Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.6 L+₹27,470.17 (11.6%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹2.6 L+₹27,896.97 (11.8%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹2.8 L+₹46,016.42 (19.5%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹2.8 L+₹48,460.80 (20.5%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.9 L
EMD Value
₹7,800
Closing Date
5 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW GANDERBAL
EXECUTIVE ENGINEER REW GANDERBAL
Construction of Culvert on Gam Kul at Bela Wussan at Wussan-B Block Kangan BDC 59
2026_RDPR_318379_2
E NIT No. 71/2026-27 of REW Ganderbal
Open Tender
Civil Works
Percentage
40 days
RDD AND PR
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Rural Development and Panchayati Raj
₹7,800
14 Aug 2026
29 Jul 2026
6 Aug 2026
29 Jul 2026
5 Aug 2026
29 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by mechanical means in trenches for foundations, drains, pipes,cables etc (not exceeding 1.5m in width) and for shafts, wells, cesspits, and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getting out excavated earth and disposal of the same as directed in all kinds of soils | 20.13 | cum | 256.85 | ₹5,170.39 |
| 2 | Providing and laying of dry stone soling dully hand packed including watering, dressing, ramming with all carriages, loading, unloading and stacking etc complete | 16.42 | cum | 1,000 | ₹16,420 |
| 3 | Provinding and laying in position cement concrete of specified grade excluding the cost of centring and shuttering all work upto plinth level in 1:4:8mix (1cement: 4coarse sand: 8 graded stone aggregate with 20mm nominal size) with all carriages, loading, unloading and stacking etc complete job | 0.65 | cum | 5,202.9 | ₹3,381.88 |
| 4 | Provinding and laying in position cement concrete of specified grade excluding the cost of centring and shuttering all work upto plinth level in 1:3:6 mix (1cement: 3coarse sand: 6 graded stone aggregate with 20mm nominal size) with all carriages, loading, unloading and stacking etc complete job | 26.44 | cum | 5,733.6 | ₹1,51,596.38 |
| 4.1 | 20% plums | 3.49 | cum | 1,000 | ₹3,490 |
| 5 | Provinding and laying in position cement concrete of specified grade excluding the cost of centring and shuttering all work upto plinth level in 1:1.5:3mix (1cement: 1.5coarse sand: 3 graded stone aggregate with 20mm nominal size) with all carriages, loading, unloading and stacking etc complete job | 6.52 | cum | 7,788.4 | ₹50,780.37 |
| 6 | Centring and shuttering including propping, strutting and removal of form work for Columns, piers, abutments, pillars, posts and struts | 37.78 | sqm | 723.2 | ₹27,322.5 |
| 7 | Centring and shuttering including propping, strutting and removal of form work for Suspended floors, roofs, landings, balconies and access platforms. | 13.01 | sqm | 718.2 | ₹9,343.78 |
| 8 | Centring and shuttering including propping, strutting and removal of form work for Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. | 42.94 | sqm | 628.95 | ₹27,007.11 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth level
Mild steel and medium tensile steel bars | 619.41 | kg | 115.35 | ₹71,448.94 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.60 MB
BOQ_1048610.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .