| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.7 CrAccepted-AOC | ₹8.7 Cr | L1 | Accepted-AOC Submitted documents as per NIT |
| 2 | L2₹9.9 Cr+₹1.1 Cr (12.9%)Rejected-Finance | ₹9.9 Cr+₹1.1 Cr (12.9%) | L2 | Rejected-Finance L2 bidder |
| 3 | L3₹10.5 Cr+₹1.8 Cr (20.7%)Rejected-Finance 81 ARYA NAGAR ASSANDH ROAD PANIPAT HARYANA 132103 | PANIPAT | HARYANA | 132103 | ₹10.5 Cr+₹1.8 Cr (20.7%) | L3 | Rejected-Finance L3 bidder |
Tender Value
₹13.5 Cr
EMD Value
₹27 L
Closing Date
6 Feb 2023, 4:00 pmClosed
GM(Civil)/HoD, CMPDI HQ, Ranchi
Office of GM(Civil)/HoD, CMPDI HQ, Ranchi
PLANNING , DESIGN, ENGG, CONST, FABRICATION , ERECTION, SUPPLY, INSTALLATION, TESTING OF 03 Nos STPs of 200 KLD CAPACITY EACH BASED ON SBR TECHNOLOGY AT HOSPITAL COLONY, LAPANGA COLONY AND PATEL NAGAR COLONY BARKA SAYAL AREA CCL
2023_CMPDI_268021_1
CMPDI/HQ/CIVIL/PMC/2023/58 dtd 17.01.23
Turnkey
Civil Works - Others
Item Rate
450 days
Barka Sayal Area CCL
As per NIT
8 documents required · 8 mandatory
₹27 L
12 May 2023
18 Jan 2023
7 Feb 2023
18 Jan 2023
6 Feb 2023
19 Jan 2023
18 Jan 2023 - 30 Jan 2023
Amount
Surveying, Geotechnical investigation, preparation of Contour Plan and other related works like clearing the STP plant sites and making it complete in all respect etc. for three colonies namely Hospital Colony, Lapanga Colony and Patel Nagar Colony.
Planning , DESIGN, ENGINEERING, CONSTRUCTION, of sewage networks (DWC HDPE Pipes) including providing inspection chambers, intermediate pumping arrangement (if required) and all associated works making it complete in all respect for three colonies namely Hospital Colony, Lapanga Colony and Patel Nagar Colony.
Supply, installation, testing and commisioning of STP of capacity 200 KLD based on SBR Technology as per scope of work given , including civil work ( except Plant Room), Electrical , Mechanical works , electro mechanical equipments, development works, horticulture works etc. in all complete for three colonies namely Hospital Colony, Lapanga Colony and Patel Nagar Colony.
Construction of control Room of minimum size 3m x 3.5m x 3.0 m (min. ht), adequate foundation as required , 9” brick wall, sufficient windows, Doors, Roof: M30 RCC roof, Flooring: required flooring, internal/external electrifications, all complete as per direction of EIC for STPs in three colonies namely Hospital Colony, Lapanga Colony and Patel Nagar Colony.
Construction of RCC framed boundary wall of height 2.0 m and 600 mm concertina fencing above it as per CPWD specifications with M30 concrete and Flys ash bricks (minimum class designation 7.5) with Main entrance gate for STPs plant premises in three colonies namely Hospital Colony, Lapanga Colony and Patel Nagar Colony.
Providing and laying 60mm thick faciory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with line sand ,providing PCC bed below it etc. complete as per CPWD specifications/ as per direction of EIC for STPs in three colonies namely Hospital Colony, Lapanga Colony and Patel Nagar Colony.
Comprehensive operation in 24x7, maintenance contract including necessary servicing and replacement of spare parts (OEM) etc. complete
Operation charges during warranty period of 12 months as per scope of work including disposal of sludge as per the CPCB guidelines or as per direction of EIC for 03 Nos of STPs
Ist Year of Comprehensive operation and maintenance charges after security period/ warranty period of one year as per scope of work & disposal of sludge as per the CPCB guidelines or as per direction of EIC for 03 Nos of STPs
2nd Year of Comprehensive operation and maintenance charges after security period/ warranty period of one year as per scope of work & disposal of sludge as per the CPCB guidelines or as per direction of EIC for 03 Nos of STPs
3rd Year of Comprehensive operation and maintenance charges after security period/ warranty period of one year as per scope of work & disposal of sludge as per the CPCB guidelines or as per direction of EIC for 03 Nos of STPs
4th Year of Comprehensive operation and maintenance charges after security period/ warranty period of one year as per scope of work & disposal of sludge as per the CPCB guidelines or as per direction of EIC for 03 Nos of STPs
5th Year of Comprehensive operation and maintenance charges after security period/ warranty period of one year as per scope of work & disposal of sludge as per the CPCB guidelines or as per direction of EIC for 03 Nos of STPs
Total impact of GST for the purpose of CTC
SAINATH ENVIROTECH
SURYA INTERNATIONAL ENTERPRISE PRIVATE LIMITED
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_277353.xls
BOQ Document • 0.33 MB
Workexp.xls.xls
BOQ Document • 0.03 MB
112913905.pdf
Tender Document • 3.77 MB
112913907.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .