| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.6 LAccepted-AOC | ₹20.6 L | L1 | Accepted-AOC Lowest amount quoted by Jiju Mathew and work to be awarded. |
| 2 | Rejected-Technical THARUVANA P O | KERALA | - | - | Rejected-Technical Higher amount quoted |
| 3 | Rejected-Technical | - | - | Rejected-Technical Higher amount quoted |
| 4 | Rejected-Technical | - | - | Rejected-Technical Higher amount quoted |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
12 Feb 2021, 5:00 pmClosed
District Soil Conservation Officer, wayanad
District Soil Conservation Office, Civil Station, Kalpatta Wayanad
REBUILD KERALA INITIATIVE CONSTRUCTION OF CONCRETE CHECKDAM AT CHANGADAM UPPAN NADA. DIVERTION CHECK WITH CANAL AT KARINGARI PADASEKHARAM
2021_DSSC_410968_1
DW(3)1143/2020/CD
Open Tender
Civil Works - Others
Item Rate
150 days
VETTUTHODU WATERSHED - EDAVAKA, VELLAMUNDA
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,900
₹50,000
25 Feb 2021
4 Feb 2021
16 Feb 2021
5 Feb 2021
12 Feb 2021
5 Feb 2021
Amount
Construction of Cement Concrete Checkdam - 4 meter span at Changadam Uppan Nada - Lattitude 11°44'51.306", Longitude 75.58'44.436", Altitude - 736 m
60.1.1- RING BUND Type -1 Putting up ring bund as per approved shape 2.5m bottom width, 1 m top width using empty gunny polythene bags filled with earth placed in 2 rows at 0.6m apart and fiilled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of workks.
2.6.1- Earth Work Excavation by mechanical means (Hydraulic Excavator) / manual means in foundation trenches or drains (exceeding 30 cm in depth, 1.5m in width as well as 10 sq.m on plan) including dressing of sides and ramming bottoms, lift upto 1.5m, including getting out the excavated soil and surplus ecxcavated as directed with in a lead of 50 m. All Kind of Soil.
4.1.6 - Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All works upto plinth level 1:3:6 (1 Cement: 3 Coarse Sand: 6 graded stone aggregate 40 mm nominal size)
4.1.3 - Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All works upto plinth level 1:2:4 (1 Cement: 2 Coarse Sand: 4 graded stone aggregate 40 mm nominal size)
4.3.2 - Centering & Shuttering including Strutting, Propping etc. and removal of form work of Retaining walls, return walls (Any Thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
13.1.1 - 12mm Cement Plaster of mix 1:4 ( 1 Cement: 4 Fine Sand)
60.7.2 - DR PACKING Under Foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of depatmental officers at site
60.3 - Supplyind fixing structural steel channel ISMC 75x40mm for holding shutter planks including cutting, hoisting fixing in position with material and labour charges etc complete.
60.8 - Shutter for checkdam - Supplying and providing Thambakam wood shutter planks 5 cm thick including cost of materials and labour charges etc complete
60.2.2 - Bailing out of water using 5HP Pump - Bailing out water with 5HP engine and pump set including conveyance to site and erection, cost of fuel, lubrication oil and other stores, pay of staff etc. complete
8.2.2.2 - Providing and fixing 18mm thick gang saw cut mirror polished premoulded and prepolished, machine cut for kitchen platforms, vanity courters, window sills, laches and similar locations, of required size, approved shade, colour and texture laid over 20mm thick base cement mortar 1:4 (1 cement: 4 Coarse sand) joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels. Area of slab over 0.50 sqm
16.21 - Engraving letters in hard stone - VETTUTHODU WATERSHED , UNDER R.K.I -2020, CHECKDAM - 4.00 M SPAN, DISTRICT SOIL CONSERVATION OFFICER , WAYANAD
DIVERTION CHECK WITH CANAL AT KARINGARI PADASEKHARAM - Lat : 11°44'3.084", Longitude : 76.0°, 24.7932"
2.6.1- Earth Work Excavation by mechanical means (Hydraulic Excavator) / manual means in foundation trenches or drains (exceeding 30 cm in depth, 1.5m in width as well as 10 sq.m on plan) including dressing of sides and ramming bottoms, lift upto 1.5m, including getting out the excavated soil and surplus ecxcavated as directed with in a lead of 50 m. All Kind of Soil.
4.1.6 - Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All works upto plinth level 1:3:6 (1 Cement: 3 Coarse Sand: 6 graded stone aggregate 40 mm nominal size)
4.1.3 - Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All works upto plinth level 1:2:4 (1 Cement: 2 Coarse Sand: 4 graded stone aggregate 40 mm nominal size)
4.3.2 - Centering & Shuttering including Strutting, Propping etc. and removal of form work of Retaining walls, return walls (Any Thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
13.1.1 - 12mm Cement Plaster of mix 1:4 ( 1 Cement: 4 Fine Sand)
60.3 - Supplyind fixing structural steel channel ISMC 75x40mm for holding shutter planks including cutting, hoisting fixing in position with material and labour charges etc complete.
60.8 - Shutter for checkdam - Supplying and providing Thambakam wood shutter planks 5 cm thick including cost of materials and labour charges etc complete
60.2.2 - Bailing out of water using 5HP Pump - Bailing out water with 5HP engine and pump set including conveyance to site and erection, cost of fuel, lubrication oil and other stores, pay of staff etc. complete
8.2.2.2 - Providing and fixing 18mm thick gang saw cut mirror polished premoulded and prepolished, machine cut for kitchen platforms, vanity courters, window sills, laches and similar locations, of required size, approved shade, colour and texture laid over 20mm thick base cement mortar 1:4 (1 cement: 4 Coarse sand) joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels. Area of slab over 0.50 sqm
16.21 - Engraving letters in hard stone - VETTUTHODU WATERSHED , UNDER R.K.I -2020, DIVERTION OF CHECK- 2.00 M SPAN, DISTRICT SOIL CONSERVATION OFFICER , WAYANAD
60.1.1- RING BUND Type -1 Putting up ring bund as per approved shape 2.5m bottom width, 1 m top width using empty gunny polythene bags filled with earth placed in 2 rows at 0.6m apart and fiilled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of workks.
Thomas P M
SAJAR A
NAJMUDHEEN K
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_584014.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].