Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹7.6 LAccepted-AOC DOOR NO 68 2963 E3 MANDAKKARA ROAD AYYAPPANKAVU ERNAKULAM KERALA 682 018 | ERNAKULAM | ERNAKULAM | KERALA | 682018 | ₹7.6 L | l1 | Accepted-AOC AOC |
| 2 | l2₹8.5 L+₹80,800 (10.6%)Rejected-Finance 42 608A PULLOMPARAMBIL HOUSE MANDAKARA ROAD KOCHI 682 018 | ERNAKULAM | KERALA | 682018 | ₹8.5 L+₹80,800 (10.6%) | l2 | Rejected-Finance not being l1 |
| 3 | l3₹8.6 L+₹91,050 (11.9%)Rejected-Finance 3 333 F M P ARCS VENGACHUVADU VAZHAKKULAM P O CHAITHANYA BUILDING SA ROAD KADAVATHRA MUVATTUPUZHA ERNAKULAM 686670 | MUVATTUPUZHA | ERNAKULAM | KERALA | 686670 | ₹8.6 L+₹91,050 (11.9%) | l3 | Rejected-Finance not being l1 |
Tender Value
₹9.9 L
EMD Value
₹19,800
Closing Date
22 Sept 2022, 6:00 pmClosed
AGE I R AND D KOCHI
AGE I R AND D KOCHI, THRIKKAKARA,KAKKANAD, KOCHI 682021
REPAIR MAINTENANCE OF HT LT FEEDER PILLAR DISTRIBUTION PANEL BOARDS AND CONNECTED WORKS AT NPOL KOCHI
2022_MES_541695_2
8136E8AGERDK
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
KAKKANAD
AS PER TENDER DOCUMENTS
6 documents required · 6 mandatory
₹500
Yes
AGE I R AND D KOCHI
₹19,800
Yes
15 May 2025
1 Sept 2022
24 Sept 2022
1 Sept 2022
22 Sept 2022
8 Sept 2022
Amount
Supply and fixing in replacement MCCB of following ratings in existing indoor/ Outdoor HT/LT panel board including connecting with proper size link set at incoming and outgoing cable connections and making necessary modification in existing panel as required complete all as specified and directed by Engineer in Charge. Note: cost include taking down the existing MCCB from panel board disconnecting incoming / outgoing cable and fix the new MCCB in position at panel board including necessary cable connections of any size/ rating complete all as specified and as directed by Engineer-in Charge.
MCCB 63 to 100 Amp 4 pole 16 KA ; Make: Siemens/Legrand/L& T
MCCB 125 Amp 4 pole 16 KA; Make: Siemens /Legrand/L& T
MCCB 200 Amp 4 pole 25 KA; Make: Siemens /Legrand/L& T
MCCB 250 Amp 4 pole 25 KA; Make: Seimens/Legrand/L& T
MCCB 400 Amp 4 pole 35/36 KA; Make:Seimens/Legrand/L& T
MCCB 630 Amp 4 pole 35/36 KA; Make: Seimens/Legrand/L& T
M&L Earthing complete with galvanized steel earth plate electrode 600x600x6.0mm thick buried directly in ground (earth pit not less than 2.25 meters deep below ground level) with top edge of the plate not less than 1.5 meters below normal ground level connected to galvanized iron strip 25 X 4 .00 mm as earthing by means of bolts nuts and washers of galvanized iron including excavation and earth work and disposal of surplus soil including 40 mm GI tubing light grade and necessary fittings for protection of GI strip including laying of charcoal , dust and common salt , PCC 1:2:4 Type B 1 using 20 mm graded aggregate with earth pit with 40 X 40 X 6.0 mm MS angle iron frame RCC cover 40 mm thick (1:2:4) Type C1 using 20 mm graded stone aggregate reinforced with 8 mm dia TMT bar @ 75 mm C/C both way with plastering 15 mm thick CM (1:6) internally and up to 150 mm below ground level externally. PGI funnel with wire mesh, 20 mm dia medium grade GI pipe for watering complete all as shown on electrical plate No: 03 of SSR part - I 2009 and connected to earth test point including testing completed all specified and directed.
Supplying and fixing in replacement earth continuity conductor or main earthing lead of Galvanised iron strip of size 32 X 6 mm, fixed on Floor/ Wall with supporting insulators / laid in trench from existing earth test point complete all as specified and as directed by the Engineer - in - Charge.
M & L for cleaning the LT feeder piller box indoor/ Outdoor type of size up to 3m X2m X0.5m of different rating bus bar, after dismantling the Incoming and outgoing connections from MCCB/ Bus bar and replacing the old unserviceable nut, bolts, supporting insulators etc. and check the serviceability of MCB/MCCB, earth continuity conductor, tightening the earth conductor and incoming and outgoing cables and removing existing old insulation of bus bar and MCCB/ MCB terminals and providing new insulation tape of standard quality applied to Bus bar and MCCB terminals and cleaning the feeder pillar box all as specified and directed.
Note: (i) Contactor has to take the Shutdown of Transformer 11/0.433 KV from substation/MRS before starting the execution of work and switch ON/OFF on the Transformer after completion of work all as directed. (ii) Cost of T & P also included in quoted rate). (iii) The contractor should be deployed the skilled electrician for handling the HT & LT feeder pillar smoothly without damaging/disturbing the existing HT & LT installation.
M & L for LT danger notice board readymade / printed on water proof sheet pasted on LT feeder pillar box with vitreous enameled white back ground , with letters figures and conventional skull and bones in signal red colour of Approved size up to 20 X 15 Cm all as directed
M & L for strip connector 4 way terminal of rating up to 100 Amp including necessary fixing arrangements fixed to feeder pillars /junction boxes all as specified and as directed
M & L for in replacement of copper earth strip of size 20 X 3 mm laid in trench/ wall/ floor with necessary supporting insulators in regular interval as directed from earth test point to terminal point with double nut bolt joint at starting terminal al as directed by EIC.
M&L for writing feeder pillar No on feeder pillar with super enameled synthetic paint, letters of size 75x75 mm with black back ground surface all as specified and directed by Engr-in-Charge.
M& L for removing of dirt by using sandpaper completely and preparation of old painted steel surface of any gauge/ size of transformers with and including applying two coats of priming with red oxide Zinc chrome and a final coat of black Japan paint as existing colour of paint by spray paint (Using Machine) at four sides, top and bottom of transformer capacity of following rating in KVA all as specified and as directed by engineer in charge. Note: (i) Contactor has to take the shutdown of Transformer 11/0.433 KV from substation/MRS before starting the execution of work and switch ON/OFF on the Transformer after completion of work all as directed. (ii) Cost of T & P also included in quoted rate. (iii) The contractor should deploy skilled electricians for handling the HT & LT installation smoothly without damaging/disturbing the existing installations.
Transformer capacity upto 250 KVA
Transformer capacity upto 400 KVA
Transformer capacity upto1600 KVA
Dismantling and taking out existing unserviceable transformer of capacity 400 KVA and conveyed to the MES store yard from UARF, Kulamavu. Old transformer obtained from existing location shall be conveyed to MES store yard with entire safety by the contractor, also the transportation cost shall deem to be included in the unit cost quoted by the tenderer.
Supply, install, test and commissioning in replacement of outdoor type LT Feeder pillar box made out of 3.0 mm thick CRCA sheet, CPRI Approved ,totally enclosed weather dust and vermin proof as per IS with front and rear opening suitable locking arrangement having copper bus bar of 300 Amp capacity for RYB and Neutral and insulated with insulators, including connecting incoming and outgoing cables necessary PCC 1:3:6 in foundation and made out of 50 X 505 X 6 mm angle iron grouted at ground above 30 cm from ground level Comprising the following all as specified and as directed by the engineer - in-charge. Note: Quoted rate includes necessary internal wiring for meters , CTs, indication lamps, etc and Rigid bus bar connections from bus bar to MCCB terminals connection Bus to MCCB/MCB connections
Incoming
i) MCCB 200 Amp,4 pole 16 KA - 01 Nos ii) Digital multi function meter for both volt meter and ammeter - 01 Nos [Make: Neptune/ AEI/ Meco/L& T/ HPL/Elmeasure] iii) LED type Indicating lamps - 03 Nos
Out going
i)MCCB 100-125 Amp ,4 pole 16 KA - 03 Nos ii)Provision of space for MCCB 63 Amp ,4 pole 16 KA - 01 Nos iii)CT's 200 /5 Amp - Set of three [Make :AE / Kappa/PGR]
Supply and fix in replacement MCB of following rating , 50 Hz AC Supply 10 KA with necessary aluminium lugs up to 16 Sq mm complete ,all as specified and directed by engineer in charge .Make: L&T /Siemens/Legrand/C & S
MCB TPN 4 Pole 32-40 Amp.
MCB TPN 4 Pole 63 Amp.
MCB TPN 4 pole 100 Amp.
M& L for preparation of old painted steel surface of any gauge / size and applying two coats of red oxide Zinc chrome and a final coat of black Japan paint by spray paint (Using Machine) at both sides ie, top and bottom of cable duct cover etc all as specified and as directed by Engineer in Charge.
M&L for cable duct cover of steel plate, 6 mm thickness cut in required size including painting applying two coat of priming with red oxide Zinc chrome and a final coat of black Japan paint by spray paint (Using Machine) at both sides ie, top and bottom of cable duct cover as directed.
Supply, install, test and commissioning in replacement of Indoor type LT Feeder pillar box made out of 2.0 mm thick CRCA sheet outdoor type , CPRI Approved ,totally enclosed weather dust and vermin proof as per IS with front and rear 300 Amp capacity for RYB and half for neutral and insulated with insulators, including connecting incoming and outgoing cables necessary made out of 50 X 50 X 6 mm angle iron grouted at Floor above 30 cm from ground level Comprising the following including taking down old unserviceable feeder pillar box , all as specified and as directed by the engineer - in- charge. Note: Cost includes necessary internal wiring for meters , CTs, indication lamps, etc and Rigid bus bar connections from bus bar to MCCB terminals connection Bus to MCCB/MCB connections. Note: Connection from HT Switch gears (Ringman system) to new LT panel board to be done and necessary fitting fixtures to be borne by the contractor without extra cost of the department.
Incoming
i) Provision of space for MCCB 250 Amp 4 pole 16 KA - 02 Nos as incoming . ii) Digital Volt Meter 0- 500 Volt -01 Nos [Make: Neptune/ AEI/ Meco/L& T/ HPL/Elmeasure ] iii) LED type Indicating lamps -03 Nos [Make : C& S/ Neptune / L&T / Vaisnavo] iv) Change over switch 250 Amp 4 pole - 01 Nos
Out going
i) MCCB 100 Amp, 4 pole , 16 KA - 03 .Make: L&T /Siemens/Legrand ii) MCB TPN 63 Amp 10 KA - 03 .Make: L&T / Siemens /Legrand iii) MCB DP 32 Amp 10 KA - 02 .Make: L&T / Siemens /Legrand iv) igital Ammeter 0 - 200 Amp -01 Nos [Make: Neptune/ AEI/ Meco/L& T/ HPL/Elmeasure ] v) CT's 200 /5 Amp - Set of three [Make :AE / Kappa/PGR]
WELTRONENGINEERINGSERVICES
Linsta Services
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .