Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹5.5 LAccepted-AOC | ₹5.5 L | l1 | Accepted-AOC l1 |
| 2 | l2₹5.5 LRejected-AOC | ₹5.5 L | l2 | Rejected-AOC l2 |
| 3 | l3₹5.8 LRejected-AOC | ₹5.8 L | l3 | Rejected-AOC l3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical not qualified |
| Sl No | Description | Qty | Unit | M/s Rakesh Kumar L3 | AJAB SINGH CONTRACTOR AND SUPPLIERS L1 | NITISH AGARWAL L2 |
|---|---|---|---|---|---|---|
| 0.00Laying and Jointing PVC Pipe. Heading | ||||||
| 1.00 | Earth work in Foundation in dry soil including lift up to 1.50M and lead up to 30m and including back filling watering and ramming of excavaled earth in to the plinth with removal and disposal of surplus earth as directed by Engineer in charge | 41.55 | Cum | 70 ₹2,908.50 | 74 ₹3,074.70 | 75 ₹3,116.25 |
| 2.00 | Providing and Laying Cement concrete 1:3:6 (cement,coarse sand and crushed aggregate) i/c cost of all material, labour, mechanical mixing etc. required for proper completion of work | 15.28 | Cum | 5,100 ₹77,928 | 5,236 ₹80,006.08 | 5,235 ₹79,990.80 |
| 3.00 | Ist class Brick work in 1:4 Cement, coarse sand morter including labour, T&P etc. all complete. | 51.21 | Cum | 5,100 ₹2.6 L | 5,205 ₹2.7 L | 5,200 ₹2.7 L |
| 4.00 | Stuck pointing with cement morter consisting of 1 part cement and 2 part of fine sand including supply of all materials, labour and completion of work. | 186.21 | sqm | 105 ₹19,552.05 | 110 ₹20,483.10 | 115 ₹21,414.15 |
| 5.00 | Finishing wall with Two coat of water proof cement paint weather coat of approved quality on previously new surface with the paint to give an even shade including supply of all materials, labour, T&P etc required for proper completion of the work. | 129.73 | sqm | 135 ₹17,513.55 | 139 ₹18,032.47 | 140 ₹18,162.20 |
| 6.00 | Centering and Shuttering for R. C.C Work including cost of all materials, Labour T&P etc complete. | 30.6 | sqm | 500 ₹15,300 | 550 ₹16,830 | 560 ₹17,136 |
| 7.00 | Providing and fixing steel reinforcement including cost of steel, binding wire, bending, binding, cutting placing in proper position, all labour and T&P etc for proper completion of work | 0.55 | MT | 88,000 ₹48,048 | 9,000 ₹4,914 | 9,100 ₹4,968.60 |
| 8.00 | Providing and Laying Cement concrete 1:1.5:3 (M-15 Grade) in (cement, coarse sand and crushed aggregate) i/c cost of all material, labour, mechanical mixing & vibration T&P etc. required for proper completion of work | 3.06 | cum | 6,200 ₹18,972 | 6,300 ₹19,278 | 6,400 ₹19,584 |
| 9.00 | Earth work in filling or in embankment in ordinary soil for bank strenghting to be in 20cm layers including ramming and dressing the surface to the required levels and slop also i/c 1.50 m lift and lead up to 600 m including cost of earth all labour, T&P, Loading unloading etc for completion of work as directed by Engineer - incharge. | 610 | cum | 197 ₹1.2 L | 201 ₹1.2 L | 200 ₹1.2 L |
Tender Value
₹6 L
EMD Value
₹12,000
Closing Date
22 Dec 2025, 12:00 pmClosed
EXECUTIVE ENGINEER
RCD RAMPUR
lot no 02
2025_UPIDC_1099612_2
04/EE/2025-26
Open Tender
Civil Works
25 days
rampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
₹12,000
22 Jan 2026
17 Dec 2025
22 Dec 2025
17 Dec 2025
22 Dec 2025
17 Dec 2025
Amount
Laying and Jointing PVC Pipe. Heading
Earth work in Foundation in dry soil including lift up to 1.50M and lead up to 30m and including back filling watering and ramming of excavaled earth in to the plinth with removal and disposal of surplus earth as directed by Engineer in charge
Providing and Laying Cement concrete 1:3:6 (cement,coarse sand and crushed aggregate) i/c cost of all material, labour, mechanical mixing etc. required for proper completion of work
Ist class Brick work in 1:4 Cement, coarse sand morter including labour, T&P etc. all complete.
Stuck pointing with cement morter consisting of 1 part cement and 2 part of fine sand including supply of all materials, labour and completion of work.
Finishing wall with Two coat of water proof cement paint weather coat of approved quality on previously new surface with the paint to give an even shade including supply of all materials, labour, T&P etc required for proper completion of the work.
Centering and Shuttering for R. C.C Work including cost of all materials, Labour T&P etc complete.
Providing and fixing steel reinforcement including cost of steel, binding wire, bending, binding, cutting placing in proper position, all labour and T&P etc for proper completion of work
Providing and Laying Cement concrete 1:1.5:3 (M-15 Grade) in (cement, coarse sand and crushed aggregate) i/c cost of all material, labour, mechanical mixing & vibration T&P etc. required for proper completion of work
Earth work in filling or in embankment in ordinary soil for bank strenghting to be in 20cm layers including ramming and dressing the surface to the required levels and slop also i/c 1.50 m lift and lead up to 600 m including cost of earth all labour, T&P, Loading unloading etc for completion of work as directed by Engineer - incharge.
NITISH AGARWAL (BID ID -5768833)
M/s Rakesh Kumar (BID ID -5768932)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
BOQ_2025658.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid