| 1 | L1₹3.8 LAccepted-AOC | L1 | Accepted-AOC Accepted wide Resolution No1(1) dtd 20.03.2025 of Azhoor Gp | |
| 2 | L2₹3.8 L+₹8,244.93 (2.20%)Rejected-AOC | L2 | Rejected-AOC Higher rate, Hence rejected |
Tender Value
₹4.2 L
EMD Value
₹10,585
Closing Date
4 Jan 2025, 3:00 pmClosed
DEEPA D T
Assistant Engineer, LIDEW Section ,Azhoor Grama Panchayat
Annual Plan-AZHOOR G.P. 2024-25, PROJECT NO.88/25-RENOVATION OF THEKKEKONAM PUBLIC POND AND PROTECTION WALL CONSTRUCTION IN WARD NO.09
2024_LSGD_718989_1
5-TEN/AE/LIDEW/AZR/2024-25
Open Tender
Civil Works - Water Works
Item Rate
180 days
AZHOOR G P
Please refer Tender documents.
7 documents required · 7 mandatory
₹935
Yes
₹10,585
Yes
9 Jun 2025
26 Dec 2024
6 Jan 2025
26 Dec 2024
4 Jan 2025
26 Dec 2024
Amount
Renovation of public pond and protection wall construction.
OD314686/2024-2025:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
SURESH BABU S (BID ID -2047395)
Bidder Name
prajodhanan
SURESH BABU S
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .