Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹49,112.54Accepted-Finance | l1 | Accepted-Finance ACCEPTED | |
| 2 | L2₹52,333+₹3,220.46 (6.56%)Accepted-Finance AT RAJRAPPA PROJECT RAMGARH JHARKHAND 829150 | RAMGARH | RAMGARH | JHARKHAND | 829150 | L2 | Accepted-Finance REJECTED | |
| 3 | L3₹53,167.26+₹4,054.72 (8.26%)Accepted-Finance | L3 | Accepted-Finance REJECTED |
| Sl No | Description | Qty | Unit | M/S SHREE BALAJEE ENG.CO. L3 | M/S A.K. ENTERPRISES L2 | Coalfield Construction L1 |
|---|---|---|---|---|---|---|
| 1.01 | Earth work for column(post);Dimensions(l*b*h) : 1m *1m*1m; 2 Nos. | 2 | Cum | 200 ₹400 | 200 ₹400 | 190 ₹380 Lowest |
| 1.02 | PCC 1:2:4 (I) column (post) for shed of substation transformer; Dimensions(l*b*h) : 1m*1m*1m ; 2 nos :=2 Cum Fabrication of structure for GOAB (Required angle and channel will be supplied departmentally) | 2 | Cum | 5,200 ₹10,400 | 5,250 ₹10,500 | 5,175 ₹10,350 Lowest |
| 1.03 | Fabrication of structure for GOAB (Required angle and channel will be supplied departmentally) | 686 | KG | 30 ₹20,580 | 30 ₹20,580 | 27 ₹18,522 Lowest |
| 1.04 | Installation of Gang Operating Air Breaker (GOAB) switch set on the structure with supply of nut bolts | 1 | Set | 3,000 ₹3,000 | 2,900 ₹2,900 | 2,700 ₹2,700 Lowest |
| 1.05 | Providing of galvanised Nut bolts with washer of size 20mm*750mm*16 nos. foundation | 16 | Nos. | 300 ₹4,800 | 270 ₹4,320 | 265 ₹4,240 Lowest |
| 1.06 | Contractor's [profit | 1 | No | 5,877 ₹5,877 | 5,650 ₹5,650 | 5,428.8 ₹5,428.8 Lowest |
| 1.07 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹49,385
Closing Date
19 Dec 2022, 6:00 pmClosed
PE(EnM), Rajrappa Project
PE(EnM), Rajrappa Project
Installation of one no. Gang Operating Air Break (GOAB) switch set with fabrication of structure for Colony Old feeder no.-4 at 2X12.5 MVA,33 Kv/ 6.6 KV Main substation of Rajrappa Project
2022_CCL_264661_1
PO(RP)/PE(EnM)/Rjp/22-23/Et/02
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
Rajrappa Project, Rajrappa Area
Please refer Tender documents.
2 documents required · 2 mandatory
8 Oct 2025
9 Dec 2022
20 Dec 2022
10 Dec 2022
19 Dec 2022
10 Dec 2022
10 Dec 2022 - 13 Dec 2022
Amount
Earth work for column(post);Dimensions(l*b*h) : 1m *1m*1m; 2 Nos.
PCC 1:2:4 (I) column (post) for shed of substation transformer; Dimensions(l*b*h) : 1m*1m*1m ; 2 nos :=2 Cum Fabrication of structure for GOAB (Required angle and channel will be supplied departmentally)
Fabrication of structure for GOAB (Required angle and channel will be supplied departmentally)
Installation of Gang Operating Air Breaker (GOAB) switch set on the structure with supply of nut bolts
Providing of galvanised Nut bolts with washer of size 20mm*750mm*16 nos. foundation
Contractor's [profit
Total impact of GST for the purpose of CTC
M/S A.K. ENTERPRISES
M/S SHREE BALAJEE ENG.CO.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_273738.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .