| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance NO 2 98 TRICHY MAIN ROAD PIDAGAM POST VILLPURAM TALUK 605401 | PIDAGAM | VILLUPURAM | TAMIL NADU | 605401 | ₹1.5 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | K DHINAKARAN L1 |
|---|---|---|---|---|
| 1.00Civil works | ||||
| 1.01 | Setting of pilling and boring equipement, tripod with all accessories and tools at each pile location based on the sequence of operation approved by the Engineer incharge at site irrespective of the location and distance of the boring rig for 600 mm dia pile including mobilisation and demobilisation after comletion of pilling works etc., complete. | 22 | Nos. | 16,000 ₹3,52,000 Lowest |
| 2.00 | Supplying, fabrication of 6mm M.S. sheet for making into circular casing shape to the required dia including welding, placing in position and driving into bore hole including cost of all materilas and MS plate, all labour charges etc., complete. 600 mm dia Pile | 48.7 | MT | 10,000 ₹4,87,000 Lowest |
| 3.00 | Earthwork excavation in In hard stiff clay, black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil . | 228 | cum | 220 ₹50,160 Lowest |
| 4.00 | Boring and concreting of vertical reinforced concrete pile of 600 mm dia. upto required depth from tip of the in all clauses of soil using pile augurs for boring using Bentonite slurry and filling the bore with RCC M30 concrete using 20 mm machine crushed metal and a maximum water cement ratio not exceeding 0.50 with admixtures of CONCARE or equivalant make 1.2 lit. per cum. of concrete, as per specification including cost of all materials, labour, lead, lift etc., complete (But excluding cost of steel reinforcement). | 550 | RM | 13,000 ₹71,50,000 Lowest |
| 5.00 | Chipping and dismantling of pile concrete from bed level to cutoff level of pile to met sound concrete and clearing the dismantled concrete from pile location including cost of all labour charges etc., complete. | 12 | CUM | 4,000 ₹48,000 Lowest |
| 6.00 | PCC 1:3:6 using 20 mm HBG metal for base course for Pile cap and tie beam including cost and conveyance of all materials, labour, lead, lift etc., complete. | 16 | Cum | 8,000 ₹1,28,000 Lowest |
| 7.00 | RCC M30 using 12 to 20 mm HBG metal for pile cap and for Tie beam with steel shuttering and steel form work as per drawing including cost and conveyance of all materials, labour, lead, lft etc., complete but excluding cost of steel reinforcement. | 163 | Cum | 10,000 ₹16,30,000 Lowest |
| 8.00 | Supplying & Providing MS/RTS steel reinforcement including cost of steel rodreinforcement , binding wire including cost of all materials,labour, lead and lift etc., complete. | 67,500 | Kg | 45 ₹30,37,500 Lowest |
| 9.00 | SGST & CGST (If applicable quote the value, if not enter '0') | 1 | percentage | 9 ₹11,59,439.4 Lowest |
Tender Value
Refer Docs
EMD Value
₹2.0 L
Closing Date
17 Apr 2025, 2:00 pmClosed
CE/TP-II/Trichy
The Chief Engineer, Transmission Projects II, Periyamilaguparai, Near Collectorate, Trichy - 1.
Providing additional pile foundation for erection of new 110 KV DC line on DC tower in 110 KV Trichy (Grid) - Thatchankurichy feeder .
2025_EB_544073_1
CE/TP-II/TRY/C-01/2025-26
Open Tender
Civil Works
Works
60 days
Thiruvanaikoil
As per tender specification
4 documents required · 4 mandatory
₹0
₹2.0 L
Yes
23 Apr 2025
11 Apr 2025
19 Apr 2025
11 Apr 2025
17 Apr 2025
11 Apr 2025
Amount
Civil works
Setting of pilling and boring equipement, tripod with all accessories and tools at each pile location based on the sequence of operation approved by the Engineer incharge at site irrespective of the location and distance of the boring rig for 600 mm dia pile including mobilisation and demobilisation after comletion of pilling works etc., complete.
Supplying, fabrication of 6mm M.S. sheet for making into circular casing shape to the required dia including welding, placing in position and driving into bore hole including cost of all materilas and MS plate, all labour charges etc., complete. 600 mm dia Pile
Earthwork excavation in In hard stiff clay, black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil .
Boring and concreting of vertical reinforced concrete pile of 600 mm dia. upto required depth from tip of the in all clauses of soil using pile augurs for boring using Bentonite slurry and filling the bore with RCC M30 concrete using 20 mm machine crushed metal and a maximum water cement ratio not exceeding 0.50 with admixtures of CONCARE or equivalant make 1.2 lit. per cum. of concrete, as per specification including cost of all materials, labour, lead, lift etc., complete (But excluding cost of steel reinforcement).
Chipping and dismantling of pile concrete from bed level to cutoff level of pile to met sound concrete and clearing the dismantled concrete from pile location including cost of all labour charges etc., complete.
PCC 1:3:6 using 20 mm HBG metal for base course for Pile cap and tie beam including cost and conveyance of all materials, labour, lead, lift etc., complete.
RCC M30 using 12 to 20 mm HBG metal for pile cap and for Tie beam with steel shuttering and steel form work as per drawing including cost and conveyance of all materials, labour, lead, lft etc., complete but excluding cost of steel reinforcement.
Supplying & Providing MS/RTS steel reinforcement including cost of steel rodreinforcement , binding wire including cost of all materials,labour, lead and lift etc., complete.
SGST & CGST (If applicable quote the value, if not enter '0')
IGST (If applicable quote the value, if not enter '0')
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .