| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAdmitted-Finance | ₹1.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.3 CrAdmitted-Finance THIRUCHIRAPPALLI THIRUCHIRAPPALLI TAMIL NADU | ARIYALUR | TAMIL NADU | 608901 | ₹2.3 Cr | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | S S CONSTRUCTIONS L1 | M RAMESH L2 |
|---|---|---|---|---|---|
| 1.00 | Upgradation of the road from (MRL-05) malvai to alunthalaipudur Km 0/0-5.98 Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. | 17,940 | Sqm | - | - |
| 2.00 | Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 7,392.37 | Sqm | - | - |
| 3.00 | Construction of Subgrade and earthen Shoulders with approved material obtained from borrow pits with all lifts and leads , transporting to site ,Spreading ,grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000m as per Technical Specification clause 303.1.(sub grade)KM.0/000-1/000 | 681.06 | CUM | - | - |
| 4.00 | KM.1/000-2/000 | 697.77 | CUM | - | - |
| 5.00 | KM.2/000-3/000 | 707.46 | CUM | - | - |
| 6.00 | KM.3/000-4/000 | 711.76 | CUM | - | - |
| 7.00 | KM.4/000-5/000 | 672.98 | CUM | - | - |
| 8.00 | KM.5/000-5/950 | 687.2 | CUM | - | - |
| 9.00 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel shoulder)KM.0/000-1/000 | 554.28 | CUM | - | - |
| 10.00 | KM.1/000-2/000 | 557.55 | CUM | - | - |
Tender Value
₹1.9 Cr
EMD Value
₹3.8 L
Closing Date
11 Jun 2020, 3:00 pmClosed
Project Director
DRDA Tiruchirappalli
Up gradation of 1 road in Pullambadi Block in Tiruchirappalli District under PMGSY III Batch I 2019-20 Package No.TN22-146
2020_RDTN_92310_1
TN22146
Open Tender
Civil Works - Roads
270 days
Tiruchirappalli
As per schedule
5 documents required · 5 mandatory
₹0
₹3.8 L
DRDA Tiruchirappalli
24 Jun 2020
13 May 2020
11 Jun 2020
13 May 2020
11 Jun 2020
13 May 2020
27 May 2020
Amount
Upgradation of the road from (MRL-05) malvai to alunthalaipudur Km 0/0-5.98 Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
Construction of Subgrade and earthen Shoulders with approved material obtained from borrow pits with all lifts and leads , transporting to site ,Spreading ,grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000m as per Technical Specification clause 303.1.(sub grade)KM.0/000-1/000
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel shoulder)KM.0/000-1/000
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.(WMM)KM.0/000-1/000
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502KM.0/000-0/200
Providing and applying primer coat with cationic bitumen emulsion(water based) modified with Nanotechnology based Penetrative Reactive Water-soluble Organosilane material (forming water clear solution) qualifying as per the test, on prepared surface of granular base including cleaning of road surface and prime coat-mix made using 100 part Cationic Bitumen Emulsion (Grade CSS-1) and 200 parts of Nanotechnology Solution (1 kg Terraprime :200 liter water (≤1000ppm TDS) and spraying at the rate of 1.35 Kg/sqm using mechanical means as per Technical Specification. KM.0/200-1/000
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.KM.0/000-0/200
Providing and applying tack-coat with cationic bitumen emulsion (CRS-1) in mixing ratio of 0.014 part Nanotechnology based Penetrative Reactive Water-soluble Organosilane material (forming water clear solution) : 1 part water (<1000 ppm TDS) : 1 part cationic bitumen emulsion and spraying using emulsion distributor at the rate of 1.2 times of conventional spray rate 0.275 Kg per sqm (i.e 0.33 kg/sqm) on the prepared new bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503 .(ref:Mord pg.no 5-4)KM.0/200-1/000
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 509KM.0/000-0/200.
Providing, laying and rolling of 20mm thick open-graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder with Nanotechnology based Organosilane Reactive Aggregate modifier material qualifying as per the test at the rate of 1 Kg per 1 ton of Binder. Providing, laying and rolling of open-graded premix carpet of 20mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade or emulsion grade with Nanotechnology based material to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. (ref:Mord pg.no 5-24)KM.0/200-1/000
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510KM.0/000-0/200
Providing and laying of Seal coat modified with Nanotechnology based Organosilane Reactive Aggregate modifier material qualifying as per the test at the rate 1 Kg per 1 ton of Binder and sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per technical specification Clauses 510.KM.0/200-1/000
Waterproofing of the shoulder surface by spraying 1kg of Terrasil or Equivalent and 1kg of Zycobond or Equivalent in the ratio of 1:1:200 with Potable Water and spraying on the surface @ 3ltrs/sqm and compacting with a static roller. Complete job, finished work to be measuredKM.0/200-1/000
Provision of rumble strips covered with Premix bituminous carpet 15-20 mm high at centre,250mm wide placed at 1m centre to centre at approved locations to control speed marked with white strips of road marking paintKM.0/000-1/000
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.1.50 M SPAN RCC SLAB CULVERT CH 5965
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.For Footing as 4% rate for Centering Works
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. For Stem as 10% rate for Centering Works
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft Paper With out Claiming extra as directed by departmental officers complete complying with Standard Specifications.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Providing Fixing 20mm thick Compressible Fiber Board in expansion joint complete as per drawing and MORD technical Specification
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Provision For Name Board
Provision For Chevron sign Octaganal Board
Provision For PMGSY Logo Board
Provision For Sign board (1curve=2nos)
Provision For Caution Board Near Culverts
Provision For Reflectors Near Culverts
Provision For Citizen board
Provision For Maintanenceboard
Provision For KM Stone
Provision For HM Stone
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
M RAMESH
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.08 MB
TechnicalBid146.pdf
Tender Documents • 0.64 MB
PriceBid146.pdf
Additional Documents • 0.13 MB
BOQ_158339.xls
BOQ • 0.32 MB