Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.6 Cr+₹6.8 L (4.43%)Admitted-Finance TUTICORIN | TUTICORIN | TAMIL NADU | 626202 | ₹1.6 Cr+₹6.8 L (4.43%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Ramesh Enterprises L2 | GREEN AND BLUE FACILITY MANAGEMENT SERVICES L1 |
|---|---|---|---|---|---|
| 1.00 | Sweeping and mopping of the office floors (Flooring with ceramic / marble / granite tiles) steps, staicase, handrails with scented cleaning agents including clearing and disposal of waste papers daily, Dusting and cleaning of files records in racks, furnitures for twice in a week, cleaning of all partition walls, ceilings [Brick, Wooden & Aluminum, Glazed],Staircase, hand rails, doors, windows, blinds, Name boards,Electrical fittings viz. Tube Lights, fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside Office complex, with all general cleaning inside the office Floors etc… complete as directed by the Engineer at site including the cost of all labour, labour uniforms lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets, cost of all consumables etc.., | 6,52,110 | m2 | 1.85 ₹12,06,403.5 | 1.77 ₹11,54,234.7 Lowest |
| 2.00 | Sweeping and cleaning of the office floors (Flooring with cement mortar) steps, staircase, handrails with scented cleaning agents including clearing and disposal of waste papers and debris daily, Dusting and cleaning of files records in racks furnitures for twice in a week, cleaning of all partition walls, ceilings [Brick, Wooden & Aluminum, Glazed],Staircase, hand rails, doors, windows, blinds, Name boards,Electrical fittings viz. Tube Lights, fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside Office complex, with all general cleaning inside the office Floors etc… complete as directed by the Engineer at site including the cost of all labour, labour uniforms lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets, cost of all consumables etc.., (To be carried out daily) | 53,94,760 | m2 | 1.6 ₹86,31,616 | 1.52 ₹82,00,035.2 Lowest |
| 3.00Sweeping and cleaning of the office floors (Flooring with cement mortar) steps, staircase, handrails with scented cleaning agents including clearing and disposal of waste papers and debris daily, Dusting and cleaning of files records in racks furnitures for twice in a week, cleaning of all partition walls, ceilings [Brick, Wooden & Aluminum, Glazed],Staircase, hand rails, doors, windows, blinds, Name boards,Electrical fittings viz. Tube Lights, fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside Office complex, with all general cleaning inside the office Floors etc… complete as directed by the Engineer at site including the cost of all labour, labour uniforms lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets, cost of all consumables etc.., (To be carried out daily) | |||||
| 3.01 | Eastern wing toilet from 1st floor to 10th floor in NPKRR Maaligai (one toilet block consists of 2 urinals, 1 wash basins, 1 water closet). | 120 | m2 | 2,500 ₹3,00,000 | 2,444 ₹2,93,280 Lowest |
| 3.02 | Western wing toilet from 1st floor to 10th floor in NPKRR Maaligai (one toilet block consists of 2 urinals, 1 wash basins, 1 water closet). | 120 | m2 | 2,500 ₹3,00,000 | 2,444 ₹2,93,280 Lowest |
| 3.03 | Central Portion Gents toilet from G floor to 10th floor in NPKRR Maaligai (one toilet block consists of 5 urinals, 2 wash basins, 3 water closets ) | 132 | m2 | 7,400 ₹9,76,800 | 7,377 ₹9,73,764 Lowest |
| 3.04 | Central Portion Ladies toilet from 1st floor to 10th floor in NPKRR Maaligai one toilet block consists of 1 wash basins, 4 water closets and 1 squatting urinal. | 132 | m2 | 4,600 ₹6,07,200 | 4,572 ₹6,03,504 Lowest |
| 3.05 | Cleaning of officers toilet (consists of 1 no closet, 1 no wash basin) | 120 | m2 | 1,300 ₹1,56,000 | 1,265 ₹1,51,800 Lowest |
| 3.06 | Howard Hall Toilet block (consists of 1 urinal, 6 wash basins, 2 water closets) with sweeping and mopping of conference hall floor area | 12 | m2 | 15,000 ₹1,80,000 | 14,640 ₹1,75,680 Lowest |
| 4.00 | Maintenance charges for cleaning of man hole chambers and connected drainage lines between manholes once in a month or as and when necessary and as directed by the Engineer at site so as to have free flow of waste water into the main line leads to corporation line by removing the RCC/cast iron man hole covers from manholes, cleaning/ removing all the solid wastes, sediments and silt deposition accumulated in the manholes and in between drainage lines by using with proper tools and tackles such as bamboo sticks, MS rods, PVC cable, other equipment and its hire charges, cleaning the wastes away from the EB complex. | 348 | m2 | 600 ₹2,08,800 | 546 ₹1,90,008 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
23 Mar 2023, 12:00 pmClosed
THE SUPERINTENDING ENGINEER/ CIVIL DISTRIBUTION
Office of the Superintending Engineer/ Civil Distribution, 4th Floor, Western wing, N. P. K. R. R. Maligai, No.144, Anna salai, Chennai-2.
TANGEDCO Housekeeping and allied Toilet maintenance works at NPKRR Maaligai for the year 2023-24
2023_EB_295292_1
SE/C/Dist./18/ 2022 - 23
Open Tender
Maintenance Services
Item Rate
365 days
chennai
As per Specification
5 documents required · 5 mandatory
₹0
₹1.3 L
Yes
13 Apr 2023
16 Mar 2023
24 Mar 2023
16 Mar 2023
23 Mar 2023
16 Mar 2023
Amount
Sweeping and mopping of the office floors (Flooring with ceramic / marble / granite tiles) steps, staicase, handrails with scented cleaning agents including clearing and disposal of waste papers daily, Dusting and cleaning of files records in racks, furnitures for twice in a week, cleaning of all partition walls, ceilings [Brick, Wooden & Aluminum, Glazed],Staircase, hand rails, doors, windows, blinds, Name boards,Electrical fittings viz. Tube Lights, fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside Office complex, with all general cleaning inside the office Floors etc… complete as directed by the Engineer at site including the cost of all labour, labour uniforms lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets, cost of all consumables etc..,
Sweeping and cleaning of the office floors (Flooring with cement mortar) steps, staircase, handrails with scented cleaning agents including clearing and disposal of waste papers and debris daily, Dusting and cleaning of files records in racks furnitures for twice in a week, cleaning of all partition walls, ceilings [Brick, Wooden & Aluminum, Glazed],Staircase, hand rails, doors, windows, blinds, Name boards,Electrical fittings viz. Tube Lights, fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside Office complex, with all general cleaning inside the office Floors etc… complete as directed by the Engineer at site including the cost of all labour, labour uniforms lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets, cost of all consumables etc.., (To be carried out daily)
Sweeping and cleaning of the office floors (Flooring with cement mortar) steps, staircase, handrails with scented cleaning agents including clearing and disposal of waste papers and debris daily, Dusting and cleaning of files records in racks furnitures for twice in a week, cleaning of all partition walls, ceilings [Brick, Wooden & Aluminum, Glazed],Staircase, hand rails, doors, windows, blinds, Name boards,Electrical fittings viz. Tube Lights, fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside Office complex, with all general cleaning inside the office Floors etc… complete as directed by the Engineer at site including the cost of all labour, labour uniforms lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets, cost of all consumables etc.., (To be carried out daily)
Eastern wing toilet from 1st floor to 10th floor in NPKRR Maaligai (one toilet block consists of 2 urinals, 1 wash basins, 1 water closet).
Western wing toilet from 1st floor to 10th floor in NPKRR Maaligai (one toilet block consists of 2 urinals, 1 wash basins, 1 water closet).
Central Portion Gents toilet from G floor to 10th floor in NPKRR Maaligai (one toilet block consists of 5 urinals, 2 wash basins, 3 water closets )
Central Portion Ladies toilet from 1st floor to 10th floor in NPKRR Maaligai one toilet block consists of 1 wash basins, 4 water closets and 1 squatting urinal.
Cleaning of officers toilet (consists of 1 no closet, 1 no wash basin)
Howard Hall Toilet block (consists of 1 urinal, 6 wash basins, 2 water closets) with sweeping and mopping of conference hall floor area
Maintenance charges for cleaning of man hole chambers and connected drainage lines between manholes once in a month or as and when necessary and as directed by the Engineer at site so as to have free flow of waste water into the main line leads to corporation line by removing the RCC/cast iron man hole covers from manholes, cleaning/ removing all the solid wastes, sediments and silt deposition accumulated in the manholes and in between drainage lines by using with proper tools and tackles such as bamboo sticks, MS rods, PVC cable, other equipment and its hire charges, cleaning the wastes away from the EB complex.
Maintenance charges for the water supply arrangements in NPKRR Maaligai of all floors in two shifts (8hours/shift) per day for pumping water from the main ground sump to the Over Head Tanks daily with uninterrupted water supply to all the floors of NPKRR Building by controlling suitable valves at periodic intervals and closing the water supply daily after stipulated hours. The work includes attending the break down works such as repair of damaged pipelines including waste water lines to restore water supply (for which the materials will be supplied Departmentally). The rate is inclusive of all necessary labour, lead, lift, T&P required for works etc. complete.
GST for bidders within TamilNadu Note : Bidders within Tamil Nadu shall enter values separately for SGST and CGST and shall enter the value as "Zero" for IGST.
GST for bidders outside TamilNadu Note: Bidders outside Tamil Nadu shall enter value only for IGST and shall enter the value as "Zero" for SGST and CGST .
Ramesh Enterprises
Bidder Name
Ramesh Enterprises
GREEN AND BLUE FACILITY MANAGEMENT SERVICES
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .