Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
30 Nov 2026, 6:00 pm6d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
The Chief Officer, Dahod Nagarpalika, Dahod
BID DOCUMENTS FOR YEARLY CLEANING AND BEAUTIFICATION WORK AT DAHOD NAGARPALIKA UNDER SWACHH BHARAT MISSION SWACCH SAHER SUNDAR SAHER YOJANA.
364336
SWACCH SAHER SUNDAR SAHER YOJANA.
Open
Civil - All
Works
Dahod
15 documents required · 15 mandatory
₹4,248
The Chief Officer, Dahod Municipality, Dahod
₹1.2 L
7 Nov 2026
7 Nov 2026
7 Nov 2026
30 Nov 2026
7 Nov 2026
120 days
Total Amount Rs.
Note : 4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-
10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where
there is a change as per actual mix design the cost of difference of cement consumption have been deducted
from the rate of original item at the rate of input rate mentioned in all the tender.
Signature of Contractor Chief Officer
Dahod Nagarpalika
SECTION-7 BILL OF QUANTITIES-172
DAHOD MUNICIPALITY, DAHOD
Name of Work :- Estimate for Annual Rate Contract for Sweeping & Cleaning of Main Roads, Internal
Roads and Approach Roads by Manpower and Machineries in Dahod Town Area. (For 365 Days)
Qty. Description Total Rate Unit Amount
1 Road Sweeping and Cleaning of Main Roads, Internal
Roads and Approach Roads of Dahod Town Area using
Latest Road Sweeping Equipments, Man Power,
Machinery etc. including Transportation of Collected
Waste with required Manpower, Machineries and
Vehicles to Solid Waste Disposal Site in the best
Satisfactory Manner and also Submitting Cleaning
Report Periodically on Monthly Basis (Note : Rate Should
be Quote on Dailly Basis for Manually Cleaning Job
Considering the Total Road to be Cleaned at least Once
a Day or Night using Manpower and Machinery in
Residential Area and Once in a Day and Once in a Night
using Manpower and Machinery in Commercial Area and
1.1 10585.00 Day To Day Road Sweeping, Road Cleaning Road
Labours Brushing, Divider Cleaning Dumping of garbage Per
Nuisance Points Cleaning, Spraying of pesticides on site Labour
with all Lift & Lead use of tractor in Whole work for Per
Various Area on site with all lift & Lead. (Each Road to Day
be cleaned Daily)
1.2 1095.00 Hiring of Tractor with Trailer Considering 6 HRS as
Tractors Working day including Driver, Helper, Fuel, Repair & Per
Maintenance of Tractor rate also including carting, Tractor
loading, unloading with all lead and lift. (6 Hours per Day Per
Rs. 207.63 tractor+ 245 trolley= 452.63 per Hour) (6 x Day
452.63 = 2715.78) (Each Road to be cleaned Daily)
Toal Amount For Road Sweeping & Cleaning Works For 365 Days, Rs.
SBD SECTION-7 BILL OF QUANTITIES-173
DAHOD MUNICIPALITY, DAHOD
NAME OF WORK :- ESTIMATE FOR WALL BEAUTIFICATION AND DECORATIVE PAINTING WORK AT OUTSIDE
GYM AREA AT DAHOD
Qauntity Item Discription Total Rate Unit Amount
1 300.00 Removing dry or oil bound distemper by a washing and scraping
Smt. and sand papering the wall surface smooth including necessary
repairs to scratches complete.
2 90.00 Removing and scraping of old deteriorated plaster of any
Smt. thickness fromm wall / R.C.C member including stacking of
serviceable material and disposal of unserviceable from site of
work with all lead and lift. 20.36 Smt.
3 90.00 Providing 15mm thick cement plaster in single coat on Rough
Smt. (Similar)side of single or half brick walls for interior plastering
upto floor two level and finished even and smooth in (i) Cement
mortar 1:3 (1-cement:3-sand) Extra over items 58 to 64 for
finishing with a floating coat of neat cement slurry.
4 300.00 Finishing wall with Artistic 3D/Realistic/Semi realistic/Graffiti
Smt. /Traditional/ 2D/Multicolor art work with aesthetic sense done by
experience artists team with weatherproof exterior emulsion
paint give a required shape even shade after thoroughly brushing
the surface to remove all dirt, remains of loose powdered
materials etc. up to 3 metre wall height the rate
Add :- 18% of GST, Rs.
Add :- 1% of Qaulity Controll Rs.
Add :- 2% of Contingency Charges Rs.
SBD SECTION-7 BILL OF QUANTITIES-174
DAHOD MUNICIPALITY, DAHOD
NAME OF WORK :- ESTIMATE FOR PROVIDING, SUPPLYING & FIXING VARIOUS TYPES OF MURALS, SCULPTURES &
STATUES AT VARIOUS LOCATIONS AT DAHOD
Qty. Description Unit Amount
1 1.00 Providing and fixing Mild Steel (MS) /FRP realistic sculpture of approved
Job. company and brand, having height ranging from 10 feet to 13 feet, as
directed by the Engineer in charge. The work shall include excavation of
foundation pits to required depth and dimensions. Concrete work for
foundation shall be carried out with proper mix design and curing. All
necessary anchor bolts, base plates, and fittings shall be provided for
stability. MS members shall be fabricated strictly as per approved shop
drawings. Contractor shall prepare detailed shop drawings based on
design for prior approval. CNC cutting of MS members of any type, size, or
shape shall be executed wherever required. Extra payment for CNC cutting
shall be considered separately as per BOQ provisions. For payment
purposes, weight in kilograms of MS elements before CNC cutting shall be
taken. Fabrication shall include welding, grinding, and finishing of joints to
achieve smooth surfaces. All erection work shall be carried out using
suitable lifting equipment and safety measures. The sculpture shall be fixed
securely on the prepared foundation with approved fittings. Surface
preparation shall include cleaning, priming, and application of protective
coatings. Final finishing shall be done with PU paint of approved shade and
brand. PU paint shall be applied in multiple coats to ensure durability and
weather resistance. All works shall be executed under the supervision and
direction of the Engineer in charge. Contractor shall ensure compliance
with safety standards during fabrication and erection. Quality control shall
be maintained at every stage of work execution. The completed sculpture
shall be aesthetically pleasing and structurally stable. Work shall be
executed in all respects as per specifications.
Add :- 18% of GST, Rs.
Add :- 1% of Qaulity Controll, Rs.
Add :- 2% of Contingency Charges, Rs.
SBD SECTION-7 BILL OF QUANTITIES-175
DAHOD MUNICIPALITY, DAHOD
NAME OF WORK :- ESTIMATE FOR PLANTATION AT OUTSIDE GYM AREA AT DAHOD
Sr. NO Item Discription Unit Amount
Clearing jungle including uprooting of rank vegetation, grass, brush wood,
trees and saplings of girth up to 30 cm measured at a height of 1 m above
ground level and removal of rubbish up to a distance of 50 m outside the
periphery of the area cleared. 300.00 Smt 18.89
2 Good garden soil
Supplying and stacking of good earth at site including royalty and carriage upto 5 km
complete (earth measured in stacks will be reduced by 20% for payment 90.00 Cmt 811.79
3 Cow dung manure
Supplying and stacking of well decayed cattle manure at site including royalty and carriage
upto 5 k.m. lead complete (cattle manure measured in stacks will reduced by 8% for
Payment) 15.00 Cmt 673.77
4 Rough dressing the trenched ground including breaking clods. 300.00 Smt 2.32
5 Fine dressing of the ground 300.00 Smt 5.66
6 Mixing earth and sludge or manure in the required proportion specified or directed by the
Officer-in-charge 105.00 Cmt 56.26
7 Spreading of sludge, dump manure and/or good earth in required thickness as per
direction of officer-in-charge (cost of sludge, dump manure and/ or good earth to be paid
separately) 105.00 Cmt 80.50
8 Tree plantation:
Digging holes in ordinary soil and refilling the same with the excavated earth mixed with
manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after
reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding
with water, dressing including removal of rubbish and surplus earth, if any, with all leads
and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately)
2.14.3 Holes 60 cm dia, and 60 cm deep 64.00 Nos 48.33
9 Preparation of beds for hedging and shrubbery by excavating 60 cm deep and trenching
the excavated base to a further depth of 30 cm, refilling the excavated earth after
breaking clods and mixing with sludge or manure in the ratio of 8:1 (8 parts of stacked
volume of earth after reduction by 20%: one part of stacked volume of sludge or manure
after reduction by 8%), flooding with water, filling with earth if necessary, watering and
finally fine dressing, leveling etc. including stacking and disposal of materials declared
unserviceable and surplus earth by spreading and leveling as directed, within a lead of
m, lift up to 1.5 m complete (cost of sludge, manure or extra earth to be paid for
separately) 13.30 Cmt 343.25
10 Plantation of Trees, at site i/c watering and removal of unserveiceable
material’s as per direction of officer in charge (excluding cost of plant &
Tree plant 63.33 Nos 9.54
Shrub plant 317.00 Nos 4.75
SBD SECTION-7 BILL OF QUANTITIES-176
11 Providing (Purchase) of various type tree Including cost of expertise,
transportation, loading, unloading, all taxes etc. complete as per specification and as
directed by Muni. Engineer-in-charge.
11.1 Azadirachta indicia (Neem) height 120-130cm in big polybag size 25 cm 5.00 Nos 72.92
11.2 Bassia latifolia (Mahua) height 90-105 cm. in big polybag size 25 cm 5.00 Nos 71.71
11.3 Bauhinia purpurea (Kachnar) height 150-165 cm. in big polybag size 25 cm 5.00 Nos 54.69
11.4 Delonix regia (Gulmohar) height 150-165 cm. in big poly bag size 25 cm 5.00 Nos 65.65
11.5 Ficus benghalensis (Banyan) height 120-135 cm. in big poly bag size 25 cm 4.00 Nos 70.50
11.6 Bottle palm ht. 150-180 cm bottom girth 20-25 cm well developed in big poly bag size
11.7 Ficus religiosa (Pepal) height 150-165 cm. in big poly bag size 30 cm 4.00 Nos 72.92
11.8 Tamarindus indica (Imli) height 120-150 cm. in big polybag size 25 cm 4.00 Nos 87.52
11.9 Terminalia arjuna height 150-165 cm. in big polybag size 25 cm 4.00 Nos 65.65
11.10 Phyllanthus emblica (Amla) height 150-165 cm. in Big HDPE Bag 4.00 Nos 98.48
11.11 Mimusops elengi (Maulsri) height 180-195 cm., well developed with thick stem in big in
big size HDPE bag 4.00 Nos 137.36
11.12 Providing and stacking of Spathodea campanulata height 150-165 cm. in poly bag size
cm as per direction of the officer-in-charge. 4.00 Nos 82.67
11.13 Providing and stacking of Cassia fistula (Amaltash) height 120-135 cm. in poly bag size
cm as per direction of the officer-in-charge. 4.00 Nos 70.50
11.14 Providing and stacking of Cassia siamea height 150-165 cm. in poly bag size 25 cm as per
direction of the officer-in-charge. 4.00 Nos 72.92
11.15 Providing and stacking of Lagerstroemia flosreginae height 150-165 cm.in poly bag size
cm as per direction of the officer-in-charge. 4.00 Nos 131.30
Providing and stacking of shrubs of height 60-90 cm. in poly bags of size 15-20 cm as per
12 direction of the officer-in-charge. (Select shrubs as per attached shrub list/specifications)
12.1 Ficus panda of height 90-105 cm. with 10-12 branches and healthy foliage, well formed in
cement pot of size 30 cm 80.00 Nos 246.79
12.2 Gardenia jasminoides of height 45-60 cm. with 3-4 branches in earthen pot of size 20 cm
12.3 Hamelia patens of height 90-105 cm. bushy in big size HDPE bag 36.00 Nos 109.43
12.4 Hibiscus rosasinensis of height 90-105 cm., bushy in big size HDPE bag 41.00 Nos 98.48
SBD SECTION-7 BILL OF QUANTITIES-177
12.5 Providing and stacking of Caesalpinia pulcherrima species of height 45-60 cm. in earthen
pot of size 20 cm as per direction of the officer-incharge. 40.00 Nos 48.63
12.6 Mussaenda erythrophylla (Rosea) of height 60-75 cm. multi branched in earthen pot of
size 25 cm 40.00 Nos 120.34
12.7 Nerium oleander (kaner) of height 60-75 cm. with 5-6 branches in poly bag of size 25 cm
Pathway Peripheri
13 Providing, stacking and Henna Plant of height 25 to 30 cm., 2 to 3 suckers in 20 c.m
Earthen Pot/Plastic Pot and as per direction of the officer-in-charge. 50.00 Nos 12.12
14 Mali For Cleaning and Gardening (After Site Complete) 365.00 Day 901.93
Add :- 18% of GST, Rs.
Add :- 1% of Qaulity Controll, Rs.
Add :- 2% of Contingency Charges, Rs.
SBD SECTION-7 BILL OF QUANTITIES-178
DAHOD MUNICIPALITY, DAHOD
NAME OF WORK :- ESTIMATE FOR SUPPLYING & FIXING VERTICAL GARDEN & OXYGEN PLATING AT
OUTSIDE GYM AREA AT DAHOD
Qauntity Item Discription Total Rate Unit Amount
1 2.00 Providing, supplying and installing Vertical Garden System
Job comprising decorative ornamental plants, oxygen-releasing
indoor/outdoor plants (minimum 100 Nos.) in suitable
pots/planters, modular vertical garden panels, growing media
(cocopeat, compost and soil conditioner), GI/MS support
framework, and complete fitting assembly. The work shall
include supply of oxygen-enhancing plants or equivalent
approved varieties, planted in suitable pots and arranged as
per area. The item shall also include complete Micro Irrigation
System exclusively for the Vertical Garden, consisting of
HDPE/LDPE pipes, drip laterals, drippers, micro tubes,
connectors, tees, elbows, end caps, valves, filters, clamps,
supports and all necessary accessories required for uniform
irrigation of the vertical garden. The work shall include
plantation, fixing, testing, commissioning and maintenance
during establishment period, complete with all materials,
labour, tools, tackles, transportation, scaffolding, wastage and
incidental charges, as per approved drawings and directions of
the Engineer-in-Charge.
Add :- 18% of GST, Rs.
Add :- 1% of Qaulity Controll, Rs.
Add :- 2% of Contingency Charges, Rs.
SBD SECTION-7 BILL OF QUANTITIES-179
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ.pdf
Notes.pdf
STANDARD BIDDING DOCUMENTS.pdf
Other Important-1.pdf
Other Important-2.pdf
Other Important-3.pdf
Other Important-4.pdf
Other Important-5.pdf
Other Important-6.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .