Tender ID
Tender Value
₹98.5 L
EMD Value
₹99,000
Closing Date
9 Mar 2026, 6:00 pmClosed
Executive Engineer, Saurashtra Branch Canal Division No.6/1,Morbi
Maintenance & Repair of Morbi Branch Canal between 85.310 Km to 118.60 Km for year (2026-27)
277340
Tender Notice No. 08 of 2025-26
Open
Civil Works - Canal
Works
Morbi
7 documents required · 7 mandatory
₹2,832
Yes
Executive Engineer SBC Dn No. 6/1, Morbi
₹99,000
Yes
16 Feb 2026
16 Feb 2026
16 Feb 2026
9 Mar 2026
16 Feb 2026
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional and are
given to provide a common basis for bidding. The basis of payment will be the actual
quantities of work ordered and carried out, as measured by the Contractor and verified
by the Engineer and valued at the rates and prices tendered in the priced Bill of
Quantities, where applicable, and otherwise at such rates and prices as the Engineer
may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far as it
is otherwise provided under the Contract, include all construction plant, layout,
supervision, materials, erection, maintenance, insurance, profit, taxes and duties,
together with all general risks, liabilities and obligations set out or implied in the
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed to
enter a rate or price shall be deemed to be covered by other rates and prices entered in
the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included in
the items provided in the priced Bill of Quantities, and where no Items are provided
the cost shall be deemed to be distributed among the rates and prices entered for the
related items of Work.
7. General direction and descriptions of work and materials are not necessarily repeated
or summarized in the Bill of Quantities. References to the relevant sections of the
contract documentation shall be made before entering rates or prices against each item
in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for canal work Road and Bridge works. For building works
specifications for building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic error pursuant to Clause
29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of compressed air
drilling for its removal, and which cannot be extracted by ripping with a tractor of at
least 150 kw with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr.)
Name of Division: Executive Engineer, S.B.C. Dn. No. 6/1, Morbi.
Name of Maintenance & Repair of Morbi Branch Canal between 85.310 km to 118.60 km for F.Y. 2026-27.
Description of Item Qty. Unit Rate in Amount in
Item No. Rs. Rs.
Earthwork / Back filling with selected earth brought 2540 cum 141.00
from out side borrow area or from excavated useful
1 material incl. watering ramming, Compaction with
pneumatic temping and all lead and lift etc complete.
Dismantalling the C.C. lining including including 6495 Sq.mt 116.00
2 disposing off the dismentalled materials as directed
Providing and Laying in position Controlled 5145 Sq.mt 496.57
Plain/Reinforced Cement Concrete Lining of M-15
grade in Bed, Side Slopes and Curvature including
batching, mixing, transporting, placing, vibrating,
smooth finishing, membrane curing (by curing
compound only) & providing bituminous joints of
3 specific interval including minor filling/ depression
with murrum / earth / soil as per site condition to
correct profile, watering, compaction, trimming etc to
provide lining. For 10 cms thick cast-in-citu canal
lining in M-15 grade of conc. with Cement level-300
kg & MSA-20 mm (Without Using Paver Machinaries
& without sleepers)
Providing and Laying in position Controlled 1350 Sq.mt 620.72
Plain/Reinforced Cement Concrete Lining of M-15
grade in Bed, Side Slopes and Curvature including
batching, mixing, transporting, placing, vibrating,
smooth finishing, membrane curing (by curing
compound only) & providing bituminous joints of
4 specific interval including minor filling/ depression
with murrum / earth / soil as per site condition to
correct profile, watering, compaction, trimming etc to
provide lining. For 12.5 cms thick cast-in-citu canal
lining in M-15 grade of conc. with Cement level-300
kg & MSA-20 mm (Without Using Paver Machinaries
& without sleepers)
Prov. and Laying in position Controlled cement 34.20 cum 4303.00
concrete using cement, sand and crushed aggregate by
mass and machine mix for R.C.C/CC work including
necessary formworks centering scaffolding compaction
by vibrator,curing as directed with all lead & lift etc
complete Excluding the cost of reinforcement (A)
Concrete grade M-15 and MSA-20mm
Providing,cutting,bending,binding and fixing in 5.520 MT 66268.00
position as per drawing.TMT BAR , Fe-415
6 reinforcement for R.C.C. works and anchor bars incl
cost of black annealed 16 to 18 BWG M.S.. Wire
etc.complete with all lead and lift.
Providing 'fiber glass reinforced plastic' gauge plate of 25.00 m 1993.00
4mm thickness and of following size with
Engraving/pesting bands & figures of following size
with necessary clips and fastners and fixing the same at
7 the g) site of work etc complete as directed incl.
scrubbing the wall surface to remove the deposits
gathered at gauge plate by chiseling where required.
As per drawing Width of plate 30cm.,Band width
1.0cm. Column width 1.0cm., Height of figures 7.0cm.
Clearing the silt from canal /drain bed by digging the 12755.91 cum 260.00
same to the required bed level and gradient including
depositing the excavated earth regularly on spoil bank
for utilizing the same for preparing the bund after
bracking the clods as and where directed for lead upto
30 mt and lift as under(B) Depth 3.0 to 6.0 mt
Dewatering for earthen dam and allied 1770.06 Hp- 27.00
works,foundation areas,pits,trenches etc incl cost of hrs
9 pumping machineries, pipe lines ,labours
diesel/electricity/Dgset, etc complete.
Desilting of various structures of canal and distribution 4779.15 cum 296.00
system including depositing the same as directed with
10 all lift and lead for canal syphone,air vent,Turn Out
Kundies etc complete.
Total cost of work Rs.
I/We am/are willing to carry out the work at… ....................... %above/below percent (Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………%below Add………%Above
In words In words
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item(with Quantity Unit Rate Amount
No brief specification and
reference to book of In In
specifications) figures Words
(A)Total Tendered Amount
(B)Rebate on above tendered amount (if any) % (in figure)
(C)NetTendered Amount(A-B) (in figure) ………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all P.C.C./R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as
per vernacular office letter no. 04 of 2024, Dt. 20/01/2024 of The Chief Engineer, Quality
Control (SSNNL) as stated in S.O.R. therefore in P.C.C./R.C.C. items where there is a change
as per Actual mix design the cost of difference of cement consumption have been deducted
from the rate of original item at the rate of input rate (i.e. 5448.53 Rs / MT for OPC)
mentioned in all the tender
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
61CTENDER NOTICE-ADVT-ok - Copy.pdf
boq 61c.pdf
SBD 61C.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .