| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.0 LAccepted-AOC H NO 18 272 SHIRWAI QUEPEM GOA | QUEPEM | SOUTH GOA | GOA | L1 | Accepted-AOC WORK AWARDED | |
| 2 | L2₹16.8 L+₹73,307.17 (4.57%)Rejected-Finance R O COPRIMODDI ASSOLDA CHANDOR SOUTH GOA | L2 | Rejected-Finance L2 |
Tender Value
₹17.8 L
EMD Value
₹35,535
Closing Date
10 Mar 2025, 4:00 pmClosed
EE XII WRD Gogal
Executive Engineer WD XII WRD Gogal
Construction of side protection wall in Survey No. 129/2 and 129/2B at Sonfatar, Xeldem village of Quepem Taluka.
2025_WRD_20171_1
WDXII/TECH/F10/20e/2024-25/sr3
Open Tender
Civil Works
Item Rate
60 days
Xeldem Quepem
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹35,535
23 Apr 2025
18 Feb 2025
12 Mar 2025
18 Feb 2025
10 Mar 2025
18 Feb 2025
Amount
Earthwork in excavation by mechanical/manual means in all type of strata comprising any of the materials such as soil, silt, sand, clay, gravel, moorum of all varieties, shingles, pebbles all types of conglomerates, laterite rock, soft rock,ordinary rock, disintegrated rock or weathered rock, fissured/shattered, decomposed rock and all such material either in full or in parts, as the case may be adopting any approved method or methods as may be convenient or permitted inclusive of chiseling, wedging etc. but blasting prohibited in all conditions such as dry, moist, saturated, submerged, foul conditions etc including pumping or bailing out water/dewatering including setting out construction of shoring, stritting and bracing, removal of stump and other deleterious matter, dresing of sides and bottom, providng barricading, danger lightining, guarding etc and backfilling the excavated earth to the extent required and disposing of surplus excavated soil/rock at specified areas with all leads and all lifts etc complete as per specification and drawing and as directed by the Engineer-in-charge complete.
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Centering and shuttering including struttings, propping etc. and removal of formwork for :a) Foundations, footings, bases for columns and mass concrete.
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All works upto plinth level.
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer in charge. a) 110mm dia
Supplying and filling in plinth under floors, trenches including watering ramming consolidating, dressing, complete. b) Moorum
HAABEL CONSTRUCTION (BID ID -44990)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .