Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.6 LAdmitted-Finance VILL DAKSHIN HAZIPUR P O DIAMOND HARBOUR DIST SOUTH 24 PGS PIN 743331 | DIAMOND HARBOUR | SOUTH 24 PARGANAS | WEST BENGAL | 743331 | ₹10.6 L | L1 | Admitted-Finance |
| 2 | L2₹11.3 LAdmitted-Finance 140 1 110 N S C BOSE ROAD REGENT PARK KOLKATA WEST BENGAL 700040 | KOLKATA | KOLKATA | WEST BENGAL | 700040 | ₹11.3 L | L2 | Admitted-Finance |
| 3 | L3₹11.5 LAdmitted-Finance | ₹11.5 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SANKAR CONSTRUCTION L1 | S S ENTERPRISE L2 | R .D ENTERPRISES L3 |
|---|---|---|---|---|---|---|
| 1.00 | Engagement of three (03) number skilled workers having ability of fault- finding, minor repairing of electro-mechanical system, water circuit and slurry discharge arrangements for operation of Air Pollution Control Device in three shifts (including damper & I.D fan operation)
(As per Mpl. Secretary's Circular No. 06 of 2025-26 dt. 24.07.2025). | 12 | Months | 48,387 ₹5.8 L | 51,774 ₹6.2 L | 52,742 ₹6.3 L |
| 2.00 | Engagement of One (01) nos. Sweeper for sweeping the entire Furnace and APC Device area and APC Control room, Furnace Control room area. All sweeping material supplied by the contractor
(As per Mpl. Secretary's Circular No. 06 of 2025-26 dt. 24.07.2025). | 12 | Months | 12,902 ₹1.5 L | 13,805 ₹1.7 L | 14,063 ₹1.7 L |
| 3.00 | Proportionate Casual Leave imposed as per Mpl. Secretary's Circular No.23 of 2012-13 dt.10.12.2012 vide the MIC Item No.M 39.7 dt.14.08.2012. adding the total wages amount 4.53%. [4.53% of Total wages (3 No's Skilled worker and Sweeper) ] | 0.05 | Percentage | 7,35,468 ₹33,316.70 | 7,86,948 ₹35,648.74 | 8,01,660 ₹36,315.20 |
| 4.00 | Engagement of a Reliever for operators (Skilled category) in the weekly off-Days(As per Mpl. Secretary's Circular No. 06 of 2025-26 dt. 24.07.2025). Total nos. of off-days for an operator in a year = 52 nos.
Total off -days for three (03) nos. operators = (52 X 3) nos. = 156 nos.
Total working days for Relieve throughout year =156 Days | 156 | Days | 614 ₹95,784 | 657 ₹1.0 L | 669 ₹1.0 L |
| 5.00 | Engagement of a Reliever for the Sweeper in the weekly off-Days
(As per Mpl. Secretary's Circular No. 06 of 2025-26 dt. 24.07.2025).
Total nos. of off-days for an One Sweeper in a year = 52 nos.
Total working days for Reliever throughout year = (52 X 1) nos. = 52 nos. | 52 | Days | 508 ₹26,416 | 544 ₹28,288 | 554 ₹28,808 |
| 6.00 | Labour charges for cleaning the inside of Duct Passage by opening inspection cover with Vacuum Cleaner and manually. | 12 | Months | 4,700 ₹56,400 | 5,029 ₹60,348 | 5,123 ₹61,476 |
| 7.00 | Labour charges for cleaning and checking the major parts by opening the charging trolley. | 12 | Months | 4,000 ₹48,000 | 4,280 ₹51,360 | 4,360 ₹52,320 |
| 8.00 | Labour charges for cleaning the Chain Sprocket by opening back portion of the front door and adjusting the counter balancing weight to make free movement of the door. | 12 | Months | 5,200 ₹62,400 | 5,564 ₹66,768 | 5,668 ₹68,016 |
Tender Value
Refer Docs
EMD Value
₹21,100
Closing Date
14 Feb 2026, 5:00 pmClosed
DG (E)
Office of the D.G. (E) LIGHTING DEPARTMENT Kolkata Municipal Corporation 5, SN Banerjee Road Kolkata-700 013 West Bengal
Annual Operation and Maintenance of Electric Cremation Furnaces at Birjunallah Burning Ghat
2026_KMC_995961_1
KMC/LTG/OM/14/BBG/FUR/25-26
Open Tender
Miscellaneous Services
365 days
Birjunallah Burning Ghat
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹21,100
25 May 2026
30 Jan 2026
16 Feb 2026
30 Jan 2026
14 Feb 2026
30 Jan 2026
Engagement of three (03) number skilled workers having ability of fault- finding, minor repairing of electro-mechanical system, water circuit and slurry discharge arrangements for operation of Air Pollution Control Device in three shifts (including damper & I.D fan operation) (As per Mpl. Secretary's Circular No. 06 of 2025-26 dt. 24.07.2025).
Engagement of One (01) nos. Sweeper for sweeping the entire Furnace and APC Device area and APC Control room, Furnace Control room area. All sweeping material supplied by the contractor (As per Mpl. Secretary's Circular No. 06 of 2025-26 dt. 24.07.2025).
Proportionate Casual Leave imposed as per Mpl. Secretary's Circular No.23 of 2012-13 dt.10.12.2012 vide the MIC Item No.M 39.7 dt.14.08.2012. adding the total wages amount 4.53%. [4.53% of Total wages (3 No's Skilled worker and Sweeper) ]
Engagement of a Reliever for operators (Skilled category) in the weekly off-Days(As per Mpl. Secretary's Circular No. 06 of 2025-26 dt. 24.07.2025). Total nos. of off-days for an operator in a year = 52 nos. Total off -days for three (03) nos. operators = (52 X 3) nos. = 156 nos. Total working days for Relieve throughout year =156 Days
Engagement of a Reliever for the Sweeper in the weekly off-Days (As per Mpl. Secretary's Circular No. 06 of 2025-26 dt. 24.07.2025). Total nos. of off-days for an One Sweeper in a year = 52 nos. Total working days for Reliever throughout year = (52 X 1) nos. = 52 nos.
Labour charges for cleaning the inside of Duct Passage by opening inspection cover with Vacuum Cleaner and manually.
Labour charges for cleaning and checking the major parts by opening the charging trolley.
Labour charges for cleaning the Chain Sprocket by opening back portion of the front door and adjusting the counter balancing weight to make free movement of the door.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.44 MB
BOQ_2437335.xls
BOQ • 0.31 MB
form1.pdf
Tender Documents • 0.76 MB
Download all tender documents and submit your bid