Tender Value
₹5.9 L
EMD Value
₹6,000
Closing Date
17 Aug 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer Panchayat Road and Building Division, Bhavnagar
Construction of Shed Near Karalvala Meldima Temple Village Lakhavad, Ta. Umarala, Dist. Bhavnagar
331769
13/2026-27 of Bhavnagar Sr. No.15
Open
Civil - All
Works
Bhavnagar
5 documents required · 5 mandatory
₹900
Executive Engineer Panchayat R&B Division Bhavnagar
₹6,000
6 Aug 2026
6 Aug 2026
6 Aug 2026
17 Aug 2026
6 Aug 2026
120 days
Name of Work: Construction of Shed Near Karalvala Meldima Temple Village Lakhavad,
Ta. Umarala, Dist. Bhavnagar
BILL OF QUANTITIES
Item Description Quantities Unit Item Rates Amount
Excavation for foundation up to 1.50 MT depth including sorting out and
1 stacking of useful materials and disposing the excavated stuff up to 50 mt 23.34 Cum 160.89
lead (A) Dense or Hard soil
Providing and laying cement concrete 1:3:6 (1- Cement : 3- coarse sand : 6-
Machine crushed stone aggregates 40 mm nominal size) and curing
complete excluding cost of formwork in (A) Foundation and Plinth (upto
Providing and laying cement concrete work 1:1.5:3 (1- Cement : 1.5- Coarse
sand : 3- graded stone aggregates 20 mm nominal size) and curing
3 complete excluding cost of formwork and reinforcement for reinforced 1.82 Cum 4048.89
concrete work in (A) Foundations, footings, Base or columns and Mass
concrete (upto 10 ton)
Brick work using comon burnt clay building brick having crushing strength
4 not less then 35Kg/Sq.Cm. In foundation and plinth in cement mortar 1:6 (1 13.14 Cum 4279.97
Cement : 6 Fine sand) (B) conventional
Filling in foundation and plinth with sand in layers of 20 cm thickness
including watering ramming and consolidating etc.
Galvanized work welded in built up sections framed work including cutting,
hoisting, fixing in position etc complete as directed by engineer in charge .
(D) In trussses and trussed purlins, upto 25 M. span and 15 M. ovarall
height. (upto 10 ton)
Providing TMT Bar FE 415 reinforcement for R.C.C. work including
bending, binding and placing in position complete upto floor two level
Providing corrugated G.I. sheet of class-3 roofing fixed with glavanished
iron J or L Hooks, Bolts and nuts 8mm diameter with bitumen and G.I.
8 limpet washer or G.I. limpet washer. filled with white lead complete 110.95 Kg 734.18
including Mobhayu But excluding the cost of purlins, Rafters and
Trusses.(1) 0.80 mm thick sheet.
20mm thick sand faced cement plaster on walls upto height 10 metres
above ground level consisting of 12mm thick backing coat of C.M. 1:3 (1-
cement : 3-sand) and 8mm thick finishing coat of C.M. 1:1 (1-cement : 1-
sand) etc. complete.
Providing and laying polished Kota stoneslab flooring over 20mm
(Average) thick base of cement mortar 1:6 (1-cement : 6-coarse sand) or
10 L.M. 1.1.5 (1-Lime putty:1.5 - coarse sand) laid over and jointed with grey 106.75 Sqm 1019.39
cement slurry mixed with pigment tomatch the shade of slab including
rubbingand polishing etc. complete. (A) 25mm thick
Applying two coats of oil Paint with priming coat/Red oxide over new steel
and other metel surface after and including preparing the surface by
throughly cleaning, oil,grease, dirt and other foreign matter and scoured
with brushes fine steel wood, scrapers and sand paper with ready mixed
11 priming paint brushing red lead.Painting two coats (excluding priming coat 21.78 Sqm 132.01
on new steel and other metal surface with enamel paint, brushing, interior
to give an even shade including cleaning the surface an even shade
including cleaning the surface of all dirt, dust and other foreign matter.
Wall painting (two coats) with plastic emulsion paint of approved brand
and manufacture on undecorated wall surface to give an even shade
12 including throughly brushing the surface free from mortar droppings and 15.84 Sqm 84.81
other foreign matter and sand papered smooth.
Name of Work: Construction of Shed Near Karalvala Meldima Temple Village Lakhavad,
Ta. Umarala, Dist. Bhavnagar
BILL OF QUANTITIES
Item Description Quantities Unit Item Rates Amount
Providing, laying and jointing in true line and level 110 diametre U.P.V.C
(Type B) conforming to IS 13592-1992 with one end plain and other end
socketed with rubber ring, & fittings conforming to ISI 14735-1999 of
pproved make for drainage system pipe line, pipe shall be jointed with each
other with rubber lubricant, pipe shall be fixed on wall using of PVC clamp
of the size 110 mm diametre x 149 mm length x 145 mm heigh at every
2000 mm center to center or shall be concealed in walls as directed
including necessary fittings such as bends, shoes etc. including testing of
pipes and joints and jointed with adhesive solvent cement including cost of
I/We am/are willing to carry out the work at…% above/below percent(Should be written in igures and words) of the
estimated rate mentioned above. Amount of my /our tender works out as under.
(A) Estimated amount put to tender Estimated amount put to tender
(B) Deduct………% below Add………% below
(Rs. in Words __________________Only). (Rs. in Words __________________Only).
(* Please strike out whichever is not applicable).
1. The Contractor shall exhibit a board with detailed specification and details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
2. The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills.
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.:
PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C.
items where there is a change as per actual mix design the cost of difference of cement consumption
have been deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Dated Signature of Deputy Executive Engineer Executive Engineer
the Contractor. Panchayat (R&B) Sub Division Pancchayat (R & B) Division sion
Vallabhipur Bhavnagar
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
8.GR SBD (Paripatra).pdf
Tender Notice No.13 of 2026-27.pdf
1.SBD Lakhavad Shed.pdf
2.BOQ Lakhavad Shed.pdf
3) Civil Specification.pdf
4) Test Schedule.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .