| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.1 LAccepted-AOC | L1 | Accepted-AOC Bidder Lowest Amount | |
| 2 | L2₹28.6 L+₹48,360.75 (1.72%)Rejected-AOC | L2 | Rejected-AOC Bidder High Amount | |
| 3 | L3₹30.0 L+₹1.9 L (6.78%)Rejected-AOC BBMB SUNDERNAGAR HIMACHAL PRADESH | SHIMLA | HIMACHAL PRADESH | 172101 | L3 | Rejected-AOC Bidder High Amount | |
| 4 | L4₹33.9 L+₹5.8 L (20.8%)Rejected-AOC | L4 | Rejected-AOC Bidder High Amount | |
| 5 | L5₹35.2 L+₹7.1 L (25.3%)Rejected-AOC | L5 | Rejected-AOC Bidder High Amount |
Tender Value
₹42.4 L
EMD Value
₹71,120
Closing Date
15 Feb 2020, 11:00 amClosed
Er. K.K. Kapoor
XEN IPH Division Nurpur
Augmentation of lift irrigation scheme Bhadwar in Tehsil Nurpur Distt. Kangra SH C/O 1 No. delivery tank,22 Nos out let laying jointing testing of HDPE pipe in distribution system etc
2020_HPIPH_34321_1
EENPR7835-42dt24-01-20
Open Tender
Civil Works
Item Rate
120 days
LIS Bhadwar
Please refer Tender documents.
5 documents required · 5 mandatory
₹400
Yes
EE Nurpur
₹71,120
Yes
22 Jun 2020
27 Jan 2020
15 Feb 2020
27 Jan 2020
15 Feb 2020
27 Jan 2020
Amount
Excavation in foundation trenches (for Pipes & Pits) upto all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing or pumping out water, blasting soft /hard rock or chieselling soft /hard rock where blasting is prohibited in all lifts including trimming & dressing of sides leveling of beds to correct grade including shoring/strutting planking, timbering & dewatering wherever required stacking the serviceable and unserviceable material / soil separately and after laying, jointing and testing of pipes, returning the unserviceable soil in trenches in 15cm ( Fifteen centimeter) layers including consolidating of such deposited layer by ramming and watering & then disposing of all surplus excavated soil/ unserviceable material as directed within all leads and lifts including restoration of un-metalled surface to its original condition and including cost of diversion for traffic, night signals, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respect with in all leads and lifts as per directions of Engineer-in-Charge.
Excavation in drains and channels etc. in earth work including dressing of side and bed and disposing of excavated earth all leads and lifts disposed earth to be levelled and neatly dressed such as pick work, jumper work, within all leads and lifts as per the direction of Engineer-in -Charge.
Providing and laying cement concrete 1:5:10( 1 cement : 5 sand: 10 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth within all leads and lifts as per the direction of Engineer-in-Charge.
Providing and laying cement concrete 1:4:8(1 Cement:4 Sand:8 graded stone aggregate 40mm.nominal size) and curing complete excluding the cost of form work in foundation and plinth. within all leads and lifts as per the directions and satisfactions of the Engineer-in-Charge.
Providing and laying cement concrete work 1:2:4(1 Cement:2Sand:4 crushed stone aggregate 20mm nominal size) and curing complete excluding cost of form work in within all leads and lifts as per the direction and satisfactions of the Engineer-in-Charge
In foundation, footings, bases of columns and the like and mass concrete within all leads and lifts as per the directions and satisfactions of the Engineer-in-Charge.
In walls (any thickness) but not less than 0.10 Metre thickness including attached pillasters,buttresses,plinth and string courses etc.from top of foundation level upto any floor level within all leads and lifts as per the directions and satisfactions of the Engineer-in-Charge.
Providing form work with steel plates 3.15mm.thick welded with angle iron frame 30x30x5mm. so as to give a fair finish in-cluding centring,shuttering,strutting and propping etc.with wooden battens and ballies height of propping and centring below supporting floor to ceiling exceeding upto any height and removal of the same for in-situ-reinforced concrete and plain concrete work in:-
In vertical surfaces such as walls (any thickness) partitions and the like including attached pillasters, buttresses plinth and string courses and the like including entire carriage of material within all leads and lifts as per the directions and satisfactions of the Engieer-in-Charge.
Providing and laying mild steel / tor steel reinforcement for RCC.work including bending,binding and placing in position complete upto any floor within all leads and lifts as per the directions and satisfactions of the Engineer-in-Charge.
Laying & jointing in trenches 4.00 kg.F/ cm2 working pressure polythiene pipes high density conforming to IS:4984-1995 (PE - 80 grade) PN-4 omplete with special flange compression type fittings. (Earth work in trenches to be measured & paid for separately) within all leads & lifts as per the directions and satisfactions of the Engieer-in-Charge.
250mm dia PN-4
280mm dia PN-4
315mm dia PN-4
355mm dia PN-4
Providing and fixing PVC water stopper seel of required size 300mm wide 4mm to 6mm thick within all leads & lifts as per the directions and satisfactions of the Engieer-in-Charge.
suresh kumar gupta
SHIV KUMAR
ABHINAV MAHAJAN
Gulrez Mohammed
sadeep kumar
sanjeev kumar
Vijay kumar kushwaha
MNBN Enterprises
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .