Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAdmitted-Finance HIMACHAL PRADESH HP | L1 | Admitted-Finance | |
| 2 | L2₹5.2 L+₹73,669.10 (16.3%)Admitted-Finance V P O DARINI TEHSIL SHAHPUR HIMACHAL PRADESH 176206 | DARINI | KANGRA | HIMACHAL PRADESH | 176206 | L2 | Admitted-Finance | |
| 3 | L3₹5.5 L+₹95,728.94 (21.2%)Admitted-Finance NOT SPECIFIED | L3 | Admitted-Finance | |
| 4 | L4₹8.4 L+₹3.9 L (86.4%)Admitted-Finance HIMACHAL PRADESH HP | LAHUL AND SPITI | HIMACHAL PRADESH | 175133 | L4 | Admitted-Finance | |
| 5 | L5₹8.4 L+₹3.9 L (86.6%)Admitted-Finance GHUMARWIN DIVISION HP PWD GHUMARWIN | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Sudershan Kumar L6 | ARVIND KUMAR L5 | PANKAJ KUMAR L1 | AKSHAY KUMAR L2 | Jitender Kumar L3 | Daljeet Singh L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by Mechanical means Hydraulic exavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50m and lift upto 1.5m, as directed by engineer-in-charge Soft rock | 21.69 | cum. | 500 ₹10,845 | 490 ₹10,628.1 | 220 ₹4,771.8 | 160 ₹3,470.4 Lowest | 280 ₹6,073.2 | 350 ₹7,591.5 |
| 2.01 | Extra rates for quantities of works, executed in or under water and/or liquid mud, including pumping out water as required. 20% upto….. | 8.88 | cum. | 550 ₹4,884 | 551 ₹4,892.88 | 220 ₹1,953.6 | 160 ₹1,420.8 Lowest | 400 ₹3,552 | 580 ₹5,150.4 |
| 3.01 | Providing and laying cement concrete 1:4:8 (1 cement: 4 sand: 8graded stone aggregate 40mm nominal size) and curing etc. complete. In foundation & Plinth. | 3.92 | Cum. | 10,000 ₹39,200 | 10,000 ₹39,200 | 4,500 ₹17,640 | 4,000 ₹15,680 Lowest | 6,700 ₹26,264 | 5,900 ₹23,128 |
| 4.01 | Centering and shuttering including strutting, propping etc. and removal of same form work for wall, R/wall returns/wall of any fillets steps etc. | 138.54 | Sqm. | 700 ₹96,978 | 699 ₹96,839.46 | 200 ₹27,708 Lowest | 250 ₹34,635 | 340 ₹47,103.6 | 2,200 ₹3,04,788 |
| 5.01 | Providing and laying cement concrete 1:3:6 ( 1 cement: 3 sand: 6 graded stone aggregate 20mm nominal size) and curing complete upto plinth level | 9.9 | cum. | 12,000 ₹1,18,800 | 12,000 ₹1,18,800 | 5,200 ₹51,480 | 5,000 ₹49,500 Lowest | 6,900 ₹68,310 | 6,800 ₹67,320 |
| 6.01 | above plinth level | 23.02 | cum. | 5,000 ₹1,15,100 | 5,000 ₹1,15,100 | 4,500 ₹1,03,590 Lowest | 5,000 ₹1,15,100 | 7,100 ₹1,63,442 | 6,900 ₹1,58,838 |
| 7.01 | Providing and laying cement concrete 1:1.5:3 (1 cement 1.5 sand : 3 graded stone aggregate 20 mm nominal size) walls (any thickness) including attached pilastes, columns, piers, abutments, pollars, posts, struts, buttresses, string or lacing courses, parapets, copinged blocks, anchor blcks, plain window sills, fillets, sunken floor etc.m up to floor five level, excluding the cost of centerting , shuttering and finishing | 10.55 | cum. | 15,000 ₹1,58,250 | 15,000 ₹1,58,250 | 6,000 ₹63,300 | 5,400 ₹56,970 Lowest | 8,300 ₹87,565 | 8,100 ₹85,455 |
| 8.01 | Providing mild/ for steel reinforcurment tor reinforced cement concrete work i/c bending, binding and placing in position complete i/c the cost of binding wire etc. | 949.5 | kgs | 150 ₹1,42,425 | 150 ₹1,42,425 | 85 ₹80,707.5 | 80 ₹75,960 Lowest | 84 ₹79,758 | 94 ₹89,253 |
| 9.01 | Smooth finishing of the exposed surface of RCC work with 6 mm thick cement mortar 1:3 (1cement:3 fine sand) | 91.23 | Sqm. | 150 ₹13,684.5 | 151 ₹13,775.73 | 120 ₹10,947.6 Lowest | 200 ₹18,246 | 290 ₹26,456.7 | 300 ₹27,369 |
| 10.01 | White washing with lime to give an even shade | 91.23 | Sqm. | 50 ₹4,561.5 | 49 ₹4,470.27 | 30 ₹2,736.9 | 10 ₹912.3 | 8 ₹729.84 Lowest | 16 ₹1,459.68 |
Tender Value
₹8.4 L
EMD Value
₹15,000
Closing Date
28 Oct 2025, 5:00 pmClosed
DISTT. PROJECT OFFICER, IDP, BILASPUR
DISTT. PROJECT OFFICER, IDP, BILASPUR
PR 324/2025-26 Construction of Makowal at place Durghat nalla vill Jejwin(near land of Sh. Rakesh Dhiman in GP Jejwin APO Berthin
2025_CPD1_117975_1
516550-CW-RFQ
Open Tender
Civil Works
Item Rate
45 days
DISTT. PROJECT OFFICER, IDP
Total Monetaryvalue and list of works of last three years, financial statement, Certificate of movable and fixed assets valuation, Copy of PAN, Bank Account Copy of GST,GST Clearance Copy of
7 documents required · 7 mandatory
₹500
DISTT. PROJECT OFFICER, IDP, BILASPUR
₹15,000
29 Oct 2025
16 Oct 2025
29 Oct 2025
16 Oct 2025
28 Oct 2025
16 Oct 2025
16 Oct 2025 - 28 Oct 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
Tendernotice_2.pdf
PDF • 0.85 MB
Tendernotice_3.pdf
PDF • 0.66 MB
Tendernotice_4.pdf
PDF • 0.25 MB
BOQ_172537.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .