Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.2 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹51.9 L+₹3.1 L (6.26%)Rejected-AOC | L2 | Rejected-AOC Being L2 | |
| 3 | L3₹52.3 L+₹3.5 L (7.17%)Rejected-AOC | L3 | Rejected-AOC Being L3 | |
| 4 | L4₹52.7 L+₹3.9 L (7.97%)Rejected-AOC | L4 | Rejected-AOC Being L4 | |
| 5 | L5₹53.1 L+₹4.3 L (8.82%)Rejected-AOC | L5 | Rejected-AOC Being L5 |
| Sl No | Description | Qty | Unit | M/S TAPAN KUMAR RAY L3 | Anup Kumar Paul Choudhury L7 | M/S RAJU ENTERPRISES AND BROS L8 | M/S M P Sharma L5 | m/s builders and suppliers L4 | LUIT CONSTRUCTION L6 | M/S MOLOY KUMAR DEY L2 | SHRI YOUNUS KHAN L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00E & M Division Items | |||||||||||
| 2.00 | Taking up and down CI/DI size of 300 mm bore including all fittings with spigot and socket ends and DI fitting i.e bend,tees,socket,mechanical joint etc. and connections, complete all as specified and directed. | 16.5 | RM | 202 ₹3,333 | 222 ₹3,663 | 202 ₹3,333 | 202 ₹3,333 | 202 ₹3,333 | 202 ₹3,333 | 210 ₹3,465 | 200 ₹3,300 Lowest |
| 3.00 | Taking down of DI pipe line 250 mm bore including all fittings with spigot and socket ends and DI fitting i.e bend,tees,socket,mechanical joint etc. complete all as specified as directed.
Note : Earth work,Pipe and fitting shall be measured and paid separately under respective item. | 22 | RM | 185 ₹4,070 | 232 ₹5,104 | 232 ₹5,104 | 220 ₹4,840 | 192 ₹4,224 | 222 ₹4,884 | 185 ₹4,070 | 180 ₹3,960 Lowest |
| 4.00 | Taking down of DI pipe line 200 mm bore including all fittings with spigot and socket ends and DI fitting i.e bend,tees,socket,mechanical joint etc. complete all as specified as directed.
Note : Earth work,Pipe and fitting shall be measured and paid separately under respective item. | 28 | RM | 144 ₹4,032 | 144 ₹4,032 | 144 ₹4,032 | 144 ₹4,032 | 144 ₹4,032 | 144 ₹4,032 | 144 ₹4,032 | 140 ₹3,920 Lowest |
| 5.00 | Taking up and down steel tubing/ DI Pipe/ CI pipe 150 mm bore wtih fittings from connections complete all as specified and directed. | 380 | RM | 122 ₹46,360 | 122 ₹46,360 | 111 ₹42,180 Lowest | 122 ₹46,360 | 122 ₹46,360 | 122 ₹46,360 | 122 ₹46,360 | 120 ₹45,600 |
| 6.00 | Taking up and down steel tubing/ DI Pipe/ CI Pipe 100 mm bore wtih fittings from connections complete all as specified and directed. | 260 | RM | 120 ₹31,200 | 111 ₹28,860 | 111 ₹28,860 | 110 ₹28,600 | 122 ₹31,720 | 111 ₹28,860 | 110 ₹28,600 | 100 ₹26,000 Lowest |
| 7.00 | Taking up and down steel tubing/ DI pipe/ CI pipe 80 mm bore wtih fittings from connections complete all as specified and directed. | 210 | RM | 72 ₹15,120 | 77 ₹16,170 | 77 ₹16,170 | 72 ₹15,120 | 72 ₹15,120 | 72 ₹15,120 | 72 ₹15,120 | 70 ₹14,700 Lowest |
| 8.00 | Taking up and down steel tubing 50 mm bore wtih fittings from connections complete all as specified and directed. | 250 | RM | 44 ₹11,000 Lowest | 49 ₹12,250 | 49 ₹12,250 | 47 ₹11,750 | 47 ₹11,750 | 47 ₹11,750 | 44 ₹11,000 Lowest | 45 ₹11,250 |
| 9.00 | Taking up and down steel tubing 40 mm bore wtih fittings from connections complete all as specified and directed. | 50 | RM | 33 ₹1,650 | 22 ₹1,100 | 20 ₹1,000 Lowest | 25 ₹1,250 | 33 ₹1,650 | 22 ₹1,100 | 32 ₹1,600 | 30 ₹1,500 |
| 10.00 | Taking up and down steel tubing 25 mm bore wtih fittings from connections complete all as specified and directed. | 320 | RM | 25 ₹8,000 | 25 ₹8,000 | 22 ₹7,040 Lowest | 25 ₹8,000 | 25 ₹8,000 | 25 ₹8,000 | 25 ₹8,000 | 25 ₹8,000 |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
26 May 2026, 6:00 pmClosed
GE SILCHAR
Office of the GE Silchar Masimpur Cantt
REPAIR MAINTENANCE OF EXTERNAL WATER SUPPLY PIPE LINE NETWORK WITH CONNECTED ACCESSORIES AND MISC WORKS AT MASIMPUR AND KUMBHIGRAM (PH-I) UNDER MASIMPUR MILITARY STATION
2026_MES_763259_1
8139A/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
Masimpur
Class D Category a ii and other criteria as per NIT and Tender Doc
8 documents required · 8 mandatory
₹500
GE Silchar
₹90,000
Yes
18 Jul 2026
4 May 2026
29 May 2026
4 May 2026
26 May 2026
19 May 2026
4 May 2026 - 14 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E & M Division Items | - | - | - | - |
| 2 | Taking up and down CI/DI size of 300 mm bore including all fittings with spigot and socket ends and DI fitting i.e bend,tees,socket,mechanical joint etc. and connections, complete all as specified and directed. | 16.5 | RM | - | - |
| 3 | Taking down of DI pipe line 250 mm bore including all fittings with spigot and socket ends and DI fitting i.e bend,tees,socket,mechanical joint etc. complete all as specified as directed.
Note : Earth work,Pipe and fitting shall be measured and paid separately under respective item. | 22 | RM | - | - |
| 4 | Taking down of DI pipe line 200 mm bore including all fittings with spigot and socket ends and DI fitting i.e bend,tees,socket,mechanical joint etc. complete all as specified as directed.
Note : Earth work,Pipe and fitting shall be measured and paid separately under respective item. | 28 | RM | - | - |
| 5 | Taking up and down steel tubing/ DI Pipe/ CI pipe 150 mm bore wtih fittings from connections complete all as specified and directed. | 380 | RM | - | - |
| 6 | Taking up and down steel tubing/ DI Pipe/ CI Pipe 100 mm bore wtih fittings from connections complete all as specified and directed. | 260 | RM | - | - |
| 7 | Taking up and down steel tubing/ DI pipe/ CI pipe 80 mm bore wtih fittings from connections complete all as specified and directed. | 210 | RM | - | - |
| 8 | Taking up and down steel tubing 50 mm bore wtih fittings from connections complete all as specified and directed. | 250 | RM | - | - |
| 9 | Taking up and down steel tubing 40 mm bore wtih fittings from connections complete all as specified and directed. | 50 | RM | - | - |
| 10 | Taking up and down steel tubing 25 mm bore wtih fittings from connections complete all as specified and directed. | 320 | RM | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
8139A-SchOfCreditformat.pdf
Additional Documents • 0.03 MB
BOQ_854946.xls
BOQ • 0.39 MB
8139A-TP.pdf
Tender Documents • 0.43 MB
8139A-Amndt.pdf
PDF • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .