Loading…
Loading…
Tender Value
₹29.6 L
EMD Value
₹30,000
Closing Date
16 Jun 2026, 6:00 pm
Executive Engineer R and B Division, Palanpur
C R to Various Road in Dantiwada Section under R and B Sub Division, Palanpur Dist : Banasantha (Pro.Jungle cutting, Earthwork , Metal Patch work , Labour for BT patch, CD cleaning, Quarry Spall, Geru Chuno & Misc. Work)
311418
6 of 2026-27
Open
Civil - All
Banaskantha
11 documents required · 11 mandatory
₹1,500
Executive Engineer, R and B Division, Palanpur
₹30,000
4 Jun 2026
4 Jun 2026
4 Jun 2026
16 Jun 2026
4 Jun 2026
Name of Work :C R to Various Road in Dantiwada Section under R and B Sub Division, Palanpur Dist : Banasantha (Pro.
Jungle cutting, Earthwork , Metal Patch work , Labour for BT patch, CD cleaning, Quarry Spall, Geru Chuno & Misc.
Memorandum showing item of work to be carried out
It. Quantity Item Description Estimated Rate Unit Total Amount
It. Quantity Item Description Estimated Rate Unit Total Amount
No. Estimated (in Rs.) according to
But may be estimated
In Figure In Words
more or less quantities
1 19.09 Clearing and grubbing road land including uprooting rank 28455.09 Rupees Twenty Eight Hec
vegetation grass bushes, shrubs, sapling and trees girth up to 300 Thousand Four
mm removal of stumps of trees cut earlier and disposal of Hundred Fifty Five
unserviceable materials (C) By mechanical means in area of light And Paise Nine Only
2 2228.00 Earthwork for embankment with selected earth CBR not less than 6 192.23 Rupees One Hundred Cmt.
including breaking clods, dressing with all lead and lift (including Ninety Two And Paise
watering and consolidation) (B) From Borrow area with all lead and Twenty Three Only
3 358.00 Providing Hard Side Solder of 100mm thick for embankment using 1632.16 Rupees One Cmt.
quarry spall with all lead and lift and including watering and rolling Thousand Six
and consolidation of sub grade in layers at OMC to required dry Hundred Thirty Two
density including filling the depressions which occur during the And Paise Sixteen
process using power roller 8T to 10 T (Selected Quarry Spall having
CBR value not less than 20.00).
4 271.00 Supplying of graded Machine Crushed metal of following size as 1588.27 Rupees One Cmt.
directed including all taxes & royalties and filling mesaure boxes Thousand Five
with all lead and lift etc. complete (3) Machine crushed Metal Hundred Eighty Eight
45mm to 63mm size. And Paise Twenty
It. Quantity Item Description Estimated Rate Unit Total Amount
It. Quantity Item Description Estimated Rate Unit Total Amount
No. Estimated (in Rs.) according to
But may be estimated
In Figure In Words
more or less quantities
5 44.00 Supplying and stacking screening grit of approved quality on road 1623.45 Rupees One Cmt.
site including taxes & royalties and filling measure boxes with all Thousand Six
lead and lift etc. complete. Hundred Twenty
Three And Paise
Forty Five Only
6 22.00 Supplying and stacking stonedust of approved quality on road site 1108.35 Rupees One Cmt.
including taxes & royalties and filling measure boxes with all lead Thousand One
and lift etc. complete. Hundred Eight And
Paise Thirty Five Only
7 271.00 Spreading the stone aggregate for soling and WBM including filling 262.24 Rupees Two Hundred Cmt.
the interstices forming the surface to require camber and gradient Sixty Two And Paise
as directed includig stonedust etc. complete. Twenty Four Only
8 66.00 Spreading blindage or road crust filling the gaps in metal and 154.84 Rupees One Hundred Cmt.
levelling to camber and gradient as directed. Fifty Four And Paise
Eighty Four Only
9 224.00 Rolling and consolidation water bound macadam ( except laterite 249.34 Rupees Two Hundred Cmt.
and kankar including watering not exceeding 150mm thickness ( Forty Nine And Paise
main layer ) including binding materials including fillin in depression Thirty Four Only
which occurs during the process. (B) With power roller exceeding
tonne and not exceeding 12 tonnes.(Rolling and consolidation (with
10 50.00 Providing Vibratory roller 8 - 10 tonnes @ 100 cum per hour. 850.79 Rupees Eight Hour
Hundred Fifty And
Paise Seventy Nine
It. Quantity Item Description Estimated Rate Unit Total Amount
It. Quantity Item Description Estimated Rate Unit Total Amount
No. Estimated (in Rs.) according to
But may be estimated
In Figure In Words
more or less quantities
11 300.00 Providing earth excavator including cleaning sites for hire charges of 718.98 Rupees Seven Hour
excavator including diesel, labours, drivers etc. complete as Hundred Eighteen
directed. And Paise Ninety
12 300.00 Providing labour at any site (male /female) - Labour charges - 594.89 Rupees Five Hundred Each
Mazdoor with Hand Cart Ninety Four And
Paise Eighty Nine Only
13 100.00 Applying White Wash and Geru to trees in three coats as and where 3074.44 Rupees Three Km
directed incl. all cost of materials and labour charges in the work Thousand Seventy
etc.complete as directed. Four And Paise Forty
Rupees Twenty Nine Lakh(s) Sixty Three Thousand Three Hundred Twenty Nine And Paise Fifty Six Only
I/am we/are willing to carry out the work at _____% above /below _____________ percent (should be written in figures and words) of
the estimated rates mentioned above. Amount of my/our tender works out as under.
* Estimated amount put to tender * Estimated amount put to tender
{* Strike whichever is not applicable.} {* Strike whichever is not applicable.}
Signature of Contractor Executive Engineer
R & B Dn., Palanpur
It. Quantity Item Description Estimated Rate Unit Total Amount
It. Quantity Item Description Estimated Rate Unit Total Amount
No. Estimated (in Rs.) according to
But may be estimated
In Figure In Words
more or less quantities
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In- Charge for which no
extra payment shall be made.
2 Credit Amount Rs. 00.00 for dismantling of materials shall be deducted from running account bill
3 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
4 GST and Income tax TDS will be deducted at a source while making payments of bills
5 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017 Cement
Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the
cost of difference of cement consumption have been deducted from the rate of original item at the rate of input rate mentioned in all
Signature of Contractor Executive Engineer
R & B Dn., Palanpur
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ Dantiwada.pdf
Dantiwada SEction DTP.2.pdf
Dantiwada Section DTP.pdf
SBD Clause 24 34 52_0001.pdf
Special Condition.pdf
Download all tender documents and submit your bid