mm. x 400mm. of 1st
quality and make as approved by the Engineer-in-charge. The wash basin shall-
conform to M-59.
2.0. Workmanship
2.1. The washbasin shall be fixed on the wall as and where directed. The wash basin
shall be supported on a pair of M.S. or C.I. brackets fixed in C.M. 1:3 (1 cement :
sand). The bracket shall conform to I.S. : 775-1962. The wall plaster on the rear shall
be cut to rest the top edge of the washbasin. After fixing the basing, plaster shall be
made good and surface finished to match the existing one.
2.2. The brackets shall be painted white with ready-mixed paint.
2.3. The C.I. brass trap and union shall be connected to 32 mm. dia. waste pipe
which shall be suitably bent towards the wall and which shall discharge into an open
drain leading to a gully trap or direct in to gully-trap on the ground floor and shall be
connected to a waste pipe through a floor trap on the upper floors. C.P. brass trap
and union may not be provided where the surface drain or a floor trap is placed
directly under the basin and the waste is discharged in to vertically.
2.4. The height of the front edge to the wash basin from the floor level shall be
2.5. The necessary inlet, outlet connections and fittings such as pillar cocks, CP dress
waste trap waste pipe, stop cock, chain wish rubber plug etc. shall be fixed.
2.6. The payment of fittings shall be made separately under separate items.
3.0. Mode of measurements & payment
3.1. The rate includes cost of all labour, materials, tool3 and plant etc. required for
satisfactory completion of this item as specified in workmanship.
3.2. The rate shall be for a unit of One number.
Item No.36 Providing and fixing chromium plated brass half turn flush cock of approved quality
including fixing in pipe line etc. complete.
1.0. Materials : Chromium plated brass half turn flush cock shall conform to M-67.
2.0. Workmanship
The hall turn flush cock of specified diameter shall be fixed as directed. The flush
cock shall be fixed in G.I. pipe line with necessary fittings. The joints shall be made
leak proof by using spun yarn and white Zink. The fixing work shall be carried out as
per relevant specifications of item No. 23.2(4).
Signature of Bidder
Ahmedabad Municipal Corporation
3.0. Mode of measurements and payment
3.1. The rate includes cost of all materials and lobour required for satisfactory
completion of this item including fittings.
3.2. The rate shall be for a unit of One number.
Item No.37 Providing and fixing C.P. brass towel rail comlete with C.P. brass brackets fixed to
wooden plugs with C.P. brass scews. (B) 600 mm x 20 mm size.
1.1. The C.P. brass towel rail shall be 600 x 20 mm. of best quality as approved by the
Engineer-in-charge Thebrackets shall be of C.P. brass. The rail shall conform to I.S.
2.0. Workmanship
2.1. The brackets of the towel rail shall be fixed by means of C.P. brass screws to
wooden firmly embedded in the wall with C.M. 1:3 (1 cement : 3 coarse sand). The
towel rail shall be fixed as and where directed.
3.0. Mode of measurements and payment
3.1. The rate includes cost of all labour and materials, tools and plant etc. required
for satisfactory completion of this item.
3.2. The rate shall be for a unit of One number.
Item No.38 Providing and fixing 600 mm x 120 mm glass shelf with C.P. brass bracket and
guard rail complete mixed to wooden plug with C.P.brass screws.
1.1. The C.P. brass towel rail shall be 600 x 20 mm. of best quality as approved by the
Engineer-in-charge The brackets shall be of C.P. brass. The rail shall conform to I.S.
2.0. Workmanship
2.1. The brackets of the towel rail shall be fixed by means of C.P. brass screws to
wooden firmly embedded in the wall with C.M. 1:3 (1 cement : 3 coarse sand). The
towel rail shall be fixed as and where directed.
3.0. Mode of measurements and payment
3.1. The rate includes cost of all labour and materials, tools and plant etc. required
for satisfactory completion of this item.
3.2. The rate shall be for a unit of One number.
Item No.39 Providing and fixing screw down bib taps of following size. (B) Brass chromium
plated screws down Bib Tap.
1.0. Materials and workmanship
The relevant specification of item No. 23.92 (A) (I) shall be followed except that the
brass chromium plated screw down tap of 20 mm. dia. shall be fixed.
2.0. Mode of measurements & payment
2.1. The rate of shall be for a unit of One number.
1.0. Materials and workmanship
The relevant specifications of item No. 23.92 (A) shall be followed except that the
brass chromium plated screw down tap of 20 mm. dia. shall be fixed.
2.0. Mode of measurements & payment
2.1. The rate shall be for a unit of One number.
Signature of Bidder
Ahmedabad Municipal Corporation
Item No.40 Providing and fixing pillar tap, capstan head, screw down high pressure with
screws, shanks and back nuts.
1.0. Materials : The capstan head pillar tap of specified dia. of C.R over brass shall be
best quality and shall conform to I.S. : 1975 - 1961. The pillar taps shall be tested
2.0. Workmanship
2.1. The capstan head pillar tap of specified dia. shall be fixed as directed with
required washers of selected leather or rubber asbestos composition or of plastic as
directed. The cock shall fixed with pipe line white Zink end spun yarn, to make joint
water tight. The work shall be carried out in best workman like manner.
3.0. Mode of measurements and payment
3.1. The rate shall be for a unit of one number.
Item No.41 Providing and fixing ball cock of approved quality as directed. (A) Copper Metal
1.0. Materials :
The ball cock of specified diameter shall conform to M-75
2.0. Workmanship
The ball cock of specified diameter shall be fixed as directed. The fixing of ball cock
shall be carried out as per relevant specification of item No. 23 (A) for joints etc.
3.0. Mode of measurement & payment
3.1. The rate includes-cost of all materials and labour involved for carrying out
satisfactory work.
3.2. The rate shall be for a unit of One number.
Item No.42 Providing laying and jointing in true line and level 15 mm dia. U.P.V.C. Pipe (SCH-
40) for cold water including fittings make PRINCE/SUPREME/ASTRAL/FINOLEX or
equivalent as approved by Engineer In Charge. Pipe shall be fixed on the wall with
the help of clamp at every two metre C/C or shall be concelled as directed
including necessary fittings etc. including testing of pipe and joints and fixing the
same with adhesive solvent, including cost of all materials.
The rate shall be for a unit of on rmt.
Item No.43 Providing laying and jointing in true line and level 25 mm dia. U.P.V.C. Pipe (SCH-
40) for cold water including fittings make PRINCE/SUPREME/ASTRAL/FINOLEX or
equivalent as approved by Engineer In Charge. Pipe shall be fixed on the wall with
the help of clamp at every two metre C/C or shall be concelled as directed
including necessary fittings etc. including testing of pipe and joints and fixing the
same with adhesive solvent, including cost of all materials.
The rate shall be for a unit of on rmt.
Item No.44 Providing cement vata (10 cm x 10 cm size) quarter round in cement mortar 1:1
including neat cement finishing, watering etc. complete.
1.1. Water shall conform to M-1 .Cement mortar shall conform to M-11.
2.0. Workmanship
2.1. The work of cement vata of 10 cms x 10 cms. size shall be earned out at
Functions of parapets and terraces as directed. The vata shall he finished in quarter
round shape. The work shall be earned out in the nest workman like manner. The
Signature of Bidder
Ahmedabad Municipal Corporation
inter portion of rain water pipe shall be rounded off properly during constructing the
vata. The work shall be cured for 7 days.
3.0. Mode of measurements and payment
3.1. The work shall be measured for finished item in running meter.
3.2. The rate shall be for a One running meter.
Item No.45 Making Water connection from exi.Muni. Water line (N.S.)
Making connections to the Ex. Muni.Water line of any dia pipes at any convenient
time when Water line is found empty. All damage work shall be well repair
instructions etc. comp.
The pipes of any dia and any material shall be cut as per requirement to make
connection in existing Water line. as per requirement and making good the same.
The dis-mental materials shall be carried to places at all lead as directed by Engineer-
in-charge. If directed the work shall have to be done at night.
The measurement, shall be as per No. basis.
Item No.46 Providing and Fixing 1 H.P. Electrical monoblock or submarcible water pumps with
motor and required cable and switch board of approved brand and make
etc.comp.as directed.
Mode of Measurement shall be on set Basic.
Item No.47 Providing TMT Bar FE 415 reinforcement for R.C.C. work including bending, binding
and placing in position complete up to floor two level (up to 10 ton)
Thermo Mechanically Steel bars shall conform to M-19. Mild steel binding wires
shall conform to M-21.
The work shall consist of furnishing and placing reinforcement to the shape and
dimensions shows as on the drawings or as directed.
Steel shall be clean and free from rust and loose mill scale at the time of fixing in
position and subsequent concreting.
Reinforcing steel shall conform accurately to the dimensions given in the bar
bending schedules shown on relevant drawings. Bars shall be bent cold to specified
shape and dimensions or as directed using a proper bar bender, operated by hand or
power to attain proper radius of bends. Bars shall not be bent or straightened in a
manner that will injure the material. Bars bent during transport or handling shall be
straightened before being used on the work. They shall not be heated to facilitate
bending. Unless otherwise specified, a ‘U’ type hook at the end of each bar shall
invariably be provided to main reinforcement. The radius of the bend shall not be
less than twice the diameter of the round bar and the length of straight part of the
bar beyond the end of the curve shall be at least four times the diameter of the
round bar. In case of bars, which are not round, and in case of deformed bars, the
diameter shall be taken as the diameter of circle having an equivalent effective area.
The hooks shall be suitably encased to prevent any splitting of the concrete.
All the reinforcement bars shall be accurately placed in exact position shown on
the drawing and shall be securely held in position during, metal hangers, supporting
wires or other approved devices at sufficiently close intervals,. Bars shall not be
allowed to sag between supports nor displaced during concreting or any other
operations of the work. All devices used for positioning shall be of non-corrodible
Signature of Bidder
Ahmedabad Municipal Corporation
material. Wooden and metal supports shall no extend to the surface of concrete,
except where shown on drawings. Placing of broken stone or brick and wooden
blocks shall not be allowed. Pieces of broken stone or brick and wooden blocks shall
not be used. Spacer bars, precast mortar blocks or other approved devices, shall
separate layers of bars. Reinforcement after being placed in position shall be
maintained in a clean condition until completely embedded in concrete. Special care
shall be exercised to prevent any displacement of reinforcement in concrete already
placed. To prevent reinforcement from corrosion, concrete cover shall be provided
as indicated on drawings. All the bars producing from concrete and to which other
bars are to be spliced and which are likely to be exposed for a period exceeding
days shall be protected by a thick coast of neat cement grout.
Bars crossing each other where required shall be secured by binding wires
(annealed) of size not less than 1 mm in such manner that they do not slip over each
other at the time of fixing and concreting.
As far as possible, bars of full length shall be used. In case this is not possible,
overlapping of bars shall be done directed. When practicable, overlapping bars shall
not touch each other, but be kept apart by 25 mm or 1.25 mm times the maximum
size of the coarse aggregate whichever is greater by concrete between them. Where
not feasible, overlapping bars shall be bound with annealed wires not less than 1 mm
thick twisted tight. The overlaps shall be staggered for different bears and located at
points along the span where neither shear nor bending movement is maximum.
Whenever indicated on the drawings or desired by the Engineer-in-charge, bars
shall be joined by couplings, which shall have a cross-section sufficient to transits the
full stresses of bars. The ends of the bars that are joined by coupling shall be upset
for sufficient length so that the effective cross section at the base of threads is not
less than normal cross-section of the bar. Threads shall be standard threads. Steel for
coupling shall conform to I.S.
When permitted or specified on the drawings, joints of reinforcement bars shall
be butt-welded so as to transmit their full stresses. Welded joints shall preferably be
located at points when steel will not be subject to more than 75 percent of the
maximum permissible stresses and welds so staggered that at any one section not
more than 20 percent of the rods are welded. Only electric are welding using a
process which excludes air from the molten metal and conforms to any or all other
special provisions for the work shall be accepted. Suitable means shall be provided
for holding bars securely in position during welding. It shall be ensured that no voids
are left in welding and when welding is done in two or three stages, previous surface
shall be cleaned properly. Ends of the bars shall be cleaned of all loose scale, rust,
grease, paint and other foreign matter before welding. Only competent welders shall
be employed on the work. the M.S. electrodes used for welding shall conform to I.S.
814. Welded pieces of reinforcement shall be tested. Specimen shall be taken from
the actual site and their number and frequency of test shall be as directed.
Mode of measurement and payment :
For the purpose of calculation consumption, wastage shall not be
permitted beyond 5 percent Excess consumption over 5 % will be charged at penal
rate. Reinforcement shall be measured in length including overlaps, separately for
different diameters as actually used in the works.
Signature of Bidder
Ahmedabad Municipal Corporation
Where welding or coupling is resorted to in place of lap joints such joints
shall be measured for a pimento as equivalent length of overlap as per design
requirement. From the length so measured, the weight of reinforcement shall be
calculated in tones on the same basic of as per M-18 even though steel is supplied to
the contractor by the department on actual weight Length shall include hooks at the
ends. Wastage and annealed steel wire for binding shall not be measured and the
cost of these items shall be deemed to be included in the rate for reinforcement.
The rate shall be for a unit One Kg.
Item No.48 Conveyance charge of Earth, Lime, Murrum, building rubbish earch manure or
sludge and excavated rock and fly ash, aggregate of any kind etc. comp. upto 5 km
The surplus earth, which is left on site after refilling and proper watering of the
trenches, shall hacartcarted away up to a distance within lead upon 5 kmts. All
surplus earth should be carted away immediately after the instruction or orders of
the engineer in charge. The surplus earth shall be spread at the site shown where it
The measurement of the surplus earth shall be paid for as per arithmetical
calculations. Nothing extra shall be paid for the bulk age of the excavated earth.
The rate shall be for a unit of one Cmt.
Item No.49 Providing and fixing S.W. gully trap with C.I. grating brick masonry chamber and
water tight C.I. cover with frame of 300mm x 300mm size (inside) with standard
weight.(i) Square mouth traps. (B) 150mm x 100mm size P or R type
1.0. Materials : (t) Water shall conform to M-1. (2) Cement mortar of proportion 1:5
shall conform to M-11. (3) Burnt brick shall conform to M-15. (4} The S.W. Galley
trap of 100 mm. x 100 mm. size shall confirm to .M-70.
2.0. Workmanship
2.1. Excavation for gulley trap shall be done true to dimensions and levels as
indicated on plans or as directed. The excavation work shall generally be done as per
relevant specifications of item 4.0.0.of earth work.
2.2.1. The gully trap shall be fixed over cement concrete 1:5:10 (I cement : 5 sand :
10 graded brick bats aggregate 40 mm nominal size) foundation. 650 square and
mm. thick The depth of top of concrete below the ground level shall be 675 mm. The
jointing of gulley outlet to the branch drain shall be done similar to jointing of S.W.
pipe ac; described in item No. 24.1 (A).
2.3. Brick masonry chamber : After fixing and testing gulley and branch drain, a brick
masonry 300 x 330 mm. inside with bricks in CM 1:5 (1 cement : 5 sand) shall be built
with a 100 mm. brick work round OH; gulley trap from the top of bed concrete up to
ground level. The space between the chamber walls and the trap shall be filled with
cement concrete 1:5:10. The upper portion of the chamber i.e. above the top level of
the trap shall be plastered inside with cement mortar 1:3 (1 cement: 3 sand) finished
with floating coat of neat cement. The corners and bottom of the chamber shall be
rounded of so as to slope towards the grating.
2.4. C.I. cover with frame 300 mm, x 300 mm. (inside) size shall then be fixed on the
top of the brick masonry with C.c. 1:2:4 ( 1 lent : 2 coarse sand : 4 graded aggregate
20 mm. nominal size) 40 mm. thick and rendered smooth. The finished top of the
Signature of Bidder
Ahmedabad Municipal Corporation
cover shall be left about 40 mm. above the adjoining ground level so as to exclude
the surface water from entering the gulley trap.
3.0. Mode of measurements & payment
3.1. The rate includes cost of all labour, materials, tools and plant etc. required for
satisfactory completion of this item as described above.
3.2. The rate shall be for a unit of one number basis.
Item No.50 CatchPit Jali Fixing P/F FRC catch pit jali with frame 600mm x 600mm clear opening
etc. comp. As directed by engineer in charge. (Based on Central Store Rate)
CatchPit Jali (Heavy duty) Fixing P/F FRC catch pit jali with frame 600mm x 600mm
clear opening etc. comp.. The cover and frame both are in heavy duty. No extra cost
for the fitting of frame and cover and carting and lifting will given.
M/s. shall be on No basis.
Item No.51 Constructing Chamber of following size including excavation, refilling, BBCC
(1:5:10) for foundation, C.C. Channel (1:2:4), finished 15 mm thick cement plaster
inside in CM 1:3, finishing with cement slurry, Brick masonary in CM 1:5 &
excluding the cost of chamber seat cover etc. completed. (Based on Drainage SOR
(a) 0.60 X 0.45 mt. size Inside Clear, Depth from 0.0 to 0.90meter for pipe dia
(b) 0.60 X 0.75 mt. size Inside Clear, Depth from 0.0 to 0.90meter for pipe dia <=20
(c) 0.75 X 0.75 mt. size (Inside Clear) Depth from 0.0 to 1.20 meter for pipe dia
The sewet trench shall be excavated to the alignment and gradient shown on the
plan and section. In all storts soil including oil masonary asphalt roads and wet.
excavation . The sewer excavation shall be commenced at the down stream end of
the sewer and be continued upto the gradient as directed. The trench shall not open
more than 60 meters in advace of the completed sewer only when directed by the
Engineer in charge looking to the progress of the work in obtaining the formation of
the bottom of the trenches the usual methods of suing sight rails and bonning roads
shall be adopted during the whole of the process. The center line of uniform height
shall be carried clearly on each rail. The depth of the excavation and invert of the
sewer shall be checked by means of bonning road of appropriate length and also
The bed of the trench be shall well remmed before starting laying of sewer ines and
cement concrete and masonary work.
Where trenches are deep in bad grounds the sides shall be supported by suitable
imbering of shorting work looking to the nature of soil near big or important
structures, the sides of the trenches shall be closely and securely timbered. If any
settlement of the building is anticipated the timbering shall be left in the ground. The
various materials excavated shall be separately stacked so that in refilling the may be
relaid on the same order as before and least possible damage shall be done carpet
on the public roads and private properties. Surface covering consisting of asphalt
carpet shall be kept on one side and preserved for reinstatement. The excavated
Signature of Bidder
Ahmedabad Municipal Corporation
earth shall not heaped near the trenchers so as to caused unnecessary obstruction
along the pulling inspection, trenches etc. shall be tunneled under only as necessary.
The side of the trenches shall be nearly vertical and plumb & red light shall be placed
at each end at intervals as instructed and further protested by rope fence. Necessary
caution boards shall also be erected and diaced as directed by the Engineer in
Wherever possible material excavated from the trenches of whatever kind shall not
placed nearer than 3 meters from the outer edge of the excavated trench. The
utmost shall have to be taken in refilling the trenches so that no damage may be
done no sewer no lump shall be allowed to be put around the sewer. The remming
of the filling shall be done and well watered. The surplus earth shall be removed
directed within 30 meters lead. The measurement of the work shall be exact length
and width of the trench as specified or as per City Engineer instruction and depth
shall be measured vertical as per section upto invert or the pipe lind The City
Engineer reserves the right of extra excavation on either side if considers necessary
for the safely of the work.
The bottom and sides of the trench shall be dressed in level and plumb in all
directions before any concrete in India. In case the excavation is done deeper than
required no filling shall be allowed to bring the formation to proper level but
contractor shall have to lay cement or lime be concrete of filling or other acceptable
materials as directed by C.E. at contractor won cost so as to come to proper
information, in case bas formation are met with the work shall have be done as per
instruction of C.E. necessary arrangements for watering trenches must be provided
be contractor and without proper watering trenches will not be allowed to be tilled
to further. Contractor shall have to make arrangement for acees to invert of the
sewer and for inspection of the ware as ordered by the Engineer. If is required to
shired or after the alignment section of diameter of the pip the contractor shall carry
or altered the alignment section or diameter of the pipe the contractor shall carry
out the altered work at the rates quoted by him for the original work for items and
contractor shall not claim any expenses due to the changes made.
In case no work shall be done at night or on Sundays & other holidays and during the
recess time except in and other holiday the case of bad grounds such as running sand
where the work must be executed various day night without intruption when so
ordered by the Engineer.
All existing water pipe storm drains sewer line railway tract, electric cables etc. which
do not in the opinion of Engineer required to be charged in location shall be
supported and protected from injury by the contractor. The contractor shall be liable
to pay all damages to water pipe, drains electric and telephone cables and to private
property during the execution of this contract and the same will be recovered from
the running bills or thedeposit of work whenever it becomes necessary in the
opinion of the Engineer in charge location of any existing sewers drains etc. not
otherwise from in these specification the contractor shall do the work of making
such change and the work shall be paid for as extra work. All places of public utility
etc. shall be kept accessible for use.
No extra payment shall be made for land sides and side slopes done without prior
approval of the Engineer in charge.
Signature of Bidder
Ahmedabad Municipal Corporation
Wherever natural soil commends winder excavation the mentioned above the same
shall be given after approved C.E. The rate for excavation for easy jointing and
caulking nothing extra shall be paid for this.
Refilling of trenches shall be done only after the grade of line and hydraulic test
practicable of the lines are checked and approved of and order given by the Engineer
in charge. The refilling shall be accompanied by through watering the layers of
metrs. Further refilling shall be done there after and process should be repeated till
trenches are completely refilled. Temping and ramming with rammers shall have to
be done at all place of important work where ordered by Engineer in charge. After
the trench is give the trenches shall have to be refilled within 4 days with complete
watering. If the contractor fails to do watering satisfactory corporation shall get it
done at the risk and cost of the contractor with or without giving any notice and the
expenses incurred in doing so recovered from the contactor either in cost or from his
payment through bills.
The brickbats shall be of new bricks, hared well burnt and broken to 40 mm nominal
size. These shall be free from earth and shall be got app. use. Sand shall be clear
coarse, sharp and free from earth and other impurities. Mixing shall be done on brick
or stone platform or of brickbats to mortar shall be measured in heaps by brick
height irregular measure. If ordered by C.E.
Concrete shall be laid in layers of 15 cms. and well consolidated maintained by the
contractor for before commencing the brick work. over boxes, concrete shall be well
watered. The mix shall be done in prop. of 1 : 5 :
Cement shall confirm to M-3, sand shall confirm to M-6, coarse agg. shall confirm to
M-13, water shall confirm M-1.
The prop. of the cement of sand coarse agg. shall be 1 : 5 : 10 i.e. 1 part of cement,
part of sand and 10 parts of coarse agg. by volume. and the work shall be carried out
as per inst. of Engineer in charge and as per C.3.
Brick work cement mortar :
Bricks shall be table brick confirming of approved kiln specifications as laid sown n
PWD Hand book NO. 2. These shall be well burnt and free from all defects and shall
be got approved by the Engineer in charge before the work is started. Cement to be
used for mortar shall comply with PWD Hand book specifications, cement mortar in
the brick work shall be 1 part of cement, 5 parts of sand. Every brick well sacked in
water is required to be laid I full & closed joints of cement mortar the thickness of
which shall not exceed 1.25 cms. If on removal of centering any open joint shall be
found, these shall be pointed immediately. Special care shall taken to make the face
of brick work smooth brick work shall be toothed or shall racked back in coarse.
All intrades of curves shall be worked from temple strictly made to dimensions as per
1974-75 latest plan and section approved by C.E.
Brick work in general shall be of first class workmanship & shall be executed
according to the plan working proper dimention & as directed by the Office in charge
from time to time. Brick should be thoroughly wetted in water before use. All brick
work to be cleaned & wetted before laying cement mortar shall be prepared in
special iron pals. And mixed bag of 1.25 cft. or 1 cft. as measured as the case may be.
Signature of Bidder
Ahmedabad Municipal Corporation
All materials shall be stacked in one side so as not to obstruct traffic in any way. The
masonry should be constructed in proper workmanship like manner with jointing
plumb etc. to confirm with the general specification No. 45 PWD Hand Book. The
face work should be nearly finished. The shall be kept watered for a week at least
three days after the date of completion.
Providing and laying cement concrete 1:2:4
(1 cement :2 coarse sand :4 graded stone aggregate 20 mm nominal size)
RCC Work :- In general, plain and reinforced concrete work for manholes shall be
carried out in accordance with latest version of IS 456 unless otherwise specified in
this specification. The slab of manhole shall be cast with shutters lined with plywood
and shall be smooth finished. For avoiding surface cracks due to variation in
atmospheric temperature and exposure to direct sunlight, RCC slab of manholes
after casting shall be kept wet. M 15 grade of concrete used for construction of RCC
manholes shall have minimum cement content of 360 kg/cum of concrete. Bar
bending schedule for reinforcement shall be prepared by contractor and got
approved from owner/ engineer before proceeding with the work. Minimum cover
to the reinforcement shall be 40 mm.
The rate includes cost of all labour, materials, tools and plant etc. required for
satisfactory completion of this item as described above.& the drawing as per A.M.C
Dr. S.O.R shall be final. The rate shall be for a unit of one number basis.
Providing TMT bar.
TMT bars shall conform to M-18. Mild steel binding wires shall conform to M-21
The work shall consist of furnishing and placing reinforcement to the shape and
dimensions shows as on the drawings or as directed.
Steel shall be clean and free from rust and loose mill scale at the time of fixing in
position and subsequent concreting.
Reinforcing steel shall conform accurately to the dimensions given in the bar bending
schedules shown on relevant drawings. Bars shall be bent cold to specified shape
and dimensions or as directed using a proper bar bender, operated by hand or
power to attain proper radius of bends. Bars shall not be bent or straightened in a
manner that will injure the material. Bars bent during transport or handling shall be
straightened before being used on the work. They shall not be heated to facilitate
bending. Unless otherwise specified, a ‘U’ type hook at the end of each bar shall
invariably be provided to main reinforcement. The radius of the bend shall not be
less than twice the diameter of the round bar and the length of straight part of the
bar beyond the end of the curve shall be at least four times the diameter of the
round bar. In case of bars which are not round and in case of deformed bars, the
diameter shall be taken as the diameter of circle having an equivalent effective area.
The hooks shall be suitably encased to prevent any splitting of the concrete.
All the reinforcement bars shall be accurately placed in exact position shown on the
drawing and shall be securely held in position during, metal hangers, supporting
wires or other approved devices at sufficiently close intervals,. Bars shall not be
allowed to sag between supports nor displaced during concreting or any other
operations of the work. All devices used for positioning shall be of noncorrodible
material. Wooden and metal supports shall no extend to the surface of concrete,
Signature of Bidder
Ahmedabad Municipal Corporation
except where shown on drawings. Placing of broken stone or brick and wooden
blocks shall not be allowed. Pieces of broken stone or brick and wooden blocks shall
not be used. Layers of bars shall be separated by spacer bars, precast mortar blocks
or other approved devices. reinforcement after being placed in position shall be
maintained in a clean condition until completely embedded in concrete. Special care
shall be exercised to prevent any displacement of reinforcement in concrete already
placed. To prevent reinforcement from corrosion, concrete cover shall be provided
as indicated on drawings. All the bars producing from concrete and to which other
bars are to be spliced and which are likely to be exposed for a period exceeding
days shall be protected by a thick coast of neat cement grout.
Bars crossing each other where required shall be secured by binding wires
(annealed) of size not less than 1 mm in such manner that they do not slip over each
other at the time of fixing and concreting.
As far as possible, bars of full length shall be used. In case this is not possible,
overlapping of bars shall be done directed. When practicable, overlapping bars shall
not touch each other, but be kept apart by 25 mm or 1.25 mm times the maximum
size of the coarse aggregate whichever is greater by concrete between them. Where
not feasible, overlapping bars shall be bound with annealed wires not less than 1 mm
thick twisted tight. The overlaps shall be staggered for different bears and located at
points along the span where neither shear nor bending movement is maximum.
Whenever indicated on the drawings or desired by the Engineer- in-charge, bars shall
be joined by coup lings which shall have a cross-section sufficient to transpit the full
stresses of bars. The ends of the bars that are joined by coupling shall be upset for
sufficient length so that the effective cross section at the base of threads is not less
than norma l cross-section of the bar. Threads shall be standard threads. Steel for
coupling shall conform to I.S.
When permitted or specified on the drawings, joints of reinforcement bars shall be
butt-welded so as to transmit their full stresses. Welded joints shall preferably be
located at points when steel will not be subject to more than 75 percent of the
maximum permissible stresses and welds so staggered that at any one section not
more than 20 percent of the rods are welded. Only electric are welding using a
process which excludes air from the molten metal and conforms to any or all other
special provisions for the work shall be accepted. Suitable means shall be provided
for holding bars securely in position during welding. It shall be ensured that no voids
are left in welding and when welding is done in two or three stages, previous surface
shall be cleaned properly. Ends of the bars shall be cleaned of all loose scale, rust,
grease, paint and other foreign matter before welding. Only competent welders shall
be employed on the work. the M.S. electrodes used for welding shall conform to I.S.
814. Welded pieces of reinforcement shall be tested. Specimen shall be taken from
the actual site and their number and frequency of test shall be as directed.
R.C.C. Bedding :
Cement concrete for the bottom portion of manhole shall consist of one part of
cement two parts of sand four parts of black trap metal of other approved material
of 0.6 to 2.5 cms size from well graded as per instruction. The rate includes all
necessary materials mixing lifting placing ramming watering etc. the exposed faces
to be neatly finished smooth with cement as per instructions. The concrete work to
kept constantly watered for at least fortnight.
Signature of Bidder
Ahmedabad Municipal Corporation
Cement Plaster :
Cement plaster 15 mm thick shall be done using cement mortar of 1 part of cement
& 3 parts of sand in uniform thickness with surfaces trely in plums. The work in
general shall comply with general specifications for plaster No. 64 in PWD hand
book. The plaster surfaces to be kept damp at least for a fortnight. All internal sides
of the manholes including soffit of the arch shall be provided with cement plaster.
FRC manhole cover with seat to be set in cement mortar with cement concrete of 1 :
2 : 4 prop. alround. FRC cover shall be marked with year mar AMC. etc. & arrow
showing the direction of flow.
Foot steps shall be of the best quality PVC as specified above true to dimensions.
The rate includes mixing the same in position as directed PVC foot steps of approved
design and quality shall have to be fixed if so ordered by C.E. without extra charges.
PVC steps shall be fixed at interval of 37 cm. vertically & 22 cm. horizontally starting
from the invert of the line.
Mode Measurment
The mode of measurement shall be on Nos.
Item No.52 Dismantling of existing Arch type manhole up to Arch and then Const. Slab type
manhole of following size incl. excavation, refilling and & finished 15 mm thick
cement plaster inside in CM 1:3, P/F 4 mm dia M.S.Steel HDPE coated steps 35 cm
c/c at 35 cm staggered in masonry CM 1:5, incl. cost of RCC Slab in CC 1:1.5:3,
including Cantering & reinforcement as directed by engineer in charge. Rate
includes carting of debris and excavated soil.
(a) 1.00 x 0.75 mt (inside clear) RCC Slab of thickness 15 C.M. & reinforcement
(Single jalli at 15 C.M. c/c bothway 10 mm dia.) From 0 to 2 mt depth (Slab at
(1) Water shall conform to M-1. (2) Cement mortar of proportion 1 : 5 shall conform
to to M-11. (3) Burnt brick shall conform to M-15. (4) The S.W. Gulley trap of
mm. x 10-0 mm. size shall conform to M-70.
Excavation for gulley trap shall be done true to dimensions and levels as indicated on
plans or as directed. The excavation work shall generally be done as per relevant
specification of earth work.
The gulley trap shall be fixed over cement concrete 1 : 5 : 10 (1 cement : 5 sand :
graded brick bats aggregate 40 mm. nominal size) foundation, 650 mm. square and
100 mm. thick. The depth of top of concrete below the ground level shall be
mm. The jointing of gulley outlet to the branch drain shall be done similar to jointing
of S. W. pipe as described in item No. 24.1 (A).
Brick masonry chamber : After fixing and testing gulley and branch drain,
a brick masonry 300 x 300 mm. inside with bricks in C. M. 1 : 5 (1 cement : 5 sand)
shall be built be built with a 100 mm. brick work round the gully trap from the top of
bed concrete upto ground level. The space between the chamber walls and the trap
shall be filled with cement concrete 1 : 5 : 10. The upper portion of the chamber i.e.
above the top level of the trap shall be plastered inside with cement mortar 1 : 3 (1
Signature of Bidder
Ahmedabad Municipal Corporation
cement : 3 sand) finished with floating coat of neat cement. The corners and bottom
of the chamber shall be rounded of so as to slope towards the grating.
Fixing FRC G.T. round cover with frame incl. fixing the same.
Mode of measurements & payment :
The rate includes cost of all labour, materials, tools and plant etc. required for
satisfactory completion of this item as described above.The rate shall be for a unit of
one number basis.
Item No.53 Providing and supplying ISI marked only Standard length Stoneware pipes in
standard lengths of following class and diameter including all taxes, insurance,
transportation, freight charges, octroi, inspection charges, loading, unloading,
conveyance to departmental stores, stacking etc. (IS - 651 / 1989)
The pipes shall be of best quality stone ware pipes. The pipes shall be of approved
quality and make and shall be brought on site after approval. (The pipes shall be laid
in grade as per instruction) contractor shall have introduce bills for standard
pipes.The joints shall be done in cement prop. (1 : 1) (1 part cement : 1 part sand)
using spun yarn dispend in hot asphalt and caulking tools. The hydraulic pressured
test shall be given be the contractor for testing pipes and jointing. No. trenches shall
be filed without the approval of the Engineer in charge. The rate of the pipes work
are inclusive of excavation and refilling. The excavation etc. shall be done as follows :
The sewet trench shall be excavated to the alignment and gradient shown on the
plan and section. In all storts soil including oil masonary asphalt roads and wet.
excavation . The sewer excavation shall be commenced at the down stream end of
the sewer and be continued upto thegradient as directed. The trench shall not open
more than 60 meters in advace of the completed sewer only when directed by the
Engineer in charge looking to the progress of the work in obtaining the formation of
the bottom of the trenches the usual methods of suing sight rails and bonning roads
shall be adopted during the whole of the process. The center line of uniform height
shall be carried clearly on each rail. The depth of the excavation and invert of the
sewer shall be checked by means of bonning road of appropriate length and also
straight edge. The bed of the trench be shall well remmed before starting laying of
sewer lines and cement concrete and masonary work. Where trenches are deep in
bad grounds the sides shall be supported by suitable timbering of shorting work
looking to the nature of soil near big or important structures, the sides of the
trenches shall be closely and securely timbered. If any settlement of the building is
anticipated the timbering shall be left in the ground. The various materials excavated
shall be separately stacked so that in refilling the may be relaid on the same order as
before and least possible damage shall be done carpet on the public roads and
private properties. Surface covering consisting of asphalt carpet shall be kept on one
side and preserved for reinstatement. The excavated earth shall not heaped near the
renchers so as to caused unnecessary obstruction along the pulling inspection,
Signature of Bidder
Ahmedabad Municipal Corporation
trenches etc. shall be tunneled under only as necessary. The side of the trenches
shall be nearly vertical and plumb & red light shall be placed at each end at intervals
as instructed and further protested by rope fence. Necessary caution boards shall
also be erected and diaced as directed by the Engineer in charge. Wherever possible
material excavated from the trenches of whatever kind shall not placed nearer than
3 meters from the outer edge of the excavated trench. The utmost shall have to be
taken in refilling the trenches so that no damage may be done no sewer no lump
shall be allowed to be put around the sewer. The remming of the filling shall be done
and well watered. The surplus earth shall be removed directed within 30 meters
lead. The measurement of the work shall be exact length and width of the trench as
specified or as per City Engineer instruction and depth shall be measured vertical as
per section upto invert or the pipe lind The City Engineer reserves the right of extra
excavation on either side if considers necessary for the safely of the work. The
bottom and sides of the trench shall be dressed in level and plumb in all directions
before any concrete in India. In case the excavation is done deeper than required no
filling shall be allowed to bring the formation to proper level but contractor shall
have to lay cement or lime be concrete of filling or other acceptable materials as
directed by C.E. at contractor won cost so as to come to proper information, in case
bas formation are met with the work shall have be done as per instruction of C.E.
necessary arrangements for watering trenches must be provided be contractor and
without proper watering trenches will not be allowed to be tilled to further.
Contractor shall have to make arrangement for acees to invert of the sewer and for
inspection of the ware as ordered by the Engineer. If is required to shired or after the
alignment section of diameter of the pip the contractor shall carry or altered the
alignment section or diameter of the pipe the contractor shall carry out the altered
work at the rates quoted by him for the original work for items and contractor shall
not claim any expenses due to the changes made. In case no work shall be done at
night or on Sundays & other holidays and during the recess time except in and other
holiday the case of bad grounds such as running sand where the work must be
executed various day night without intruption when so ordered by the Engineer. All
existing water pipe storm drains sewer line railway tract, electric cables etc. which
do not in the opinion of Engineer required to be charged in location shall be
supported and protected from injury by the contractor. The contractor shall be liable
to pay all damages to water pipe, drains electric and telephone cables and to private
property during the execution of this contract and the same will be recovered from
the running bills or the deposit of work whenever it becomes necessary in the
opinion of the Engineer in charge location of any existing sewers drains etc. not
otherwise from in these specification the contractor shall do the work of making
such change and the work shall be paid for as extra work. All places of public utility
etc. shall be kept accessible for use. No extra payment shall be made for land sides
and side slopes done without prior approval of the Engineer in charge. Wherever
natural soil commends winder excavation the mentioned above the same shall be
given after approved C.E. The rate for excavation for easy jointing and caulking
nothing extra shall be paid for this.
Refilling of trenches shall be done only after the grade of line and hydraulic test
practicable of the lines are checked and approved of and order given by the Engineer
in charge. The refilling shall be accompanied by through watering the layers of
Signature of Bidder
Ahmedabad Municipal Corporation
metrs. Further refilling shall be done there after and process should be repeated till
trenches are completely refilled. Temping and ramming with rammers shall have to
be done at all place of important work where ordered by Engineer in charge.
After the trench is give the trenches shall have to be refilled within 4 days with
complete watering. If the contractor fails to do watering satisfactory corporation
shall get it done at the risk and cost of the contractor with or without giving any
notice and the expenses incurred in doing so recovered from the contactor either in
cost or from his payment through bills.
The rate shall be for a unit of one Rmt basis.
Item No.55 Providing & laying S.W. Gully trap with brick masonry chamber & water tight G.T.
Stone including fixing of cover Square mouth trap 100 mm x100 mm size P-Trap.
As per relavent Specifications.
The rate shall be for a unit of no. basis.
Seal and Signature of the Bidder Addl. City Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder
Ahmedabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPT.
Name of Work :- bægÍtul Ntnvwh Jtuzobtk ykfjuµhegtle atje, djtSle atje lk.2, djtSle
atje lk.3, Atuxtjtjle atjebtk MJåA Cth< rbNl yk<od< xtugjux hevuh fhJtlt ftb ctc<.
Qty. Items Per Amount Rs.
Excavation for foundation up to
1.5 m depth including sorting out
and stacking of useful materials
70.00 and disposing of the excavated
stuff upto 50 Meter lead. (A) Loose
Providing and laying cement
concrete 1:4:8 (1-Cement: 4-
coarse sand: 8-handbroken stone
2 aggregates 40 mm nominal size) 2653.67 Cmt
and curing complete excluding
cost of formwork in (A) Foundation
and Plinth (upto 10 ton).
Brickwork using common burnt
clay building bricks having
crushing strength not less than
35kg./Sq.Cm. in foundation and
plinth in Cement Mortar 1:6 (1-
Cement: 6-fine sand)
a (A) Conventional (upto 10 ton) 3981.21 Cmt
Extra Rate for brickwork in Above
4 Item for super structure above -
plinth level upto floor two level.
a (A) Conventional (upto 10 ton) 272.25 Cmt
Providing and Laying ordinary
cement concrete 1:2:4 (1-Cement:
2-coarse sand: 4-graded stone
aggregates 20 mm nominal size)
and finishing smooth with curing
7.00 etc. complete including the cost of
form work but excluding the cost of
reinforsement for R.C.C work in
(iv) Slabs having more than 13 cm
and upto 15 cm.thickness.
Half brick masonry in common
brunt clay building bricks having
crushing strength not less than
6 Kg/Sq.Cm. in Cement mortar 1:5 583.49 Smt
(1-Cement: 5-coarse sand) in
foundation and Plinth conventional
brickwork (up to 10 ton)
Extra for half brick masonry in
super structure above plinth level
30.00 upto floor two level (B)
Signature of Bidder
Ahmedabad Municipal Corporation
Providing formwork in ordinary
timber planking so as to give a
rough finish including centering,
shuttering, strutting and propping
etc. height of propping and
centering below supporting floor to
celling not exceeding 4m &
removal of the same for in situ
reinforced or plain concrete work
upto floor four level
Foundation, footings, bases of
100.00 columns etc. and mass concrete.
(B) Flat surfaces such as soffits of
supspened floors slabs Landings
50.00 and the like. (1) Floors etc. upto
200 mm in thickness.
Providing & fixing Steel door with
Shutter for steel sheet 18 Gauge,
and angel and 40 x 40 x 3 mm and
steel doors frame of size 40 x 40 x
9 5 mm incl. anodised Iron butt 2410.71 Smt.
hinges and nece.fitting and
fastening with necessary
screws.Rate also incl. two coats of
oil paint etc comp.(N.S.)
Providing and laying white glazed
tiles 6mm thick in flooring treads of
steps and landing laid on a bed of
70.00 12mm thick cement mortar 1:3 (1-
cement : 3-coarse sand ) finishing
with flush pointing in white cement.
Providing and laying white glazed
tiles 6 mm thick in skrting risers of
steps and dedo on 10 mm thick
70.00 cement plaster 1:3 (1-cement : 3-
coarse sand) and jointed with
white cement slurry.
Providing and laying polished Kota
stone slab flooring over 20 mm
(Average) thick base of cement
mortar 1:6 (1-cement: 6-coarse
sand) or L.M.1.1.5 (1-Lime putty:
12 1.5-coarse sand laid over and 982.83 Smt
jointed with grey cement slurry
mixed with pigment to match the
shade of slab including rubbing
and polishing etc. complete. (A)
mm thick (upto 10 ton)
Providing and laying cement
concrete flooring 1:2:4 (1-cement:
2-coarse sand: 4-graded stone
13 aggregate 20 mm nominal size) 297.68 Smt
laid in one layer and finished with
a floating coat of neat cement. (A)
40 mm thick. (upto 10 ton)
Signature of Bidder
Ahmedabad Municipal Corporation
Providing and laying broken
china mosaic flooring for terrace
using 12 mm to 20 mm broken
pieces of glazed tiles to be laid
over cement mortar 1:3 to plain or
slope and to be tempered to bring
30.00 mortar creme out upto surface
using white cement including
rounding off junctions and
extending them upto 15 cm along
the wall, clearing with water and
oxalic acid etc. as directed.
Providing and laying coloured
glazed tiles of the size 300 mm x
mm x 8 mm in skirting, risers of
23.00 steps and dedo on 10 mm thick
cement plaster 1:3 (1-cement: 3-
coarse sand) & jointed with white
Providing 15 mm thick cement
plaster in single coat on Rough
(Similar) side of single or half brick
16 walls for interior plastering up to 174.83 Smt
floor two level and finished even
and smooth in (i) Cement mortar
1:3 (1-cement: 3-sand)
Providing 20 mm thick sand faced
cement plaster on walls upto
height 10 metres above ground
level consisting of 12mm thick
50.00 backing coat of C.M. 1:3 (1-
cement : 3-sand) and 8mm thick
finishing coat of C.M. 1:1 (1-
cement : 1-sand) etc. complete.
Distempeing (Two coats) with oil
bound distemper of approved
brand and manufacture and of
required shade on wall surfaces to
give an even shade, over and
including a priming coat with
18 distemper primer of approved 76.08 Smt
brand and manufacture after
thoroughly brushing the surface
free from mortar dropping and
other foreign matter and also
including preparing the surface
even and sand papered smooth.
Finishing wall with Apex Ultima
Acrylic paint of " Asian Paint " on
wall surfaces (two coats) to give
required even shade after
application of Exterior Primer of
100.00 Approved Brand & Manufacturers
after thoroughly brushing the
surface to remove all dirt &
remains of loose powdered
materials. (N.S.)
Signature of Bidder
Ahmedabad Municipal Corporation
Finishing wall with weather proof
exterior emulsion paint on wall
surface (two coats) to give an
required shape even shade after
100.00 thoroughly brushing the surface to
remove all dirt and remains of
loose powdered materials etc.
Applying two coats of Birla (white
cement based) or Asian (acrylic
lapy-putty) or equivalent & two
coats of primer of approved brand
and manufacture on new wall
100.00 surface to give an even shade
including thoroughly brushing the
surface free from mortar dropping
and other foreign matter and sand
papered smooth.
Demolition including stacking of
serviceable materilas and disposal
5.00 of unserviceable materials with all
lead and lift. (i) R.C.C. work
Demolition of Brick work and stone
masonry including stacking
of serviceable materil as and
10.00 disposalof unserviceable
materials with all lead and lift.(ii)
In Cement Mortar.
Dismentaling tiled of stone floors
laid in mortar including stacking of
24 serviceable materil as and 47.25 Smt
disposal of unserviceable
materials with all lead and lift.
Dismentling doors, windows,
ventilators etc. (wood or steel)
shutters including chowkhats
architraves, hold fasts and other
10.00 attachment etc. complete and
stacking the material with in all
lead and lift.(ii) Exceeding
Dismentling C.I. pipes G.S.W.
pipes and A.C. rain water pipes
26 with fittings and clamps including 74.03 Rmt
stacking the materials with all lead
and lift (for any dia, of pipe)
Dismantling santtary fittings like
wash basin W.C. pan Indian and
27 European type, flushing tank etc. 401.63 Each
including stacking the materials
with all lead and lift.
Removing and scraping of old
deteriorated plaster of any
thickness from wall / R.C.C
28 member including stacking of 19.38 Smt
serviceable material and disposal
of unserviceable from site of work
with all lead and lift.
Providing, erecting and fixing
double coated Syntex PVC. (ISI)
29 water tank of required capacity 3.91 Litre
each with all necessary fittings and
connection etc. complete on
Signature of Bidder
Ahmedabad Municipal Corporation
Providing and fixing cast iron
(Spun) Nahni trap of the following
nominal diameter of self cleaning
design with C.I. screaed down or
5.00 higned grating including cost of
cutting and making good the walls
and floor 100 mm inlet and 50 mm
outlet. (C)100mm dia.
Providing and fixing water closet
squatting Pan (Indian type
W.C.Pan) size 580 mm
(Earth work, bed concrete, foot
5.00 rest and trap to be measured
and paid for separately) (A)
Vitreous China. (I)Long pattern =
Providing and fixing wash down
water closet (European type,
W.C.Pan) with integral P or S trap
including jointing the trap with soil
32 pipe in Cement Mortar 1:1 (1- 1290.8 Each
Cement:1-fine sand) (Seal and
cover to be measured and paid
forseparately) (A) vitreous China
Pattern : (i) in white colour
Providing & Fixing Angle cock of
"Ess Ess"- Trend series or
33 equivalent standard make as 403.39 No.
approved by engg. in charge all
complete. (N.S.)
Providing and fixing 100 mm
size P or S trap for water
closet squatting pan including
jointing the trap with the pan
5.00 and soil pipe in cement
Mortar1:1 (1-Cement : 1-Fine
sand)(A) Vitreous China.Pattern in
Providing and fixing wash basin
with single hole for pillar tap
with C.I.or M.S. brackets painted
white including sutting holes and
35 making good the same but 1400.18 Each
excluding fittings. (A) Vitreous
China: (ii) Flat Back wash basin
550 mm x v 400 mm size.(i) In
Providing and fixing chromium
plated brass half turn flush cock of
36 approved quality including fixing in
pipe line etc. complete.(ii) 25 mm
a 25 mm dia. 261.16 No.
Providing and fixing C.P. brass
towel rail comlete with C.P.brass
3.00 brackets fixed to wooden plugs
with C.P. brass scews. (B)
Signature of Bidder
Ahmedabad Municipal Corporation
600mm x 20mm size.
Providing and fixing 600 mm x
mm glass shelf with C.P. brass
38 bracket and guard rail complete 561.03 Each
mixed to wooden plug with
C.P.brass screws.
Providing and fixing screw down
bib taps of following size. (B)
Brass chromium plated screws
a (i) 15 mm dia. 184.98 Each
b (ii) 20 mm dia. 212.68 Each
Providing and fixing pillar tap,
capstan head, screw down high
pressure with screws, shanks and
a (i) 15mm dia. 305.67 Each
b (ii) 20mm dia. 351.18 Each
Providing and fixing ball cock of
41 approved quality as directed. (A) 131.57 Each
Copper Metal (i) 25 mm dia.
Providing laying and jointing in
true line and level 15 mm dia.
U.P.V.C. Pipe (SCH-40) for cold
water including fittings make
PRINCE/ SUPREME/ ASTRAL/
FINOLEX or equivalent as
approved by Engineer In
42 Charge. Pipe shall be fixed on the 71.93 Rmt
wall with the help of clamp at
every two metre C/C or shall be
concelled as directed including
necessary fittings etc. including
testing of pipe and joints and fixing
the same with adhesive solvent,
including cost of all materials.
Providing laying and jointing in
true line and level 25 mm dia.
U.P.V.C. Pipe (SCH-40) for cold
water including fittings make
PRINCE/ SUPREME/ ASTRAL/
FINOLEX or equivalent as
approved by Engineer In
43 Charge. Pipe shall be fixed on the 90.93 Rmt
wall with the help of clamp at
every two metre C/C or shall be
concelled as directed including
necessary fittings etc. including
testing of pipe and joints and fixing
the same with adhesive solvent,
including cost of all materials.
Providing cement vata (10 cm x
cm size) quarter round in cement
30.00 mortar 1:1 including neat cement
finishing, watering etc. complete.
Signature of Bidder
Ahmedabad Municipal Corporation
Making Water connection from
5.00 exi.Muni. Water line (N.S.)
Providing and Fixing 1 H.P.
Electrical monoblock or
submarcible water pumps
3.00 withmotor and required cable and
switch board of approved brand
and make etc.comp.as directed.
Providing TMT Bar FE
reinforcement for R.C.C. work
47 including bending, binding and 66.59 Kg
placing in position complete up to
floor two level (up to 10 ton)
Conveyance charge of Earth,
Lime, Murrum, building rubbish
earch manure or sludge and
100.00 excavated rock and fly ash,
aggregate of any kind etc. comp.
upto 5 km lead.(L.S.)
Providing and fixing S.W. gully
trap with C.I. grating brick masonry
chamber and water tight C.I. cover
49 with frame of 300mm x 300mm 1234.57 No.
size (inside) with standard
weight.(i) Square mouth traps. (B)
150mm x 100mm size P or R type
CatchPit Jali Fixing P/F FRC catch
pit jali with frame 600mm x 600mm
50 clear opening etc. comp. As 2509.86 No.
directed by engineer in charge.
(Based on Central Store Rate)
Constructing Chamber of following
size including excavation, refilling,
BBCC (1:5:10) for foundation,
C.C.Channel (1:2:4), finished
mm thick cement plaster inside in
CM 1:3, finishing with cement
slurry, Brick masonary in CM 1:5 &
excluding the cost of chamber seat
cover etc..completed. (Based on
Drainage SOR 2009-10)
0.60 X 0.45 mt. size Inside Clear,
a Depth from 0.0 to 0.90meter for 2261.6 No.
pipe dia <=150 mm.
Dismantling of existing Arch type
manhole up to Arch and then
Const. Slab type manhole of
following size incl. excavation,
refilling and & finished 15 mm thick
cement plaster inside in CM 1:3,
P/F 4 mm dia M.S.Steel HDPE
52 coated steps 35 cm c/c at 35 cm
staggered in masonry CM 1:5, incl.
cost of RCC Slab in CC 1:1.5:3,
including Cantering &
reinforcement as directed by
engineer in charge. Rate includes
carting of debris and excavated
Signature of Bidder
Ahmedabad Municipal Corporation
1.00 x 0.75 mt (inside clear) RCC
Slab of thickness 15 C.M. &
reinforcement (Single jalli at
5.00 C.M. c/c bothway 10 mm dia.)
From 0 to 2 mt depth (Slab at
Providing and supplying ISI
marked only Standard length
Stoneware pipes in standard
lengths of following class and
diameter including all taxes,
53 insurance, transportation, freight
charges, octroi, inspection
charges, loading, unloading,
conveyance to departmental
stores, stacking etc. (IS - 651 /
a 100 mm 124.00 Rmt
b 150 mm 179.00 Rmt
d 230 mm 329.00 Rmt
Lowering, laying and jointing
Stone Ware pipes of following
diameters with cement joints in C.
M. 1:1 proportion in proper
54 position, grade and alignment at
all level as directed by Engineer-
in-charge including conveyance
from stores to site of work, Jointing
material etc. comp.
a 100 mm 58.00 Rmt
b 150 mm 88.00 Rmt
d 230 mm 128.00 Rmt
Providing & laying S.W. Gully trap
with brick masonry chamber &
55 water tight G.T.Stone including 1279.40 No.
fixing of covervSquare mouth trap
100 mm x100 mm size P-Trap
Sub Total in Rs.
Seal and Signature of the Bidder Addl. City Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No.460.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .