| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.3 LAccepted-AOC | L1 | Accepted-AOC Contract awarded being lowest bidder. | |
| 2 | L2₹27.9 L+₹2.6 L (10.1%)Rejected-AOC NEAR DOON INSTITUTE BHALLA FARM SHYAMPUR RISHIKESH DEHRADUN UK 249 204 | DEHRADUN | DEHRADUN | UTTARAKHAND | 249204 | L2 | Rejected-AOC Rejected due to Higher amount quoted. | |
| 3 | Rejected-Technical 103 HARIAKSH PLAZA HOSPITAL ROAD BHUJ KUTCH GUIARAT 370001 | BHUJ | KUTCH | GUJARAT | 370001 | - | Rejected-Technical Not admitted due to firm is not submitted docs as mentioned Para 8 (c) of NIT at Ser Page No. 09. |
| Sl No | Description | Qty | Unit | BK CONSTRUCTION L2 | OM ELECTRICAL ENERGY L1 |
|---|---|---|---|---|---|
| 1.00 | Design,Supply, install, testing and commissioning of ON Grid connected roof top solar generation system of capacity not less than 30 KWp AC capacity all as specified in PS and directed as per PS clause and specification as follows :- | 1 | Each Job | 17,95,000 ₹17,95,000 | 15,20,210 ₹15,20,210 Lowest |
| 1.01(A) Supply, Installation, testing and commissioning of not less than 30 KWp SPV system comprising of latest specification DCR solar photo voltic modules/array of high efficiency made of mono crystalline silicon solar PV cells with supply and fix of terminal box on the module having provision for opening & replacing the cable etc.as per IEC. The general features of PV modules shall be as given below :- a) The module shell be made up crystalline silicon solar cells module of 540/580 Wp as per IEC 61215/BIS 14286. b) The interconnected cells shall be laminated in vacuum to withstand adverse environmental conditions. c) The module frame is made of corrosion resistant materials, preferably having aluminium anodized finish. d) The minimum clearance between the lower edge of the modules & the developed ground level shall be 300 mm. e) Surge arresting devices to be provided at junction box and module shall be provided with bypass diode. f) The SPV module must be IEC 61215, IEC 61730 part I & part II, IEC 61701 certified from any of the accredited certifying agencies. g) Each solar PV module must be warranted by manufacturer at least 90% rated power at the end of 10 years & 80% at the end of 25 years. Note: Qty of PV module shall be decided as per OEM recommendation, design and layout drawing submitted to department for approval of accepting officer duly recommended by GE.and will be Procured after approval of Accepting Officer. Note :- (i) Makes of panel provided shall be as per MNRE specification/ standard and registered in ALMM. (ii) 5% spare qty of modules shall be provided by the contractor for repair / replacement purpose. (iii) Addln module shall be provided / installed by the contractor to meet specified power output incase if the same not achived during testing and commissioning without any extra cost. | |||||
| 1.02(iv) Each PV module used in any solar power project must use a RF identification tag. The following information must be mentioned in the RFID used on each module:- (v) Name of the manufacturer of PV Module (vi) Name of the Manufacturer of Solar cells(vii) Month and year of the manufacture for solar cells and the module (viii) Country of origin (Make in INDIA only) (ix) I-Vcurve for the module (x) Wattage, Im, Vm and FF for the module (xi) Unique Serial No and Model No of the module (xii) Date and year of obtaining IEC PV module qualification certificate (xiii) Name of the test lab issuing EC certificate (xiv) Other relevant information on traceability of solar cells & module. | |||||
| 1.03(B) Module Mounting Structure (MMS) :- Supply & fixing of the anti-corrosive factory made Gl structure on the RCC Roof for fixing of PV modules by fixing of suitable size fastner, spring washer, nuts & bolt. The minimum thickness of galvanization & mounting steel structure shall be as per IS 47592 & IS 2061-1992 respectively withstand the wind load of 180 Km/hr. as per IS 875. The array structure shall be fixed properly using maintenance free earthing kit. Note:- (i)The total load for roof top SPV should be less than 60 Kg/m2. (ii) The design of module mounting structure complying load withstand as per relevant IS alongwith fixing arrangement on roof shall be submitted by the contractor duly vetted from IIT/NIT/Govt Engg college for approval by GE. (iii) The material shall be corrosion resistant and electrolyticaly compatible with material used in module frame. (iv)The fasteners should be of stainless steel and should allow easy replacement of any module. (v) The minimum clearance of the structure from the roof level should be 300 mm. | |||||
| 1.04(C) Solar DC Cables:- (i) Supply & laying of 1.1kv single core multi stranded PVC FRLSH insulated & unsheathed copper wire/ copper cable for 3 ph supply in ISI marked PVC rigid conduit pipe by saddling as per IEC. (For Solar Array DC supply connection). Note : (i) The size of cable shall be as per design given by OEM & approved by GE. (ii)Cable should be passes through PVC rigid pipe and pipe should be fixed properly inside cable tray for easily maintenance, is included in quoted rate (D) DC Combine box A DC combine box shall be used to combine the DC cables of the solar module array with DC fuse protection for the outgoing DC cables to the DC distribution box. | |||||
| 1.05(E) Array junction boxes_- The number of junction boxes as per design given by OEM are to be provided in the PV array for termination of connecting cables. All wire/cables must be terminated through cable lugs. Copper busbar/terminated blocks housed in the junction box conforming to IP 65 degree of protection with EPDM rubber gasket to prevent water entry. Junction boxes shall be mounted on the MMS such that they are easily accessible and protected from direct sunlight & harsh weather. (F) On Grid Power Conditioning unit ( Inverter):- Supply & installation of 415V 3-ph, 50 Hz microprocessor DSP type grid connected Inverters which converts DC energy produce by the solar array to AC energy such that it synchronizes with the existing AC power source on site. Provisioning of power manager to get all parameter details. The Inverter shall have inbuilt MPPT (Maximum Power Point Tracker) feature so as to extract maximum power from PV modules & the MPPT units environmental testing should qualify IEC 60068-2 (1,2,14,30)/ Equivalent BIS standard. (The voltage variation of +/- 10% & frequency variation +/-3 Hz) | |||||
| 1.06Note :- (i) No of inverters shall be provisioned as per design given by OEM. (ii) Inverter should have internal protection arrangements against any sustainable fault in feeder line and against the lightning on feeder. (iii) Should have isolating transformer (iv) Inverter efficiency >97% with inbuilt galvanic isolation) (v) No load losses shall be less than 1% of rated power. (vi) The above quoted rate is inclusive of MS structure stand duly fixed and placing inverter. (vii) Ambiant Temp -20-50 degree centigrade. (viii) Protection of enclosure-IP 20(Indoor)/ IP65 (Outdoor). (ix) Power Factor- More than 0.9 (x) THD less than 3% | |||||
| 1.07(G) Solar meter & Net meter:- As per DISCOM requirement, to be provided at main MRS. Cost of Solar meter & Net meter, installation, connected accessories, necessory liasioning with DISCOM are included in quoted Rates. If DISCOM desires installation of above meters through deposit work including NOC if required, then cost of deposit shall be made by contractor and amount shall be included in quoted rates. (H) AC Distribution Board:- (i) Supply & installation of 415V 3-ph 50Hz AC distribution board control AC power from Inverter & provided by nacessary surge arrestors system and suitable capacity MCCBs.; Qty-01 No Note: ACDB shall be provided as per OEM design as approved by GE. (J) AC Cables:- (ii) Distribution wiring in 1.1kv single core multi stranded PVC FRLSH insulated & unsheathed copper wire fixed on wall on PVC batten or saddle(For AC power supply from Inverter to AC distribution board Panel). Note :- (i) The size of cable shall be as per design given by OEM & approved by GE. (K) Protection:- The system shall be provided with all necessary protection like earthing, lightening & surge protection as per relevant standard. | |||||
| 1.08(L) Performance testing:- Ratio between the theoretical energy outputs of the SPV plant is termed as performance ratio and is measured in accordance with IEC 61724. Based on prevailing climatic and temperature conditions in India, a performance ratio of 75% is expected for crystalline modules. (M) Other Misc items:- As per requirement given by OEM and approved by GE to be provided. (N) Earthing:_ As per MNRE specifications to be provided. (O) Lightening protection:- As per MNRE specifications to be provided. (P) Installation, Testing & Commissioning:- As per safety norms of SERC/CEA to be provided. (Q) O&M and Warranty:- 5 years from the date of commissioning to be provided. | |||||
| 1.09Note: The quoted rate deemed inclusive of the following:- (i) Transportation charges with Transportation Insurance for the all material of on grid solar roof top system including loading & unloading at site from workshop. (ii) Insurance for the complete system for the 5 Years. (iii) AMC-Suraksha which include 24 Hour site Maintenance visits, Response time 2 hrs and turn around time 48 hrs, Monthly plant performance report. (iv) As per performance obligation, the contractor shall maintain minimum capacity utilization factor (CUF) of 13%. The report shall be submitted by the contractor to GE as per guidelines promulgated by SECI. (v) Satisfactorily testing and commissioning of the system is to be done by the contractor in presence of the rep of accepting officer and the report of the complete system is submitted to department. (vi) Guarantee and warranty of Solar panel and connected devices is to be submitted to department. (vii) The report of generated unit of solar power on monthly basis is to be submitted to office. (viii) The cost of appropriate civil structure (Hot Dip Galvanised Iron structure) shall be included in quoted rate . The Civil structure incorporating Solar PV modules (arrays) should withstand the gusts of wind /cyclonic wind upto 150 km/hr from backside of panel. (ix). PV modules will be guaranteed against any manufacturing defect for 10 Years. (x). The contractor shall submitt design vetted from National Institute of Solar Energy or by Govt Institute authorised by MNRE or NISE or any reputed Institute / Agency authorised. (xi). The quoted rate shall be inclusive of all the components as specifed here-in-above as well as Particular Specification, unless otherwise specified. (xii). Suitable fastening arrangement such as grouting and calming should be provided to secure the installation against the specific wind speed. The Empanelled Agency shall be fully responsible for any damages to SPV System caused due to high wind velocity within guarantee period as per technical specification. | |||||
Tender Value
Refer Docs
EMD Value
₹58,000
Closing Date
20 Oct 2025, 6:00 pmClosed
CWE AHMEDABAD
CWE Ahmedabad Hanuman Camp Shahibaug Ahmedabad PIN-380003
PROVISION OF ROOF TOP SOLAR PLANT OF CAPACITY 30 KWp AT GANDHINAGAR MIL STN
2025_MES_733145_1
87422/E8
Open Tender
Electrical and Maintenance Works
Item Rate
120 days
ARMY AREA GANDHINAGAR
AS PER TENDER DOCUMENT
6 documents required · 6 mandatory
₹500
GE (A) GANDHINAGAR
₹58,000
Yes
6 Feb 2026
29 Sept 2025
28 Oct 2025
29 Sept 2025
20 Oct 2025
14 Oct 2025
29 Sept 2025 - 13 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_820882.xls
BOQ • 0.31 MB
TENDER.pdf
Tender Documents • 0.95 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .