Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical FATEHPUR FATEHPUR FATEHPUR RAJAURI JAMMU KASHMIR 185131 | RAJOURI | JAMMU AND KASHMIR | 185131 | Accepted-Technical as per sbd |
| 2 | Accepted-Technical | Accepted-Technical as per sbd |
| 3 | Accepted-Technical | Accepted-Technical as per sbd |
| 4 | Accepted-Technical | Accepted-Technical as per sbd |
| 5 | Accepted-Technical | Accepted-Technical as per sbd |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
1 Jun 2026, 4:00 pmClosed
EXECUTIVE ENGINEER STD-IV, JPDCL KALAKOTE
OFFICE OF EX. ENGINEER STD-IV, JPDCL KALAKOTE
ANNUAL RATE CONTRACT FOR CARRYING OUT DAY TO DAY ROUTINE MAINTENANCE/REPAIR WORKS RELATED TO 33/11KV RECEIVING STATIONS and 33KV LINES IN DISTRICT RAJOURI FY 2026-27
2026_PDD_309793_1
STD-IV/JPDCL/04 of 2026-27
Open Tender
Electrical and Maintenance Works
Empanelment
Kalakote
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
Executive Engineer Sub Transmission Div-iv Kalakot
₹2 L
23 Jun 2026
12 May 2026
2 Jun 2026
12 May 2026
1 Jun 2026
12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Erection of 16 mtr long Steel Tubular Pole with planting depth of 1/6 th of the height of the pole including digging of pits, disposal of extra earth, collection of boulders and filling back. | 1 | No. | 4,804 | ₹4,804 |
| 3 | Erection of 13 mtr long Steel Tubular Pole with planting depth of 1/6 th of the height of the pole including digging of pits, disposal of extra earth, collection of boulders and filling back. | 1 | No. | 3,502 | ₹3,502 |
| 4 | Erection of 11 mtr long Steel Tubular Pole with planting depth of 1/6 th of the height of the pole including digging of pits, disposal of extra earth, collection of boulders and filling back. | 1 | No. | 2,712 | ₹2,712 |
| 5 | Erection of 9 mtr long Steel Tubular Pole with planting depth of 1/6 th of the height of the pole including digging of pits, disposal of extra earth, collection of boulders and filling back. | 1 | No. | 1,973 | ₹1,973 |
| 6 | Erection of 13 mtr long PCC Pole with planting depth of 1/6 th of the height of the pole including digging of pits, disposal of extra earth, collection of boulders and filling back. | 1 | No. | 2,500 | ₹2,500 |
| 7 | Erection of 11 mtr long PCC Pole with planting depth of 1/6 th of the height of the pole including digging of pits, disposal of extra earth, collection of boulders and filling back. | 1 | No. | 2,000 | ₹2,000 |
| 8 | Erection of 9 mtr long PCC Pole with planting depth of 1/6 th of the height of the pole including digging of pits, disposal of extra earth, collection of boulders and filling back. | 1 | No. | 1,500 | ₹1,500 |
| 9 | Painting of 16 mtr long Steel Tubular Pole including fixtures with one coat of red-oxide and two coats of silver(aluminium) paint | 1 | No. | 455 | ₹455 |
| 10 | Painting of 13 mtr long Steel Tubular Pole including fixtures with one coat of red-oxide and two coats of silver(aluminium) paint | 1 | No. | 444 | ₹444 |
| 11 | Painting of 11 mtr long Steel Tubular Pole including fixtures with one coat of red-oxide and two coats of silver(aluminium) paint | 1 | No. | 400 | ₹400 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
cancelled_1.pdf
pdf • 0.17 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
Tendernotice_2.pdf
PDF • 1.15 MB
BOQ_1002694.xls
BOQ • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .