Tender Value
₹1.6 Cr
EMD Value
₹1.6 L
Closing Date
14 Jul 2026, 6:00 pm6d left
Executive Engineer, Anand Agriculture University, Anand -388110
CONSTRUCTION OF CLASSROOM & STAFF ROOM ON FIRST FLOOR OF INTERNATIONAL AGRI-BUSINESS MANAGEMENT INSTITUTE AT A.A.U., ANAND.
319436
Nivida-04 OF 2026-27
Open
Civil Works - Buildings
Anand
16 documents required · 16 mandatory
₹3,600
Anand Agricultural University Fund Account – Anand
₹1.6 L
30 Jun 2026
30 Jun 2026
30 Jun 2026
14 Jul 2026
30 Jun 2026
NAME OF WORK: CONSTRUCTION OF CLASSROOM & STAFF ROOM ON FIRST FLOOR OF
INTERNATIONAL AGRI-BUSINESS MANAGEMENT INSTITUTE AT A.A.U., ANAND.
GENERAL SUMMERY SHEET
SUMMERY COST REMARK
1 Total Civil Cost 15,620,982.68 …(A)
2 Total Plumbing / Drainage Cost 185,712.02 …(B)
3 Total Electrification Cost 586,528.21 …(C)
4 TOTAL PROJECT COST (A) + (B) + (C) Rs. 16,393,223.00 …(D)
(Rupees One Crore Sixty Three Lakhs Ninety Three Thousand Two Hundred Twenty Three only.)
1. Labour will not be allowed to stay in campus except watchman & his family only.
ટ ડર ભરનાર ઠકદાર માટ ખાસ ુ ના ( Special Condition (GST) )
ુ -બીમાં દશાવેલ દર સને-૨૦૨૪-૨૫ના SOR જ
૧. સદર શીડ લ ુ બ GST િસવાયના દરો લા ુ પાડવામાં આવેલ છે .
થી ટ ડર ભરતી વખતે GST િસવાયના દરો ખાસ યાને લેવાના રહશે.
GST ું કુ વ ંુ કરવામાં આવશે અને કો ાકટર GST ભરપાઇ કયા બાદ GSTR-1 અને GSTR-3Bની નકલો
કચેર માં ર ુ કરવાની રહશે અને GST ભરપાઇ કયા ું માણપ લેટર પેડ ઉપર આપવા ું રહશે. સરકાર ીમાં GST
૩. GST નંબર ધરાવતા ન હોય તેવા કો ાકટરને અલગથી GST ંુ કુ વ ંુ કરવામાં આવશે ન હ.
૪. સરકાર ીના ધારાધોરણ જુ બ ર% GST-TDS એજ સીના બીલમાંથી કપાત કરવામાં આવશે.
I / We here by agree to carryout and complete the above mentioned work at _____________________% (In Figure)
_______________________________ percentage (In Words) above / bellow than the rates of items mentioned in
Schedule - B enclosed here with.
Contractor's signature Executive Engineer
Date: Anand Agricultural University,
TECTONICS ARCHITECTURAL CONSULTANTS Page No: 1 of
ANAND AGRICULTURAL UNIVERSITY, ANAND.
NAME OF WORK: CONSTRUCTION OF CLASSROOM & STAFF ROOM ON FIRST FLOOR OF
INTERNATIONAL AGRI-BUSINESS MANAGEMENT INSTITUTE AT A.A.U., ANAND.
It. Total Rate Amount
Description Unit 1% L.C.
No Quantity (Rs.) (Rs.)
1 Demolition of R.C.C. work including stacking of 11.00 Cu.m 1071.63 1082.35
serviceable materials and disposal of unserviceable
materials with all lead and lift etc. compeleted as
directed by EIC.
2 Dismentalling of PCC including stacking of 11.05 Cu.m 616.85 623.02
serviceable material and disposal of unserviceable
material from site of work with all lead and lift etc.
compeleted as directed by EIC.
3 Demolition of Brick Work in cement mortar including 29.55 Cu.m 557.32 562.89
stacking of serviceable materials and disposal of
unserviceable materials with all lead and lift etc.
compeleted as directed by EIC.
4 Dismentalling of terrace (Brick tile covering with 629.65 Sq.m 64.67 65.32
china mosaic water proofing) including stacking of
serviceable materials and disposal of unserviceable
materials with all lead and lift etc. compeleted as
directed by EIC.
5 Removing and scraping of old deteriorated plaster of 132.55 Sq.m 19.69 19.89
any thickness fromm wall / R.C.C member including
stacking of serviceable material and disposal of
unserviceable from site of work with all lead and lift
etc. compeleted as directed by EIC.
6 Dismentalling of Tiles of stone flooring laid in mortar 293.00 Sq.m 48.63 49.12
including stacking of serviceable material and
disposal of unserviceable material from site of work
with all lead and lift etc. compeleted as directed by
7 Dismentling doors, windows, ventilators etc. (wood 10.00 No.s 190.19 192.09
or steel) shutters including chowkhats architraves,
holdfasts and other attachment etc. complete and
stacking them within all lead and lift. (i) Not exceeding
3 Sq.M. in area. complete as per detail drawings and
as directed by E.I.C.
8 Dismentling doors, windows, ventilators etc. (wood 2.00 No.s 254.68 257.23
or steel) shutters including chowkhats architraves,
holdfasts and other attachment etc. complete and
stacking them within all lead and lift. (i) Exceeding
Sq.M. in area. complete as per detail drawings and as
directed by E.I.C.
9 Dismentling steel work including distempering and 363.50 Kg. 3.81 3.85
stacking the materials with all lead and lift etc.
compeleted as directed by EIC.
TECTONICS ARCHITECTURAL CONSULTANTS Page No: 1 of
It. Total Rate Amount
Description Unit 1% L.C.
No Quantity (Rs.) (Rs.)
10 EXCAVATION for foundation UP TO 1.50m DEPTH 349.80 Cu.m 121.72 122.94
including sorting out and stacking of useful materials
and disposing of the excavated stuff for all lead and
lift for loose or soft soil etc., complete as directed by
11 EXCAVATION for foundation FROM 1.50m to 3.00m 267.20 Cu.m 134.95 136.30
DEPTH including sorting out and stacking of useful
materials and disposing of the excavated stuff for all
lead and lift for loose or soft soil etc., complete as
directed by E.I.C.
12 Providing and laying CEMENT CONCRETE 1:3:6 (1 40.85 Cu.m 3064.60 3095.25
cement : 3 coarse sand : 6 hand broken stone
aggregates 40mm nominal size) and curing
consolidation with rammers complete excluding cost
of form work in Plinth … etc., complete as directed by
13 Providing & laying CONTROLLED CEMENT 171.00 Cu.m 4536.22 4581.58
CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing &
shuttering in true line and level etc. but excluding cost
of reinforcement in RCC work for FOOTING for any
type of cross sectional area... etc., complete as
directed by E.I.C.
14 Providing & laying CONTROLLED CEMENT 16.10 Cu.m 6830.15 6898.45
CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing &
shuttering in true line and level etc. but excluding cost
of reinforcement in RCC work for COLUMN UPTO
PLINTH for any type of cross sectional area... etc.,
complete as directed by E.I.C.
15 Providing & laying CONTROLLED CEMENT 16.35 Cu.m 6352.41 6415.93
CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing &
shuttering in true line and level etc. but excluding cost
of reinforcement in RCC work for GROUND BEAMS
& PLINTH BEAM for any type of cross sectional
area... etc., complete as directed by E.I.C.
16 Providing & laying CONTROLLED CEMENT 5.15 Cu.m 4571.38 4617.09
CONCRETE M.200 including the cost of necessary
formwork, compacting with vibrator, curing &
shuttering in true line and level etc. but excluding cost
of reinforcement in RCC work for PLINTH SLAB for
any thickness... etc., complete as directed by E.I.C.
TECTONICS ARCHITECTURAL CONSULTANTS Page No: 2 of
It. Total Rate Amount
Description Unit 1% L.C.
No Quantity (Rs.) (Rs.)
17 Providing and FILLING AVAILABLE EXCAVATED 617.00 Cu.m 135.56 136.92
EARTH (excluding rock) in trenches of plinth, sides of
foundations… etc., in layers not exceeding 20 cm in
depth consolidating each deposited layer by ramming,
watering and dressing the top surface etc.., complete
as directed by E.I.C.
18 Providing and laying and constructing BRICK WORK 1.30 Cu.m 4172.60 4214.33
using common burnt clay building conventional brick
having crushing strength not less than 35 Kg/Sq.cm.
IN FOUNDATION AND PLINTH in cement mortar 1:6
(1 cement : 6 fine sand) in true line and level
including curing, scaffolding, rackingout the joints...
etc. complete as directed by E.I.C.
19 Providing & laying CONTROLLED CEMENT 29.20 Cu.m 6830.15 6898.45
CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing &
shuttering in true line and level etc. but excluding cost
of reinforcement in RCC work for COLUMNS for any
type of cross sectional area... etc., complete above
plinth level upto floor two level as directed by E.I.C.
20 Providing & laying CONTROLLED CEMENT 42.95 Cu.m 6870.86 6939.57
CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing &
shuttering in true line and level etc. but excluding cost
of reinforcement in RCC work for COLUMNS for any
type of cross sectional area... etc., complete from
floor Two level to Three level as directed by E.I.C.
21 Providing & laying CONTROLLED CEMENT 14.20 Cu.m 6911.57 6980.69
CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing &
shuttering in true line and level etc. but excluding cost
of reinforcement in RCC work for COLUMNS for any
type of cross sectional area... etc., complete from
floor Three level to Four level as directed by E.I.C.
22 Providing & laying CONTROLLED CEMENT 18.50 Cu.m 5966.73 6026.40
CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing &
shuttering in true line and level etc. but excluding cost
of reinforcement in RCC work for BEAM for any type
of cross sectional area... etc., complete above Plinth
level to floor Two level as directed by E.I.C.
TECTONICS ARCHITECTURAL CONSULTANTS Page No: 3 of
It. Total Rate Amount
Description Unit 1% L.C.
No Quantity (Rs.) (Rs.)
23 Providing & laying CONTROLLED CEMENT 115.60 Cu.m 6007.44 6067.51
CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing &
shuttering in true line and level etc. but excluding cost
of reinforcement in RCC work for BEAM for any type
of cross sectional area... etc., complete from floor
Two level to floor Three level as directed by E.I.C.
24 Providing & laying CONTROLLED CEMENT 1.50 Cu.m 6048.15 6108.63
CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing &
shuttering in true line and level etc. but excluding cost
of reinforcement in RCC work for BEAM for any type
of cross sectional area... etc., complete from floor
Three level to floor Four level as directed by E.I.C.
25 Providing & laying CONTROLLED CEMENT 0.40 Cu.m 5153.79 5205.33
CONCRETE M.200 including the cost of necessary
formwork, compacting with vibrator, curing &
shuttering in true line and level etc. but excluding cost
of reinforcement in RCC work for SILL with or without
projection for any type of cross sectional area... etc.,
complete above Plinth level to floor Two level as
directed by E.I.C.
26 Providing & laying CONTROLLED CEMENT 2.95 Cu.m 5194.50 5246.45
CONCRETE M.200 including the cost of necessary
formwork, compacting with vibrator, curing &
shuttering in true line and level etc. but excluding cost
of reinforcement in RCC work for SILL with or without
projection for any type of cross sectional area... etc.,
complete from floor Two level to floor Three level as
directed by E.I.C.
27 Providing & laying CONTROLLED CEMENT 2.30 Cu.m 5235.21 5287.56
CONCRETE M.200 including the cost of necessary
formwork, compacting with vibrator, curing &
shuttering in true line and level etc. but excluding cost
of reinforcement in RCC work for SILL with or without
projection for any type of cross sectional area... etc.,
complete from floor Three level to floor Four level as
directed by E.I.C.
28 Providing & laying CONTROLLED CEMENT 0.40 Cu.m 7681.06 7757.87
CONCRETE M.200 including the cost of necessary
formwork, compacting with vibrator, curing &
shuttering in true line and level etc. but excluding cost
of reinforcement in RCC work for LINTEL for any
type of cross sectional area... etc., complete above
Plinth level to floor Two level as directed by E.I.C.
TECTONICS ARCHITECTURAL CONSULTANTS Page No: 4 of
It. Total Rate Amount
Description Unit 1% L.C.
No Quantity (Rs.) (Rs.)
29 Providing & laying CONTROLLED CEMENT 10.50 Cu.m 7721.77 7798.99
CONCRETE M.200 including the cost of necessary
formwork, compacting with vibrator, curing &
shuttering in true line and level etc. but excluding cost
of reinforcement in RCC work for LINTEL for any
type of cross sectional area... etc., complete from
floor Two level to floor Three level as directed by
30 Providing & laying CONTROLLED CEMENT 2.40 Cu.m 7762.48 7840.10
CONCRETE M.200 including the cost of necessary
formwork, compacting with vibrator, curing &
shuttering in true line and level etc. but excluding cost
of reinforcement in RCC work for LINTEL for any
type of cross sectional area... etc., complete from
floor Three level to floor Four level as directed by
31 Providing & laying CONTROLLED CEMENT 1.60 Cu.m 7156.84 7228.41
CONCRETE M.200 including the cost of necessary
formwork, compacting with vibrator, curing &
shuttering in true line and level etc. but excluding cost
of reinforcement in RCC work for CHHAJJA for any
thickness... etc., complete above Plinth level to floor
Two level as directed by E.I.C.
32 Providing & laying CONTROLLED CEMENT 6.70 Cu.m 7197.55 7269.53
CONCRETE M.200 including the cost of necessary
formwork, compacting with vibrator, curing &
shuttering in true line and level etc. but excluding cost
of reinforcement in RCC work for CHHAJJA for any
thickness... etc., complete from floor Two level to
floor Three level as directed by E.I.C.
33 Providing & laying CONTROLLED CEMENT 0.85 Cu.m 7238.26 7310.64
CONCRETE M.200 including the cost of necessary
formwork, compacting with vibrator, curing &
shuttering in true line and level etc. but excluding cost
of reinforcement in RCC work for CHHAJJA for any
thickness... etc., complete from floor Three level to
floor Four level as directed by E.I.C.
34 Providing & laying CONTROLLED CEMENT 1.40 Cu.m 6360.24 6423.84
CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing &
shuttering in true line and level etc. but excluding cost
of reinforcement in RCC work for SLAB for any
thickness... etc., complete above Plinth level to floor
Two level as directed by E.I.C.
TECTONICS ARCHITECTURAL CONSULTANTS Page No: 5 of
It. Total Rate Amount
Description Unit 1% L.C.
No Quantity (Rs.) (Rs.)
35 Providing & laying CONTROLLED CEMENT 99.05 Cu.m 6400.95 6464.96
CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing &
shuttering in true line and level etc. but excluding cost
of reinforcement in RCC work for SLAB for any
thickness... etc., complete from floor Two level to
floor Three level as directed by E.I.C.
36 Providing & laying CONTROLLED CEMENT 4.65 Cu.m 6441.66 6506.08
CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing &
shuttering in true line and level etc. but excluding cost
of reinforcement in RCC work for SLAB for any
thickness... etc., complete from floor Three level to
floor Four level as directed by E.I.C.
37 Providing & laying CONTROLLED CEMENT 3.60 Cu.m 6399.39 6463.38
CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing &
shuttering in true line and level etc. but excluding cost
of reinforcement in RCC work for STAIRCASE (waist
slab) including landing for any thickness... etc.,
complete above Plinth level to floor Two level as
directed by E.I.C.
38 Providing & laying CONTROLLED CEMENT 3.80 Cu.m 6440.10 6504.50
CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing &
shuttering in true line and level etc. but excluding cost
of reinforcement in RCC work for STAIRCASE (waist
slab) including landing for any thickness... etc.,
complete from floor Two level to floor Three level as
directed by E.I.C.
39 Providing & laying CONTROLLED CEMENT 6.90 Cu.m 7828.60 7906.89
CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing &
shuttering in true line and level etc. but excluding cost
of reinforcement in RCC work for WALLS for any
type of cross sectional area... etc., complete above
Foundation level to floor Two level as directed by
40 Providing & laying CONTROLLED CEMENT 4.10 Cu.m 7869.31 7948.00
CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing &
shuttering in true line and level etc. but excluding cost
of reinforcement in RCC work for WALLS for any
type of cross sectional area... etc., complete from
floor Two level to floor Three level as directed by
TECTONICS ARCHITECTURAL CONSULTANTS Page No: 6 of
It. Total Rate Amount
Description Unit 1% L.C.
No Quantity (Rs.) (Rs.)
41 Providing & laying CONTROLLED CEMENT 4.80 Cu.m 7910.02 7989.12
CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing &
shuttering in true line and level etc. but excluding cost
of reinforcement in RCC work for WALLS for any
type of cross sectional area... etc., complete from
floor Three level to floor Four level as directed by
42 P/L T.M.T. bar reinforcement 500D (Tata tisco, 23880.15 Kg. 76.52 77.29
kamdhenu, Nilkanth, National, Gallent, NRE, Vinayak,
Germen) for R.C.C. work including cutting bending
binding with binding wire and placing in position From
Foundation level to floor Two level etc complete as
directed by EIC and as per detail drawings.
43 P/L T.M.T. bar reinforcement Fe 500 / 500D (Tata 43709.05 Kg. 77.56 78.34
tisco, kamdhenu, Nilkanth, National, Gallent, NRE,
Vinayak, Germen) for R.C.C. work including cutting
bending binding with binding wire and placing in
position from floor Two level to floor Three level etc
complete as directed by EIC and as per detail
44 P/L T.M.T. bar reinforcement Fe 500 / 500D (Tata 4977.15 Kg. 78.60 79.39
tisco, kamdhenu, Nilkanth, National, Gallent, NRE,
Vinayak, Germen) for R.C.C. work including cutting
bending binding with binding wire and placing in
position from floor Three level to floor Four level etc
complete as directed by EIC and as per detail
45 Providing and lyaing BRICK WORK using common 9.55 Cu.m 4451.53 4496.05
burnt clay building conventional brick having crushing
strength not less than 35 Kg/Sq.cm. above Plinth
level to floor Two level in cement mortar 1:6 (1
cement : 6 fine sand) in true line and level including
curing, scaffolding, rackingout the joints... etc.
complete as directed by E.I.C.
46 Providing and lyaing BRICK WORK using common 112.30 Cu.m 4493.23 4538.16
burnt clay building conventional brick having crushing
strength not less than 35 Kg/Sq.cm. from floor Two
level to floor Three level in cement mortar 1:6 (1
cement : 6 fine sand) in true line and level including
curing, scaffolding, rackingout the joints... etc.
complete as directed by E.I.C.
TECTONICS ARCHITECTURAL CONSULTANTS Page No: 7 of
It. Total Rate Amount
Description Unit 1% L.C.
No Quantity (Rs.) (Rs.)
47 Providing and lyaing BRICK WORK using common 42.45 Cu.m 4534.93 4580.28
burnt clay building conventional brick having crushing
strength not less than 35 Kg/Sq.cm. from floor Three
level to floor Four level in cement mortar 1:6 (1
cement : 6 fine sand) in true line and level including
curing, scaffolding, rackingout the joints... etc.
complete as directed by E.I.C.
48 Providing and lyaing HALF BRICK WORK using 8.85 Sq.m 677.49 684.26
common burnt clay building conventional brick having
crushing strength not less than 35 Kg/Sq.cm. from
Plinth level to floor Two level in cement mortar 1:4 (1
cement : 4 fine sand) in true line and level including
curing, scaffolding, rackingout the joints... etc.
complete as directed by E.I.C.
49 Providing and lyaing HALF BRICK WORK using 11.10 Sq.m 683.73 690.57
common burnt clay building conventional brick having
crushing strength not less than 35 Kg/Sq.cm. from
floor Two level to floor Three level in cement mortar
1:4 (1 cement : 4 fine sand) in true line and level
including curing, scaffolding, rackingout the joints...
etc. complete as directed by E.I.C.
50 Providing and lyaing HALF BRICK WORK using 5.30 Sq.m 689.97 696.87
common burnt clay building conventional brick having
crushing strength not less than 35 Kg/Sq.cm. from
floor Three level to floor Four level in cement mortar
1:4 (1 cement : 4 fine sand) in true line and level
including curing, scaffolding, rackingout the joints...
etc. complete as directed by E.I.C.
TECTONICS ARCHITECTURAL CONSULTANTS Page No: 8 of
It. Total Rate Amount
Description Unit 1% L.C.
No Quantity (Rs.) (Rs.)
51 Providing 20mm thick double coat MALA CEMENT 144.05 Sq.m 313.07 316.20
PLASTER on interior brick / concrete work for
plastering on walls above Plinth level to floor Two
level comparising of base coat of 12mm thick cement
plaster in CM 1:4 (1 cement: 4 coarse sand) in rough
finishing and 8mm thick top coat of CM 1:2 (1
cement: 2 coarse sand) finished with trovel including
scaffolding, curing and providing & fixing 150mm wide
strip of chicken net at vertical and horizontal joints of
RCC and masonary... etc., complete as directed by
52 Providing 20mm thick double coat MALA CEMENT 1317.95 Sq.m 313.07 316.20
PLASTER on interior brick / concrete work for
plastering on walls from floor Two level to floor Three
level comparising of base coat of 12mm thick cement
plaster in CM 1:4 (1 cement: 4 coarse sand) in rough
finishing and 8mm thick top coat of CM 1:2 (1
cement: 2 coarse sand) finished with trovel including
scaffolding, curing and providing & fixing 150mm wide
strip of chicken net at vertical and horizontal joints of
RCC and masonary... etc., complete as directed by
53 Providing 20mm thick double coat MALA CEMENT 148.95 Sq.m 313.07 316.20
PLASTER on interior brick / concrete work for
plastering on walls from floor Three level to floor Four
level comparising of base coat of 12mm thick cement
plaster in CM 1:4 (1 cement: 4 coarse sand) in rough
finishing and 8mm thick top coat of CM 1:2 (1
cement: 2 coarse sand) finished with trovel including
scaffolding, curing and providing & fixing 150mm wide
strip of chicken net at vertical and horizontal joints of
RCC and masonary... etc., complete as directed by
54 INTERNAL PLASTER: 164.85 Sq.m 317.86 321.04
Providing & applying 15mm THICK CEMENT
PLASTER in single coat on fair side of brick or
concrete wall for interior / exterior plastering from
floor Three level to floor Four level finished even and
smooth in CM 1:4 (1 Cement : 4 Sand) including
finishing with floating coat of neat cement slurry
including necessary curing, scaffolding in true line
and level including providing & fixing 150mm wide
strip of chicken net at vertical and horizontal joints of
RCC and masonary... etc., complete as directed by
TECTONICS ARCHITECTURAL CONSULTANTS Page No: 9 of
It. Total Rate Amount
Description Unit 1% L.C.
No Quantity (Rs.) (Rs.)
55 Providing 20mm thick double coat MALA CEMENT 91.05 Sq.m 281.14 283.95
PLASTER on interior brick / concrete work for
plastering on ceiling surfaces above Plinth level to
floor Two level comparising of base coat of 12mm
thick cement plaster in CM 1:4 (1 cement: 4 coarse
sand) in rough finishing and 8mm thick top coat of
CM 1:2 (1 cement: 2 coarse sand) finished with trovel
including scaffolding, curing... etc., complete as
directed by E.I.C.
56 Providing 20mm thick double coat MALA CEMENT 745.40 Sq.m 281.14 283.95
PLASTER on interior brick / concrete work for
plastering on ceiling surfaces from floor Two level to
floor Three level comparising of base coat of 12mm
thick cement plaster in CM 1:4 (1 cement: 4 coarse
sand) in rough finishing and 8mm thick top coat of
CM 1:2 (1 cement: 2 coarse sand) finished with trovel
including scaffolding, curing... etc., complete as
directed by E.I.C.
57 Providing 20mm thick double coat MALA CEMENT 26.90 Sq.m 281.14 283.95
PLASTER on interior brick / concrete work for
plastering on ceiling surfaces from floor Three level to
floor Four level comparising of base coat of 12mm
thick cement plaster in CM 1:4 (1 cement: 4 coarse
sand) in rough finishing and 8mm thick top coat of
CM 1:2 (1 cement: 2 coarse sand) finished with trovel
including scaffolding, curing... etc., complete as
directed by E.I.C.
58 Providing & applying 20mm THICK SAND FACED 1457.35 Sq.m 390.90 394.81
CEMENT PLASTER using wooden Gutki on wall
upto all height from ground level consisting of 12mm
thick backing coat of CM 1:3 (1 cement : 3 sand) and
8mm thick finishing coat of CM 1:1 (1 cement :
sand) including curing, necessary scaffolding in true
line and level including providing & fixing 150mm wide
strip of chicken net at vertical and horizontal joints of
RCC and masonary… etc., complete as directed by
TECTONICS ARCHITECTURAL CONSULTANTS Page No: 10 of
It. Total Rate Amount
Description Unit 1% L.C.
No Quantity (Rs.) (Rs.)
59 Providing and applying BRICK STAMPING on 32.50 Sq.m 1183.60 1195.44
exterior face of the structure as per sample approved
by the architect and/or engineer - in - charge including
cleaning and brushing the surface, providing requisite
base coat and top coat as per the requirement of the
design, cleaning the surface and making good and
finishing with weatherproof coat etc. complete with all
necessary material, labour, tools, tackles, hardware,
accessories, scaffolding etc. all to the satisfaction of
the architect and/or engineer - in - charge. The rate
shall be for a complete item and applying at all
heights, all floors and all levels (a) Luxture
"Decorcem" - Exposed BRick Finish etc., complete as
directed by E.I.C.
60 Providing and laying cement VATA (10cm x 10cm 136.40 Ru.m 24.04 24.28
size) quarter round in cement mortar 1:1 including
neat cement finishing, watering etc.. compete as
directed by E.I.C.
61 Providing THROATING or plaster drip and moulding 463.10 Ru.m 42.62 43.05
to r.c.c. chajja's and plaster works in true line and
level as per detailed drawing and directed by E.I.C.
62 Providing, laying and fixing 8/10mm thick VITRIFIED 591.00 Sq.m 1298.20 1311.18
TILES (605 x 605mm agl make Carolina pink /
Jhonson 600X600 Travio) flooring over 20mm
(average) flooring over 20mm (average) base of
Cement Mortar 1:6 (1 Cement, 6 coarse sand) on
new surface or fixing on existing flooring by adhesive
materials incluidng dismentalling of exiting flooring
and jointed with flush pointing & cleaning the surface
63 Providing and laying 18mm thick POLISHED 35.30 Sq.m 2555.81 2581.37
GRANITE STONE (hand cut) slab (Minimum 1.50m
long peice) Flooring of steps over 20mm (average)
thick base of cement mortar 1:6 (1 cement : 6 course
sand) laid over and jointed with grey cement slurry
including rubbing, curing, polishing and half round
moulding etc.. complete as per drawing and as
directed by E.I.C.
64 Providing, laying & fixing 300X300mm rectified ivory 29.90 Sq.m 987.29 997.16
Johnson make CERAMIC TILES in flooring over
12mm (average) thick base of cement mortar 1:3 (1
cement : 3 course sand) laid over and finished with
flush pointing in white cement slurry with pigment to
match the shade and colour of the tiles in true line
and level, curing... etc., complete as per detailed
drawing and directed by E.I.C.
TECTONICS ARCHITECTURAL CONSULTANTS Page No: 11 of
It. Total Rate Amount
Description Unit 1% L.C.
No Quantity (Rs.) (Rs.)
65 Providing and fixing pre-cast Rubber Dye / steel Dye 125.35 Sq.m 699.93 706.93
inter locking CONCRETE BLOCK 60mm thick with
grade of concrete M300 pnumatic compressed /
vibrated mechanically and as per approved design
Confirming to IS 15658 : 2006 including 35 mm Sand
layer for levelling and filling the joint with sand in
proper line and level as per guidlines of IRC : SP 63-
2018 etc. complete as directed by EIC.
66 Providing, laying and fixing 8/10mm thick VITRIFIED 27.60 Sq.m 1183.19 1195.02
TILES (605 x 605mm agl make Carolina pink /
Jhonson 600X600 Travio) in skirting over 10mm
(average) base of Cement Mortar 1:3 (1 Cement,
coarse sand) on new surface or fixing on existing
skerting by adhesive materials incluidng dismentalling
of exiting skerting and jointed with flush pointing &
cleaning the surface etc. complete.
67 Providing and laying 18mm thick POLISHED 18.55 Sq.m 2449.22 2473.71
GRANITE STONE (hand cut) slab (Minimum 1.50m
long) in riser of steps, skerting, Dado laid over the
base of 10mm th. of C.M. 1:3 (1 cement : 3 course
sand) and jointed with grey cement slurry including
rubbing, curing and polishing etc.. complete as per
drawing and as directed by E.I.C.
68 Providing and laying 8mm thick WHITE GLAZED 131.15 Sq.m 975.71 985.47
TILES (Blanco 300x450-Kajaria, star white 300x450-
Bonzer, New white glaze 300x450-Somani, White
300x450-Jhonson) on wall on a bed of 12mm thick
cement mortar 1:3 (1 Cement, 3 Coarse sand)
finished with flush pointing in white cement, curing etc
complete as directed by EIC.
69 Providing and fixing 30mm thick Both Side Laminated 37.85 Sq.m 4434.41 4478.75
Water Proof FLUSH DOOR shutters of
Archid/Anchor/Green Ply make including first class
hardwood and cross band, block board core with
plywood face panels, 6mm thick batten patti all
around the shutter including 1mm thk. laminate on
both the side including S.S. AISI 304 grade fixtures of
Kich make (1) S.S. Hinges without bearing
125x62x2mm - 4 no.s, (2) S.S. Tower Bolt flat 150mm
- 1 no.s, (3) S.S. Handle 2mmx150mm - 2 no.s, (4)
S.S. Aldrop combi. of satin & glossy finish 16mm dia.
x 250mm - 2 no.s with necessary screws including
providing and applying primer coat Asian / Berger
make and two coats of oil painting of Asian / Berger
make to edges of flush door shutter etc. complete as
per detail drawings and as directed by E.I.C.
TECTONICS ARCHITECTURAL CONSULTANTS Page No: 12 of
It. Total Rate Amount
Description Unit 1% L.C.
No Quantity (Rs.) (Rs.)
70 Providing and fixing MS door with grill ventilator 2.25 Sq.m 4581.57 4627.39
using 40x40x6 mm MS angle frame fixed in RCC or
brick masonary, shutter frame 30x30x3mm MS angle
with 25x5mm MS flat & 2mm thick MS plate with
necessary 16mm dia & 250mm long MS aldrap -
No.s, MS handles 150mm - 2 No.s, MS hinges
125mm - 4 No.s etc including primer coat of red oxide
and two coat white oil paint of Asian/Berger including
cleaning, brushing etc complete as per detailed
drawing and as directed by E.I.C.
71 Providing & fixing 18mm thick GRANITE STONE 106.35 Sq.m 3380.49 3414.29
single or sandwhich type at door / window sill, jams,
sofit, Urinal partition etc. fixing with CM 1:2 (1
cement: 2 coarse sand), Araldite and screws if
necessary including mirror polishing and making
quarter round moulding on both the sides, making
gissi in wall / RCC for resting and finishing with colour
cement etc. complete as directed by E.I.C.
(Measurement shall be done as per each & every
stone used with its length & width)
72 Providing and fixing fully glazed 15 micron colour 58.00 Sq.m 4092.98 4133.91
anodized Aluminium THREE TRACK SLIDING
WINDOW (2 shutters of Glass & 1 shutter of
mosquito net zali) with fix Glazing using Aluminum
Section of “Jindal Aluminium Ltd.,” with 3 track bottom
track top and side 21517 (92.00x31.75x2.00 @
kg/m) including sliding shutter having top and bottom
handle side section 21515 (18.00x40.00x2.00 @
0.696 kg/m), inter lock section
(18.00x40.00x2.00 @ 0.817 kg/m) with 6mm thick
plain glass Modi / Saint gobain, SS 304-15 mesh x27
gauge Mosquito net fixing with C channel (3/4)
(Alluminium) including wall fixtures and fastening with
EPDM Jumbow rubber glass seal, glass wool, S.S.
concealed lock, TPI bearing, aluminium cleats, Silicon
sealant, screw and nails also painted/powder coated
73 Providing and fixing 15 micron colour anodized 0.75 Sq.m 1099.19 1110.18
Aluminium chanel plus PVC blades LOUVERED
GLASS VENTILATOR of Jindal / equivalent make
having 6 blades and vertical intermediate partition
section S4858 (100.00x25.00x1.50 @ 0.988 kg/m) if
width of ventilator exceeds 600mm, 4mm thick frosted
or obscurd on one side glass of Modi/Saint gobain
make including fixtures & fastenings, aluminum
cleats, silicon sealents, screws and nails also painted
/ powder coated etc. complete. as per detail drawing
and as directed by the EIC.
TECTONICS ARCHITECTURAL CONSULTANTS Page No: 13 of
It. Total Rate Amount
Description Unit 1% L.C.
No Quantity (Rs.) (Rs.)
74 Providing and fixing fully glazed 15 micron colour 0.75 Sq.m 2397.03 2421.00
anodized Aluminium FIXED MOSQUITO NET
SHUTTERS using Aluminum Section of “Jindal
Aluminium Ltd.,” with outer periphery section
(18.00x40.00x2.00 @ 0.696 kg/m), intermediate
section 20567 (18.80x50.00x1.50 @ 0.601 kg/m) with
SS 304-15 mesh x27 gauge Mosquito net fixing with
C channel (3/4) (Alluminium) including wall fixtures
and fastening, aluminium cleats, Silicon sealant,
screw and nails also painted/powder coated etc.
complete. as per detail drawing and as directed by
75 Proving and fixing GLAZING fixed on alluminum 43.35 Sq.m 4500.00 4545.00
frame with 5mm thick reflective glass of Saint Gobain
make of approved colour and 3mm thick perforated
alluminium composite panel of approved design in
some portion for air circulation fixing with EPDM
rubber gasket / ring, powder coated screws including
making water tight joints with all necessary fixing
material as per details & drawings etc., complete as
directed by E.I.C. (Alluminium frame will be paid
76 Providing and fixing M.S. GRILL of required pattern 1452.60 Kg 110.40 111.51
(Fixed / Openable) at balcony, in window frames, in
RCC, in Masonry etc. with M.S. flats at required
spacing and frame all around, square or round bars
with round headed bolts & nuts or by screws at all
heights including welding, grinding, fixing in position,
applying ready mixed red lead priming coat and
painting two coats of Synthetic enamel paint of
asian/berger make etc., complete as per detailed
drawing and directed by E.I.C.
77 Providing, making and fixing STEEL WORK Welded 181.45 Kg 132.90 134.23
in build up sections (ISA, C, T, I, Rectangular /
circular pipe, Bar, flats, plates etc.) in trusses and
trussed purlins including principal tie, rafters, struts &
slings members connected with Gusset plats, base
plate, bearing plate, cleat angles and the like and in
railling / openable gate with locking arrangement
including cutting, hoisting, fixing in possition, applying
ready mixed red lead priming coat and painting two
coats of Synthetic enamel paint of asian/berger make
in true line and lvl. as per detailed drawing etc.
completed as directed by E.I.C.
TECTONICS ARCHITECTURAL CONSULTANTS Page No: 14 of
It. Total Rate Amount
Description Unit 1% L.C.
No Quantity (Rs.) (Rs.)
78 Providing & Applying (two coats) of Birla or Asian 1433.95 Sq.m 122.22 123.44
acrylic LAPY (PUTTY) and two coats of primer of
approved brand and manufacture and two coats of
PLASTIC EMULSION PAINT of Asian/Berger on
internal wall surafce of required shade approved by
enginner incharge and to give an even shade
including thoroughly brushing the suraface to remove
all dirts, dust & remains of loose powedered materials
& mortar durt and sand papered smooth including
necessary scaffolding, etc.. complete as directed by
E.I.C. complete as directed by E.I.C.
79 Providing & Applying (two coats) of Birla or Asian 621.10 Sq.m 127.69 128.97
acrylic LAPY (PUTTY) and two coats of primer of
approved brand and manufacture and two coats of
PLASTIC EMULSION PAINT of Asian/Berger on
internal ceiling surafce of required shade approved by
enginner incharge and to give an even shade
including thoroughly brushing the suraface to remove
all dirts, dust & remains of loose powedered materials
& mortar durt and sand papered smooth including
necessary scaffolding, etc.. complete as directed by
E.I.C. complete as directed by E.I.C.
80 Providing, applying and finishing wall with two coats 2041.40 Sq.m 119.07 120.26
of ASIAN, APEX ULTIMA PAINT/Berger on
exteranal wall surafce of required shade approved by
enginner incharge and to give an even shade one
(base) coat of primer including thoroughly brushing &
brooming the suraface to remove all dirts, dust &
remains of loose powedered materials & mortar durt
including necessary scaffolding, curing etc.. complete
as directed by E.I.C.
81 Providing and laying white glazed tiles equal size 713.80 Sq.m 1043.59 1054.03
pieces for CHINA MOSAIC WATER PROOFING
TREATEMENT to terrace including cleaning the
surface, Opening the cracks in 'V' groove pattern &
filling the same with cement mortar in 1:1 (1 cement:
1 sand) including brick bat bedding as to have proper
slope over a layer of CM 1:3 (1 cement: 3 sand) and
filling the joints with CM 1:1 including finishing the top
surface with 20mm equal size white glazed tiles
pieces including roung shape vata, with filling white
cement in joints, using chemical water proofing as per
mfg., specification & standards with cleaning top
surface using acid including drip moulding at the
junction of vata & plaster etc.. complete as directed
TECTONICS ARCHITECTURAL CONSULTANTS Page No: 15 of
It. Total Rate Amount
Description Unit 1% L.C.
No Quantity (Rs.) (Rs.)
82 Providing & applying CHEMICAL WATER 49.75 Sq.m 354.56 358.11
PROOFING treatment to the terrace including
Surface cleaning: All surface shall be thoroughly
cleaned with mechanical means or wire brush to
remove dust dirt & all loose portion from the surface
of terrace & parapet wall & wash with water. Surface
preparing: All cracks will be opened in V-shape &
sealed wirh Dr Fixit Crack X Paste & any patch work
will be repaired with polymer modified mortar,
providing and applying two coat of Dr.Fixit pidifine 2K
on entire inside area of sunk. Two coat of Dr.fixit
pidifine 2K(10 kg Powder + 5 lit Liquid) shall be
applied on ready surface in vertically & horizontally
direction which is brsh applied waterproofing coating
& provides excellent impermeable coating & flexible
enough to take care of minor cracks in concrete &
plaster & good adhesion with cementitious surfaces
etc. completed by EIC.
83 Providing & applying CHEMICAL WATER 28.35 Sq.m 301.15 304.16
PROOFING treatment to the terrace / sunk slab
including cieaning the surface opening the creaks in "
V " grooves pattened filling the same water proof
cement mortar 1:1(1 cement, 1 sand ) including B.B
as directed to have proper slope over a layer of C.M.
1:1 (1 cement, 1 sand) including finishing the top
surface with 15mm. thick water proof cement plaster
in C.M. (1:3) (1 cement, 3 sand) and finishing with a
floating coat of neat cement slurry using chemical
water proofing compound as per manufactures
specifications and standard specifications as per
indian Water proofing or equivalent including curing
its with specified period as directed and thickness to
very between 75 mm x 100 mm to have proper slope
and gradient including vata of 100 mm x 100 mm size
on with drip mould inside periphery of the parapet /
beam in C.M. 1:1 (1 cement , 1 sand ) etc. completed
84 Providing & Laying CINDER FILLING in Sunk slab 7.10 Cu.m 1111.00 1122.11
including compacting manually with rammer and
finishing true line & level at all floor level etc..
complete as directed by E.I.C.
85 Providing and laying CEMENT CONCRETE 1:3:6 (1 2.85 Cu.m 3146.02 3177.48
cement : 3 coarse sand : 6 hand broken stone
aggregates 40 mm nominal size) and curing
consolidation with rammers complete excluding cost
of form work from floor Two level to floor Three level
etc., complete as directed by E.I.C.
TECTONICS ARCHITECTURAL CONSULTANTS Page No: 16 of
It. Total Rate Amount
Description Unit 1% L.C.
No Quantity (Rs.) (Rs.)
86 Providing and Fixing PVC Water Tank of Sintex Pure 3000.00 Litre 12.50 12.63
Water tanks of below mensioned features :
Anitlbacterial, Virgin plastic, Food grade plastic, 100%
UV stabilised, rust proof, brighter, stronger, protection
against algae formation, maintanamnce free, triple
layer well packed lid of CCWS 0100-01-PURE of
required capacity including inlet & outlet nipple etc
87 Carring out plinth treatment to post 162.40 Sq.m 123.12 124.35
construction/existing structure by spraying chemical
solution for TERMITE CONTROL TREATMENT
including labour and material consistant with I.S.I.
specification. Using Chlordene and chiorpurfiles
EC. as per 6131_paret-II consentration weight one
percent is recommended i.e. one litre 20 EC chemical
emulsion with 19 litre give 1% concentration inclusive
of one litre chemical emulsion appiciation at the rate
of 5 Litre chemical / Sq.m of surface is recommended
as per I.S. etc. complete as directed by EIC.
88 Fixing the new reinforcement having 8 / 10 mm dia. 300.00 No. 166.65 168.32
with existing concreting with REBARING including
boring holes of appropriate dia. and a depth of
150mm in concrete, cleaning the holes, fitting the
reinforcement in possition and fill up FISCHER
chemical in the remainng gap in proper manner etc.
complete as directed by EIC. (Reinforcement will be
paid separately)
89 Fixing the new reinforcement having 12mm dia. with 98.00 No. 194.43 196.37
existing concreting with REBARING including boring
holes of appropriate dia. and a depth of 150mm in
concrete, cleaning the holes, fitting the reinforcement
in possition and fill up FISCHER chemical in the
remainng gap in proper manner etc. complete as
directed by EIC. (Reinforcement will be paid
90 Fixing the new reinforcement having 16mm dia. with 151.00 No. 222.20 224.42
existing concreting with REBARING including boring
holes of appropriate dia. and a depth of 150mm in
concrete, cleaning the holes, fitting the reinforcement
in possition and fill up FISCHER chemical in the
remainng gap in proper manner etc. complete as
directed by EIC. (Reinforcement will be paid
TECTONICS ARCHITECTURAL CONSULTANTS Page No: 17 of
It. Total Rate Amount
Description Unit 1% L.C.
No Quantity (Rs.) (Rs.)
91 Extra for additional height of PROPPING AND 38.85 Sq.m 403.71 407.75
CENTRING where the height of propping and
centering exceedes 4.0m between supporting floor to
ceiling including temporory brick or stone pillors for
supporting as required for the height more than 4.0m
and upto 5.00m etc. completed as directed by EIC.
92 Extra for additional height of PROPPING AND 5.20 Sq.m 707.77 714.85
CENTRING where the height of propping and
centering exceedes 4.0m between supporting floor to
ceiling including temporory brick or stone pillors for
supporting as required for the height more than 5.0m
and upto 6.00m etc. completed as directed by EIC.
93 Extra for additional height of PROPPING AND 25.65 Sq.m 592.04 597.96
CENTRING where the height of propping and
centering exceedes 4.0m between supporting floor to
ceiling including temporory brick or stone pillors for
supporting as required for the height more than 6.0m
and upto 7.00m etc. completed as directed by EIC.
TOTAL COST OF CIVIL WORKS
Sign of contractor Executive Engineer,
TECTONICS ARCHITECTURAL CONSULTANTS Page No: 18 of
(PLUMBING AND SANITARY WORKS)
It. Total Rate Rate with Amount
Description Unit
No. Quantity (Rs.) 1% L.C. (Rs.) (Rs.)
B PLUMBING & SANITATION ITEMS
1 Providing, laying and jointing in true line and level 32.95 Ru.m 146.65 148.12
40mm dia. U-PVC PLUMBING PIPE line (SCH-40)
including fitting of (FINOLEX / SUPREME /
DUTRONE / ASTRA) as approved by Engineer in
charge. Pipe shall be fixed on the wall with the help
of clamp at every 2 meter c/c or shall be concealed
as directed including necessary fittings etc. including
testing of pipe and joints and fixing the same with
adhesive solvent, including cost of all material etc..
complete as directed by E.I.C.
2 Providing, laying and jointing in true line and level 26.35 Ru.m 90.93 91.84
25mm dia. U-PVC PLUMBING PIPE line (SCH-40)
including fitting of (FINOLEX / SUPREME /
DUTRONE / ASTRA) as approved by Engineer in
charge. Pipe shall be fixed on the wall with the help
of clamp at every 2 meter c/c or shall be concealed
as directed including necessary fittings etc. including
testing of pipe and joints and fixing the same with
adhesive solvent, including cost of all material etc..
complete as directed by E.I.C.
3 Providing, laying and jointing in true line and level 12.50 Ru.m 71.93 72.65
15mm dia. U-PVC PLUMBING PIPE line (SCH-40)
including fitting of (FINOLEX / SUPREME /
DUTRONE / ASTRA) as approved by Engineer in
charge. Pipe shall be fixed on the wall with the help
of clamp at every 2 meter c/c or shall be concealed
as directed including necessary fittings etc. including
testing of pipe and joints and fixing the same with
adhesive solvent, including cost of all material etc..
complete as directed by E.I.C.
4 Providing and fixing brass Ball cock (PVC HDP 1.00 Nos. 2505.31 2530.36
black) 40mm dia. of approved quality with
necessary fittings including fixing in pipeline and
testing the same etc... complete as directed by E.I.C.
5 Providing and fixing 40mm dia. Zoloto bronze 2.00 Nos. 2505.31 2530.36
handle valve including fixing in pipeline and testing
the same… etc., complete.as directed by EIC
6 Providing and fixing 25mm dia. Zoloto bronze 2.00 Nos. 1078.78 1089.57
handle valve including fixing in pipeline and testing
the same… etc., complete.as directed by EIC
7 Providing and fixing 15mm dia. Bib tap with flange 7.00 Nos. 1310.98 1324.09
of Jaquar Florentine Series make model no. FLR-
5047N / Hindware element series make F360004
including fixing in pieline and testing the same…
etc., complete., as directed by EIC
TECTONICS ARCHITECTURAL CONSULTANTS Page No: 1 of
(PLUMBING AND SANITARY WORKS)
It. Total Rate Rate with Amount
Description Unit
No. Quantity (Rs.) 1% L.C. (Rs.) (Rs.)
8 Providing and fixing 15mm dia. angular Stop tap 6.00 Nos. 986.01 995.87
with wall flange of Jaquar Florentine series make
FLR-5053N / Hindware element series make
F360006 including fixing in pipeline and testing the
same…etc., complete as directed by EIC
9 Providing and fixing Cera brand wash down water 4.00 Nos. 4116.54 4157.71
closet European type W.C. pan (540x390x400mm)
CERA CAMELIA make Modal No.3145 Snow white /
Hindware model no. 20011 or 20002 with integral
"P" or "S" trap including snow white quality plastic
seat cover Camelia make Modal no. 2380 with jet
spray & P.V.C. pipe connected, 15mm dia. angular
Stop tap with wall flange of Jaquar Florentine series
make FLR-5053N / Hindware element series make
F360006, jointing the trap with soil pipe in cement
mortar 1:1(1 Cement: 1 Fine sand) and testing the
same etc. complete as directed by E.I.C.
10 Providing and fixing 25 mm dia. Flush cock of 4.00 Nos. 1881.76 1900.58
Jaquar make modal no.ALD-081 + Florentine Series
FLR-5083NK / Hindware make model no. F850105
+ F360052 including fixing in pipe line and
necessary testing etc Complete as directed by E.I.C.
11 Providing and fixing of Urinal (Cera make model no. 4.00 Nos. 1781.27 1799.08
5001) White earthenware flat back or corner type of
size 440 mm X 265 mm X 315mm including
connection the urinal with waste pipe in trap… etc.,
complete, including the cost of PVC connection pipe
and testing the same for leak proof etc. complete as
directed by E.I.C.
12 Providing & fixing white colour flats Vetrious china 2.00 Nos. 4899.47 4948.46
WASH BASIN Cera make Cadal model no.2810 /
Hindware model no. 10010 of size 500mm x 400mm
with single hole for pillar tap with C.I. or M.S.
brackets (Painted white) including cutting holes &
making good the same, including fixing C.P. Brass
waste coupling 32mm dia. & 32mm dia. rigid P.V.C.
waste pipe & 15mm dia. pillar tap with lift type
operating k nob & base flange of Jaquar Florentine
series make Model no. FLR-5015 / Hindware
element series model no. F360001 screwed down
high pressure with screw shank and back nuts &
rubber plugs, 15mm dia. angular Stop tap with wall
flange of Jaquar Florentine series make FLR-5053N
/ Hindware element series make F360006, 15mm
P.V.C. connection pipe etc.. complete as ditectrd by
TECTONICS ARCHITECTURAL CONSULTANTS Page No: 2 of
(PLUMBING AND SANITARY WORKS)
It. Total Rate Rate with Amount
Description Unit
No. Quantity (Rs.) 1% L.C. (Rs.) (Rs.)
13 Providing and fixing 600 mm X 450 mm Bevelled 2.00 Nos. 850.90 859.41
edge Mirror or superior glass mounted on 6mm
thick AC sheet or plywood sheet and fixed to
wooden plugs with CP brass screwws and washers,
including fixing glass shelevs of 600 mm X 120 mm
size with CP brass bracket support and guard rail
fixed to wooden plugs with CP brass screws etc.
complete as directed by EIC
14 Providing and fixing P.V.C. Nahni Supreme Trap 8.00 Nos. 242.48 244.90
(110x75mm) nominal diameter of self cleaning
design with P.V.C. greeting zali 110mm in size
including fixing P.V.C. reducer & rubber paking ring
& jointing with adhesive solvent cement iincluding
cost of cutting & making good the walls & floor and
testing the same etc. complete as directed by E.I.C.
15 Providing, laying and jointing (to level or slopes) 43.00 Ru.m 427.57 431.85
110mm internal dia. P.V.C. pipes of working
pressure 6 kg/sq.cm (FINOLEX / SUPREME /
DUTRONE / ASTRA) for drainage-line in floors
including necessary fitting such as bends, tees,
clamps at interval of 2m c/c, rubber packing ring,
door T, Door cap etc. testing of pipe line, jointing
with adhesive solvent cement including cost of
jointing materials and all other necessary fixtures,
fitting air and water tight testing the line including
cutting and making floors and walls as per
original/good enough if require.... etc., complete. as
directed by E.I.C.
16 Providing, laying and jointing (to level or slopes) 45.45 Ru.m 235.87 238.23
75mm internal dia. P.V.C. pipes of working
pressure 6 kg/sq.cm (FINOLEX / SUPREME /
DUTRONE / ASTRA) for drainage-line in floors
including necessary fitting such as bends, tees,
clamps at interval of 2m c/c, rubber packing ring,
door T, Door cap etc. testing of pipe line, jointing
with adhesive solvent cement including cost of
jointing materials and all other necessary fixtures,
fitting air and water tight testing the line including
cutting and making floors and walls as per
original/good enough if require.... etc., complete. as
directed by E.I.C.
17 Providing, laying and jointing (to level or slopes) 9.85 Ru.m 115.86 117.01
40mm internal dia. P.V.C. rigid pipes of working
pressure 6 kg/sq.cm (FINOLEX / SUPREME /
DUTRONE / ASTRA) for drainage-line in floors
including necessary fitting such as elbow or tees
etc. testing of pipe line, jointing with adhesive
solvent cement including cost of jointing materials
and all other necessary fixtures, fitting air and water
tight testing the line including cutting and making
floors and walls as per original/good enough if
require.... etc., complete. as directed by E.I.C.
TECTONICS ARCHITECTURAL CONSULTANTS Page No: 3 of
(PLUMBING AND SANITARY WORKS)
It. Total Rate Rate with Amount
Description Unit
No. Quantity (Rs.) 1% L.C. (Rs.) (Rs.)
18 Providing and fixing 110mm dia. P.V.C. Cowl vent 2.00 Nos. 55.83 56.39
of working pressure 4 kg/sq.cm including jointing
with Supreme adhesive solevent cement including
fixing the same in true line and level… etc.,
completeed by EIC
19 Providing and fixing 75mm dia. P.V.C. Cowl vent of 2.00 Nos. 49.72 50.22
working pressure 4 kg/sq.cm including jointing with
Supreme adhesive solevent cement including fixing
the same in true line and level… etc., completeed by
20 Providing, laying and jointing (to level or slopes) 156.40 Ru.m 326.67 329.93
110mm internal dia. rigid PVC pipes of working
pressure 6 kg/sq.cm for RAIN WATER (FINOLEX /
SUPREME / DUTRONE / ASTRA) fitted in walls
including necessary fitting such as bends, tees,
clamps at interval of 2m c/c, door T, rubber packing
ring etc. including jointing with adhesive solvent
cement including cost of jointing materials and all
other necessary fixtures, fitting air and water tight
testing the line including cutting and making floors
and walls as per original/good enough if require....
etc., complete. as directed by E.I.C.
21 Dismentalling C.I. Pipes, G.S.W. pipes, A.C. 287.30 Ru.m 72.30 73.02
pipes or P.V.C. Pipes with fitting and clamps
including disposed of useful materials and unuseful
material and cleaning the site with all lead and lift for
any Dia. of pipes etc. compeleted as directed by EIC.
22 Dismantling santtary fittings like wash basin, W.C. 10.00 No. 410.13 414.23
pan Indian and European type, flushing tank etc.
including stacking the materials with all lead and lift.
etc. compeleted as directed by EIC.
TOTAL COST OF PLUMBING & SANITATION WORKS
Sign of contractor Executive Engineer,
TECTONICS ARCHITECTURAL CONSULTANTS Page No: 4 of
(ELECTRIC WORKS)
ANAND AGRICULTURAL UNIVERSITY, ANAND.
NAME OF WORK: CONSTRUCTION OF CLASSROOM & STAFF ROOM ON FIRST FLOOR OF
INTERNATIONAL AGRI-BUSINESS MANAGEMENT INSTITUTE AT A.A.U., ANAND.
Sr no. Desciption Qty. Rate Per Amount
1 P/F Point wiring for light/Bell with 2-1.5 Sqmm & earth wire of
Sqmm (green) both are of ISI marked 1.1 KV grade FRLS PVC insulated
multistandard copper wire in with medium class rigid PVC pipe and
accessories of pipe to be erected concealed in/wall & ceiling
complete 6A modular Type Switch/bell push & accessories and earth
continuity of following type erected MS/Metallic box, single mounting
base frame covered with textured/metallic front plate moulds
erected on/in wall/ ceiling as per pipe erected, with necessary Lamp
holder/Ceiling rose/H.D. Connector as directed using.
2 Supplying and erecting approved make oscillating type bracket fan
A.C. 23OV. 50cy/s 400/450 mm sweep wall mounted with height
adjustment and rotary tilting device complete with guard, flexible
Core plug top complete erected with lead wires as directed.
3 Providing & fixing Point wiring for looped plug with 6 Amp modular
type switch and 5 pin socket erected PVC/ Metallic box ,Single
mounting base frame covered with textured/metallic front plate
modules erected on in wall ceiling with following type accessories Cat-
III Material as per brand attached herewith as per drawings etc
complete as directed by Engineer incharge
4 Providing & fixing following type of modular type accessories
mounted with PVC /Metallic box single mounting base frame covered
with textured/metallic front plate modules erected with Necessary
connection as desired by engineer in charge. using sp Cat-III Material
as per brand attached herewith &as per drawings etc complete as
directed by Engineer incharge
A 16A one-way switch SP cat-III 60.00 204.02 No
B 6/16A Universal socket cat-III 60.00 224.22 No
5 Providing & erecting approved make decorative ultra slim linear LED
20w LED 6k(4') Lighting fixture with extruded al heat sink
environmental friendly energy ready to use pack fitting with tube
completed with electronic ballast assembly housed in engineering
plastic cover with LED light holders erected with necessary lead wire
& hardware materials and adapter if required as per brand attached
herewith &as per drawings etc complete as directed by Engineer
TECTONICS ARCHITECTURAL CONSULTANTS Page No: 1 of
(ELECTRIC WORKS)
Sr no. Desciption Qty. Rate Per Amount
6 Supplying and erecting LED indoor fittings with LEDs of wattage
Watt to 0.5 Watt assembled on single MCPCB, with housing used as a
heat sink shall be made of thick sheet Steel conforming to IS:
513/CRCA/aluminium pressure die cast powder coated and high U.V.
& corrosion resistance with diffuser housed in aluminium casted
body with company mark/name
160V to 270V,Power Factor more than 0.95, THD < 15 %,
CCT 3000 K to 6500K,
Luminaire efficacy> 85 lumens/watt
LED driver efficiency > 85 %
( fitting required LM-79 & LM-80 Certificates)(NOTE: Below
description have shown ranges of Wattage capacity of LED
fittings.The Engineer incharge may select any wattage capacity
between the ranges shown.)(B) LED Panel Light with provision for
Plane front frame with translucent cover fixed to housing
complete.IP20(vii) from 45 to 48 watts, 24" x 24", Surge-2 KV
Providing & erecting Sheet steel powder coated three phase 12 way
SS Double door for three phease outgoing horizontal box MCB
distribution bord flish/surface mounted fitted with bus bar, neutral
link, earth bar and DIN rail confirming to IS13032 and BS5486-1986
without MCB to house appropriate nos of MCB (the DBs should be
used of same comapny of MCB to be used. Using material as per
brand atteched herewith & as per drawings etc complete as directed
by EIC. 3.00 3874.36 No
8 P/F approved make ELCBs/RCCBs confirming to IS 12640 and having
sensitivity of 30 mA and short circuit with stand capacity of 6KA and
suitable for operation on 3 phase and neutral 415V having
characteristic of quick action & tripping with all advance feature & do
not incorporate any electronic component for 63Amps FP using cat-
III material as per brand atteched herewith & as per drawings etc
complete as directed by EIC.
9 Providing and erecting four pole MCB isolator A.C. 22 duty confirms
to IS 13947-3 240V 40A in existing metal clad MCB distribution
board for 63A using cat-III material as per brand atteched herewith
& as per drawings etc complete as directed by EIC
10 P/F miniature circuit breaker single pole 6 A to 32 A suitable to
operate on 240 V A.C. system & having overload & short circuit
tripping elements & breaking capacity 10 KA to be erected in existing
M.S. box confirming to IS 8828/1996 with ISI mark using cat-III
material as per brand atteched herewith & as per drawings etc
complete as directed by EIC.
TECTONICS ARCHITECTURAL CONSULTANTS Page No: 2 of
(ELECTRIC WORKS)
Sr no. Desciption Qty. Rate Per Amount
11 P/F Main with following size 1.1KV grade FRLS PVC insulated ISI
marked standard Copper conductor wire with medium class Rigid PVC
pipe and accessories of pipe to be erected concealed in /flushed on
wall/celing with 2.5 sqmm copper conductor FRLS PVC insulated
standared wire of green colour for earth continuity using material as
per brand atteched herewith etc complete.
2wire 2.50 Sq.mm 1300.00 82.82 Mtr
12 Providing and erecting Out door Street Light IP66 Powder coated
Pressure die Cast Aluminium Compact Hight Power 60W LED with
LENS with heat resistant toughened glass with lens.Material as per
brand attached herewith &as per drawings etc complete as directed
by Engineer incharge
13 Providing & Fixing B''Class galvanised pipe of TATA /Jindal /Ambika
32mm out side dia 45cms long duly welded on plate
20cmX20cmX3mm thick M.S base Plate erected on wall or corner for
mounting street light luminarie with necessary hardware materials
duly painted.Material as per brand attached herewith &as per
drawings etc complete as directed by Engineer incharge
14 Supplying & erecting funnel type earthing having earth plate of
following size burred in specifically prepared earth pit 3 mtr. below
ground with 40 kg. charcoal and salt with alternate layers of charcoal
& salt, 20mm.dia. G.I. pipe with Funnel with a wire mesh for
watering & bricks masonry block, C.I. Cover complete as per para
of IS 3043 with necessary length of double Galvanised Iron / copper
earth wire No 6 SWG bolted with lug to the plate and covered in
mm dia. G.I. pipe 2.5 mtr long complete connected to the nearest
switch gear with end socket as per direction & duly tested by earth
tester confirming to IS (As per drawing) with 60 x 60x 0.315 cms.
Copper earth Plate
15 Providing and erecting XLPE(IS:7098)(I)-88 ISI armoured cable
multistrand / Solid Copper conductor for 1.1 KV. to be laid on wall
with necessary clamps or in existing trench / pipe at road crossing or
floor of following size of cables. 4 core 6 sq.mm
16 Providing and erecting busbar chamber confirming to IS-375
fabricated from 16 G.M.S. sheet, dust & vermin proof having hinged
door with rubber gasket and necessary busbar supports with COPPER
busbar having current density not more than 1.6 Amp. / sq.mm
(Rated current / cross section area) duly wrapped with colour
insulation tape for phase sequence, three phase & neutral each
suitable for following current capacity with necessary painting
mounted on wall or pedestal frame of required size with necessary
Suitable for 200 Amp. capacity 1.00 5731.75 Mtr
TECTONICS ARCHITECTURAL CONSULTANTS Page No: 3 of
(ELECTRIC WORKS)
Sr no. Desciption Qty. Rate Per Amount
17 Providing and erecting Approved make Four pole moulded case
circuit breaker having breaking capacity ICU of 50 KA and above at
415 V having Normal current rating 200A. with variable Thermal &
magnetic release suitable to work on A.C.supply 50 c/s. With all
internal connections, spreader tinned copper & complete erected in
existing 16 G.M.S. housing.
18 Providing and erecting Inverter based approved make split air-
conditioning unit consisting of condensing unit with variable speed
fan motor, inverter type hermetically sealed rotary compressor with
accessories etc. duly connected separately erected evaporating unit
and blower motor with its accessories by means of extra supplied
proper insulated copper tubing,drain PVC pipes suitable for ( cost
includes Eco Friendly green gas charging and 15A plug top & Remote
Control & MS Stand) with necessary core cutting.(B) for 1.5 ton
capacity- Premium Cat.
Sign of contractor Executive Engineer,
TECTONICS ARCHITECTURAL CONSULTANTS Page No: 4 of
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
TUBELIGHT (2.55 mt.HT.)
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
16 AMP PLUG (0.975 MT.HT.)
20 W DOWN LIGHT POINT
JUNIOR ENGINEER, A.A.U. DEPUTY ENGINEER, A.A.U. EXECUTIVE ENGINEER, A.A.U.
1) ALL DIMENTIONS ARE IN METER. DRG.NO :
CONSTRUCTION OF CLASSROOM & STAFF ROOM 2) ALL DIMENTIONS ARE FROM UNFINISHED SURFACES. SCALE : N.T.S.
ON FIRST FLOOR OF IABMI AT A.A.U., ANAND. 3) INCASE OF ANY AMBIGUITY OR ERROR IT SHALL BE CHECKED
BY THE ARCHITECT BEFORE EXECUTION ON SITE.
4) THIS DESIGN & DRAWING IS PROPERTY OF TECTONICS DWG. BY. : MISTRY BHAVIK
ELECTRIC LAYOUT PLAN AT GROUND FLOOR ARCHITECTURAL CONSULTANTS NAVSARI. CHECKED BY : ER.RAKESH VADGAMA
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
1.17m WIDE PASSAGE
FAN POINT 1.690 E.FAN
1.5 TONE SPLIT W.C.
A.C. A.C. POINT 1.20X1.50
5 P.P. POINT 1.00X 1.00X
TUBELIGHT (2.55 mt.HT.)
16 AMP PLUG (0.975 MT.HT.)
20 W DOWN LIGHT POINT
WALL POINT (2.10 mt.HT.)
6 AMP PLUG (0.975 MT.HT.)
SB2 SB2 CEILING LIGHT POINT(2'X2') SB2 SB2
WALL FAN (HT.2.10 MT.)
SB2 STAFF ROOM 1 SB2 SB2 SB2
2.50m WIDE PASSAGE
2.50m WIDE PASSAGE
2.123 EXHAUST FAN
60 WATT LED STREET LIGHT
DISTRIBUTION BOARD
PLUG FOR A.C. 2.308 PLUG FOR A.C.
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
CLASS ROOM 1 5 CLASS ROOM
OR T.) 60 STUDENTS 60 STUDENTS G
PLU 5 MT. (3 SEATED BENCH) 07 3 (3 SEATED BENCH)
JUNIOR ENGINEER, A.A.U. DEPUTY ENGINEER, A.A.U. EXECUTIVE ENGINEER, A.A.U.
CONSTRUCTION OF CLASSROOM & STAFF ROOM 1) ALL DIMENTIONS ARE IN METER. DRG.NO :
2) ALL DIMENTIONS ARE FROM UNFINISHED SURFACES. SCALE : N.T.S.
ON FIRST FLOOR OF IABMI AT A.A.U., ANAND. 3) INCASE OF ANY AMBIGUITY OR ERROR IT SHALL BE CHECKED DATE : 15/06/2026
BY THE ARCHITECT BEFORE EXECUTION ON SITE.
DWG. BY. : MISTRY BHAVIK
4) THIS DESIGN & DRAWING IS PROPERTY OF TECTONICS
ELECTRIC LAYOUT PLAN AT FIRST FLOOR ARCHITECTURAL CONSULTANTS NAVSARI. CHECKED BY : ER.RAKESH VADGAMA
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
TUBELIGHT(2.75 mt.HT.)
20 W DOWN LIGHT POINT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
JUNIOR ENGINEER, A.A.U. DEPUTY ENGINEER, A.A.U. EXECUTIVE ENGINEER, A.A.U.
1) ALL DIMENTIONS ARE IN METER. DRG.NO :
CONSTRUCTION OF CLASSROOM & STAFF ROOM 2) ALL DIMENTIONS ARE FROM UNFINISHED SURFACES. SCALE : N.T.S.
ON FIRST FLOOR OF IABMI AT A.A.U., ANAND. 3) INCASE OF ANY AMBIGUITY OR ERROR IT SHALL BE CHECKED
BY THE ARCHITECT BEFORE EXECUTION ON SITE.
4) THIS DESIGN & DRAWING IS PROPERTY OF TECTONICS DWG. BY. : MISTRY BHAVIK
ELECTRIC LAYOUT PLAN AT STAIR CABIN ARCHITECTURAL CONSULTANTS NAVSARI. CHECKED BY : ER.RAKESH VADGAMA
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
NIVIDIA-4 online - 2026-27.pdf
102-SBD-IABMI Anand.pdf
Tender Document-IAMBI.pdf
Tender Document-1 IAMBI.pdf
Building Specification.pdf
SPECIFICATIONS FOR ELECTRIC WORKS.pdf
Download all tender documents and submit your bid